You are on page 1of 22

QUALIFICATION

Resume
Bsc. (Hons) Construction Management
(Graduated July 1997)
Anglia Polytechnic University, United
Kingdom
Thesis Title: Project Management (P3)-
Infrastructure/ Highway
Study case: KLIA-roadway & London Dockland
Project UK

Dip. Town Regional Planning


University Institute Technology Mara (UiTM)
Thesis title: Public Transportation Planning
HAJI MOHD NAWAHIDUDIN Study Case: Kota Bharu Kelantan
BIN MAHAMAD ISA
Registration Professional Body/DOE, EIA
Consultant of Malaysia (CS 0350)
Specialisme:
 Socio Impact Assessment
 General Environment Management
 Traffic Impact Assessment

COMPANY WORKING EXPERIENCE


NILAIMAS SERVICES 1992-1995- (Perunding Atur Sdn. Bhd)
Asst. Transport Planner
POSITION
1997-1999-(Bumihighway Sdn. Bhd)
Planning Designer
MANAGING DIRECTOR
1999-2000- (Kuala Lumpur City Centre Berhad)
Planning Engineer

2001-2004- (Putrajaya Holdings Sdn Bhd)


Sr. Engineer (Development Div.)
03-89409959/ 013-3850268
2004-2006- (Putrajaya Holdings Sdn Bhd)
Asst. Manager (Development Div.)

2007- till to date MD of Al Usrah Urusniaga


nilaimas@gmail.com 2009- till to date Director ZNY Global Sdn Bhd

2010- till to date Director of Nilaimas Services

http://nilaimas.blogspot.my/
CERTIFICATES AND
LIST OF PROJECTS
Dengan ini disahkan bahawa
NILAIMAS SERVICES
18A, JALAN P9/B1,
PRESINT 9, PUTRAJAYA,
62050 , PUTRAJAYA , WILAYAH PERSEKUTUAN

Telah berdaftar dengan Tenaga Nasional Berhad sebagai


Perunding Perkhidmatan
di bawah kategori yang tercatat dalam sijil ini
*********************************************************************************************************
340201, 340202***

*********************************************************************************************************

BUTIR-BUTIR PENDAFTARAN
NO PENDAFTARAN TNB : 3050719
NO PENDAFTARAN SYARIKAT : 1953513D
NO SIJIL KEMENTERIAN KEWANGAN : J22006322151388335
TEMPOH SAHLAKU SEHINGGA : 12.01.2018
TARAF : TIDAK BERKAITAN
LAIN-LAIN PENDAFTARAN :

Tarikh tempoh sahlaku pendaftaran ini adalah tertakluk kepada tempoh sahlaku Pendaftaran sijil-sijil
Kementerian Kewangan(KK), Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB) dan sijil-sijil
professional yang berkaitan.

Ir. Syed Abu Hanifah bin Syed Alwi


Ketua Pegawai Perolehan
Bahagian Perolehan
Tenaga Nasional Berhad Tarikh kelulusan : 27.02.2017

Ini adalah cetakan komputer dan tidak memerlukan tandatangan.


WORKING EXPERIENCE

SAMPLE OF PHOTOS SAMPLING WATER, AIR & NOISE


PHOTOS YEAR PROJEK STATUS
2016 CADANGAN PEMBANGUNAN INDUSTRI YANG MENGANDUNGI SEBUAH COMPLETE
BANGUNAN PEJABAT 2 TINGKAT, SEBUAH KILANG SETINGKAT DAN
SEBUAH PONDOK PENGAWAL, RUMAH PAM, KEBUK SAMPAH DAN
PENCAWAN ELEKTRIK DI ATAS SEBAHAGIAN LOT PT 179 (SELUAS 3.410
EKAR) LEBOH SULTAN SULEIMAN, MUKIM KAPAR DAERAH KLANG
BANDAR DIRAJA SELANGOR DARUL EHSAN UNTUK TETUAN SINERGI
PERDANA SDN. BHD. PEMBANGUNAN KILANG MEMPROSES BAJA.

2015 CADANGAN PEMBANGUNAN BERCAMPUR (PERUMAHAN & COMPLETE


PERNIAGAAN) DI ATAS SEBAHAGIAN LOT 6933, K.KETIL MUKIM TAWAR
DAERAH BAHAGIAN KEDAH UNTUK TETUAN BDB LAND SDN. BHD.
2015 PENILAIAN AM IMPAK ALAM SEKITAR & CADANGAN KONSEP MITIGASI COMPLETE
UNTUK KELULUSAN JABATAN PERHUTANAN NEGERI KELANTAN BAGI
PROJEK PEMBANGUNAN SEMULA HUTAN & MENJALANKAN
PENYELESAIAN TEROKA HARAM DALAM HUTAN SIMPAN KEKAL (KSK)
ULU GALAS UNTUK TERLIBAT DENGAN MASALAH PENEROKAAN
HARAM.

