You are on page 1of 8

_______________________________________________________________________________________

For the Post of “Quantity Surveyor”

A full time challenging position in the competitive environment, where education and
work experience have impact on the performance resulting in the growth and productivity of
the organization.

Name : Ch. Waqas Ahmad


Father’s Name : Ch. Mukhtar Ahmed
Date of Birth : 15th November, 1986
C.N.I.C : 36502-2124692-9
Marital Status : Married
Address : House No 469, B-VIII Street No 03, Gulshan
Colony, Sahiwal.

Cell no. : 0321-3411082 & 0300-4999015


E-mail : waqasahmad469@gmail.com

D.A.E (Civil) : Govt. College of Technology Sahiwal. (Year 2004)

Matriculation : Govt. Comprehensive High School Sahiwal. (Year 2001)

1. Auto Cad & Eagle point.


2. MS Office (Word, Excel & Power Point)
3. Preparation of Programming in Excel of Road X-Section Plotting and Drawings etc.
4. Installation (Windows & Software’s)
PROJECT CONSTRUCTION OF ZIARAT MOR – KACH – HARNAI
SANJAVI ROAD PROJECT FROM KM 0+000 TO KM
165+300 (LENGTH = 165.3 KM)

EMPLOYER ASSOCIATED CONSULTANCY CENTER (PVT) LTD

CLIENT NATIONAL HIGHWAY AUTHORITY

POSITION HELD SENIOR QUANTITY SURVEYOR

DURATION FROM August - 2021~ TO till date.

RESPONSIBILITIES Working as Quantity Surveyor at above mentioned


Project. Responsible for Checking and verification of
Interim Payment Certificate, Escalation Payment
Certificates, X-Sections, Shop Drawings, and Bar
Bending Schedule. Preparation of Daily, Weekly &
Monthly Progress Report Record maintaining and file
keeping.

MAIN PROJECT FEATURES Carriageway width 6.1m, Inner & Outer Shoulder 1.5m
each (Breaking of Existing Road , Water Bound
Macadam 15cm, Sub Base 20cm, Triple Surface
Treatment on carriageway and shoulders.
183 Slab Culvert, 401 m causeway, 12 Bridges, Drains,
and Stone masonry Breast walls etc.

PROJECT ADB ASSISTED FERP LOAN NO 3378-PAK.


PNHRP/PACKAGE-5 REHABILITATION OF NATIONAL
HIGHWAYS D.I.KHAN ~ PESHAWAR (N-55)
KM 935+000 TO KM 1228+000 (LENGTH = 39.00 KM)

EMPLOYER SMEC INTERNATIONAL (PTY) LTD. J.V WITH


ENGINEERING GENERAL CONSULTANTS
EGC (PVT) LTD.

CLIENT NATIONAL HIGHWAY AUTHORITY

POSITION HELD QUANTITY SURVEYOR

DURATION FROM April - 2018~ TO July 2021.

RESPONSIBILITIES Working as Quantity Surveyor at above mentioned


Project. Responsible for Checking and verification of
Interim Payment Certificate, Escalation Payment
Certificates, X-Sections, Shop Drawings, and Bar
Bending Schedule. Preparation of Daily, Weekly &
Monthly Progress Report Record maintaining and file
keeping.

MAIN PROJECT FEATURES 2 Lane N-55, Inner Shoulder 1.7m & 3.0m and Outer
Shoulder 3.0 m. (Breaking of Existing Road , Aggregate
Base Course 20cm Minimum, Asphaltic Base Course 09
& 14 cm and Asphaltic Wearing Course 5cm.
Pusha Bridges 1 No.
PROJECT KARACHI – LAHORE MOTORWAY PROJECT (KLM)
ABDUL HAKEEM – LAHORE SECTION – III FROM
KM 917+000 TO 1009+000 LENGTH = 92.00 KM
EMPLOYER M/S ZEERUK INTERNATIONAL (PVT) LTD (QA&QCC).

CLIENT NATIONAL HIGHWAY AUTHORITY

POSITION HELD SENIOR QUANTITY SURVEYOR

DURATION FROM MAY - 2016~ TO April-2018.

RESPONSIBILITIES Working as Senior Quantity Surveyor at above


mentioned Project. Responsible for Checking and
verification of Interim Payment Certificate, X-Sections,
Shop Drawings, Bar Bending Schedule and As Built
Drawings. Preparation of Daily, Weekly & Monthly
Progress Report Record maintaining and file keeping.

MAIN PROJECT FEATURES 6 Lane Motorway (Each lane 3.65m, Shoulder 3m. Sub
grade 30cm, Sub Base 20cm, Aggregate Base Course
34cm, Asphaltic Base course 16cm and Asphaltic
Wearing Course 05cm. Structures (Bridges 19 Nos.
Underpass 30 Nos., Cattle Creep 81 Nos. Box Culvert
134 Nos. Pipe Culverts 194 Nos. Guard Rail, Dykes,
Fence arrangements, Sign Boards. Allied Facilities: Rest
Area 2 Nos, Service Area 01 No and Toll Plaza & Weigh
Station 2 Nos. etc.

PROJECT OVERLAY AND MODERNIZATION OF LAHORE –


ISLAMABAD MOTORWAY (M-2) ON BOT BASIS
SECTION –II PINDI BHATTIAN TO KALLAR KAHAR
FROM KM 119+000 TO 242+000 LENGTH = 123.00 KM
EMPLOYER M/S ZEERUK INTERNATIONAL (PVT) LTD (QCC).

CLIENT MOTORWAY OPERATIONS AND REHABILITATION


ENGINEERS (MORE).

POSITION HELD QUANTITY SURVEYOR


DURATION FROM MAR- 2015 ~ TO MAY - 2016.

RESPONSIBILITIES Working as Quantity Surveyor at above mentioned


Project. Responsible for Checking and verification of
Interim Payment Certificate, Shop Drawings, Bar Bending
Schedule and As Built Drawings. Preparation of Daily,
Weekly & Monthly Progress Report Record maintaining
and file keeping.

MAIN PROJECT FEATURES 6 Lane Motorway (Each lane 3.65m , Shoulder 3m)
(Milling of Existing Road 5cm and 13 cm, Asphaltic Base
Course 8cm and Asphalt Wearing Course 5cm. JPCP &
JRCP, French Drain, Geo Textile and Geogrid.
Ancillary works (Renovation of Toll Plaza, Sign Boards,
Pavement Marking, Reflectorized Studs, and Guard Rail
Etc.

PROJECT ADB ASSISTED FERP LOAN NO 27442.


REHABILITATION OF ROHRI ~ PANU AQIL SECTION
(N-5) SOUTH BOUND CARRIAGEWAY KM 457+000
TO KM 497+000 (LENGTH = 27.96 KM)

EMPLOYER SMEC INTERNATIONAL (PTY) LTD. J.V WITH


ENGINEERING GENERAL CONSULTANTS
EGC (PVT) LTD.

CLIENT NATIONAL HIGHWAY AUTHORITY

POSITION HELD QUANTITY SURVEYOR

DURATION FROM AUG 2013~ TO MAR-2015.

RESPONSIBILITIES Working as Quantity Surveyor at above mentioned


Project. Responsible for Checking and verification of
Interim Payment Certificate, variation order, Shop
Drawings, Bar Bending & Work Schedules Quantity of
Earth Work, Sub Base, Aggregate Base Course, Asphalt
Concrete Base Course, Asphalt Concrete Wearing
Course, T.S.T & Structure works and Preparation of
Progress Reports (Weekly & Monthly).Record
maintaining and file keeping.

MAIN PROJECT FEATURES 2 Lane South bound N-5, Inner Shoulder 1m and Outer
Shoulder 3m. (Breaking of Existing Road , Aggregate
Base Course 15cm Minimum, Asphaltic Base Course 14
cm and Asphaltic Wearing Course 5cm. Bridges 2 Nos.
PROJECT 1. W/I OF LAHORE JARANWALA FAISALABAD
JHANG BHAKKAR TO DARYAKHAN ROAD
LENGTH=107.82 KMS DISTRICT BHAKKAR.
2. 2. W/I of HARNOLI TO WAN BACHRAN TO MUSA
KHEL LENGTH=48.91 KMS IN DISTRICT MIANWALI.
3. W/I OF KALOORKOT TO DARYAKHAN ROAD
LENGTH=44.50 KMS DISTRICT BHAKKAR.
4. W/I OF BHAKKAR TO KHANSAR TO KAPAHI
ROAD LENGTH=23.70 KMS DISTRICT BHAKKAR
(C.M PACKAGE)
5. W/I OF DARYAKHAN TO DULLAYWALA ROAD
LENGTH=27.87 KMS DISTRICT BHAKKAR
(C.M PACKAGE) AND 6 OTHERS PROJECTS.