2017 PROJEK CADANGAN MEMBINA & MENYIAPKAN JAJARAN 10KM COMPLETE


LEBUHRAYA RAKYAT DARI MACHANG KE KUALA KRAI, KELANTAN
DARUL NAIM YANG MENGHUBUNGKAN BUKIT TIU DAN BERANGAN
MEK NAB

2016 PROJEK MENAIKTARAF TEROWONG DI PERSIMPANGAN JALAN N17 COMPLETE


DAN FT 195 BANDAR SRI SEDAYAN DAERAH SEREMBAN, NEGERI
SEMBILAN DARUL KHUSUS.
2014 PROPOSED SANITARY LANDFILL AT RIMBA MAS, MUKIM TITI TINGGI, COMPLETE
PERLIS

2015 THE PROPOSED CONSTRUCTION AND COMPLETION OF HORIZONTAL COMPLETE


COLLECTOR WELLS, PIPELINES AND ASSOCIATED WORKS IN KG.
SEMURA FOR LOJI RAWATAN AIR KELAR FOR PASIR MAS HALAL PARK
KELANTAN DARUL NAIM FOR THE EAST COAST ECONOMIC REGION
DEVELOPMENT COUNCIL (ECERDC)

2014 CADANGAN MEMBINA DAN MENYIAPKAN 1680 UNIT PERUMAHAN COMPLETE


PENJAWAT AWAM 1 MALAYSIA (PPA1M) DI ATAS PLOT 6R9, P.T 13069
PRESINT 6 WILAYAH PERSEKUTUAN PUTRAJAYA MALAYSIA UNTUK
PERBADANAN PUTRAJAYA.
2015 PROJEK MENAIKTARAF JALAN NEGERI B 27 JALAN RAWANG-BATANG COMPLETE
BERJUNTAI (FASA 2) DARI PERSIMPANGAN BANDAR COUNTRY HOMES
KE SEMPADAN DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN.

2015 CADANGAN PROJEK MOVENPICK RESORT & SPA SELUAS 18050 METER COMPLETE
PERSEGI ATAS LOT 60022 MUKIM CENDERING, DAERAH KUALA
TERENGGANU, TERENGGANU DARUL IMAN.
2016 CADANGAN MENINGKATKAN TARAF KAPASITI SIMPANAN AIR BAGI COMPLETE
EMPANGAN SUNGAI CHEROK DI SUNGAI CHEROK, GENTING
HIGHLANDS, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR, UNTUK TETUAN GENTING MALAYSIA BERHAD.

2015 CADANGAN PERMOHONAN KEBENARAN TERHAD UNTUK COMPLETE


MENJALANKAN KERJA-KERJA PERUSAHAAN KUARI DAN STRUKTUR
SOKONGAN SEMENTARA SEDIA ADA DI MUKIM KECHIL, DAERAH
BANDAR BAHARU, KEDAH UNTUK TETUAN BERKAT DASAR BUMI SDN
BHD.

2016 EIA (2ND SCHD) FOR PROPOSED DEVELOPMENT OF TRANSMISSION COMPLETE


LINE(OHL 132 KV DOUBLE CIRCUIT) FROM NEW SWICTHING STATION
TO TEKAI HIDROELECTRIC DISTRICT OF JERANTUT PAHANG DM
2015 PROJEK MENAIKTARAF JALAN UTAMA BANDAR SRI SENDAYAN DAN COMPLETE
ESTEK KE KLIA YANG MELIBATKAN BANDAR ENSTEK DAN BANDAR SRI
SENDAYAN ,NEGERI SEMBILAN.

2016 PROPOSED EARTHWORKS AND OTHER RELATED WORKS FOR COMPLETE


THESECOND PHASE DEVELOPMENT OF TECHNOLOGY PARK MALAYSIA ,
BUKIT JALIL, KUALA LUMPUR.
2016 PROPOSED FOREST PLANTATION AT HUTAN SIMPAN KEKAL BETIS COMPLETE
(PART OF COMPARTMENT 177, PART OF COMPARTMENT 190 & PART
OF COMPARTMENT 191) MUKIM ULU NENGGIRI DAERAH BERTAM,
JAJAHAN GUA MUSANG.

You might also like