EMPLOYER ENGINEERING GENERAL CONSULTANTS


EGC (PVT) LTD
CLIENT C&W Department (Punjab Highway)

POSITION HELD QUANTITY SURVEYOR

DURATION FROM JUN 2011 TO AUG 2013

RESPONSIBILITIES Worked as Quantity Surveyor for the above mentioned


Projects. Responsible for Checking and verification of
Interim Payment Certificate, Price variation, Shop
Drawings, Bar Bending & Work Schedules Quantity of
Earth Work, Sub Base, Base Course (W.B.M), Asphalt
Base Course, Asphalt Wearing Course, Heavy & Light
T.S.T & Structure works. Preparation of monthly invoices,
imprest accounts and progress reports. All office work,
Record maintaining and file keeping.

MAIN PROJECT FEATURES 1. 32 Ft main carriageway 8 Ft Shoulder (Sub Base 10


inch , 12 inch WBM , Asphaltic Base Course 2 inch ,
Asphaltic Wearing Course 1.5 inch, light TST etc.
2. 24 Ft main carriageway , 8 Ft Shoulder (Sub Base 10
inch , 12 inch WBM , heavy TST etc
3. 24 Ft main carriageway , 8 Ft Shoulder (Sub Base 10
inch , 08 inch WBM , heavy TST etc
4. 20 Ft main carriageway , 6 Ft Shoulder (Sub Base 8
inch , 8 inch WBM , heavy TST etc
5. 20 Ft main carriageway , 6 Ft Shoulder (Sub Base 10
inch , 12 inch WBM , heavy TST etc
Bridge 1 No., Box Culverts & Pipe Culverts.

PROJECT REHABILITATION OF JALALPUR PIRWALA ~


TRANDA MUHAMMAD PANHA~ UCH SHARIF ROAD,
N-115. (LENGTH = 41KM)
EMPLOYER ASSOCIATED CONSULTANCY CENTER. (ACC)

CLIENT NATIONAL HIGHWAY AUTHORITY

POSITION HELD QUANTITY SURVEYOR

DURATION FROM AUG 2009 TO JUN 2011


RESPONSIBILITIES Worked as Quantity Surveyor at above mentioned
Project. Responsible for Checking and verification of
Interim Payment Certificate, Shop Drawings, Bar Bending
Schedule and As Built Drawings. Preparation of Daily,
Weekly & Monthly Progress Report Record maintaining
and file keeping.

MAIN PROJECT FEATURES 2 Lane, inner Lane 4.25m and outer Lane 3.65m, Inner
Shoulder 2.4m and Outer Shoulder 3m. (Sub Base
Course 20cm, Aggregate Base Course 30cm, Asphaltic
Base Course 08cm and Asphaltic Wearing Course 05cm.
Bridges 2 Nos. Box Culvert 73 Nos. and Pipe Culvert 105
Nos. etc.
PROJECT BALOCHISTAN ROAD DEVELOPMENT SECTOR
PROJECT (BRDSP) CHAD SHER ALI TO CHAD
GAMBOLA JIWA ROAD LCB – 16, 17 & 18
(LENGTH = 48KM)

EMPLOYER SMEC INTERNATIONAL (PTY) LTD. J.V WITH


ENGINEERING GENERAL CONSULTANTS
EGC (PVT) LTD.
CLIENT COMMUNICATION AND WORKS DEPARTMENT
(BALOCHISTAN).

POSITION HELD QUANTITY SURVEYOR

DURATION FROM DEC 2006 TO AUG 2009


RESPONSIBILITIES Worked as Quantity Surveyor for the above mentioned
Projects. Responsible for Checking and verification of
Interim Payment Certificate, Price variation, Shop
Drawings, Bar Bending & Work Schedules Quantity of
Earth Work, Sub Base, Base Course (W.B.M), Asphalt
Base Course, Asphalt Wearing Course, T.S.T and all
Structure work. Preparation of Progress reports, imprest
accounts and all office work. Record maintaining and file
keeping.

MAIN PROJECT FEATURES 3.65m Main Carriageway Inner Shoulder 3m and Outer
Shoulder 3m. (Sub Base Course 20cm, Aggregate Base
Course 30cm, Asphaltic Base Course 08cm and
Asphaltic Wearing Course 05cm. Stone Masonry Culvert
58 Nos. and Pipe Culvert 73 Nos, Retaining walls,
Causeways 3 Nos. etc.
PROJECT KHAIRPUR DAHA TO JHANGDA SHARKI F.M.R
PROJECT. (BRDP) ROAD NO 11519

EMPLOYER M/S MYCO ENGINEERS.

CLIENT BAHAWALPUR RURAL DEVELOPMENT PROJECT


(BRDP).

POSITION HELD QUANTITY SURVEYOR

DURATION FROM MAR 2005 TO OCT 2006


RESPONSIBILITIES Worked as Quantity Surveyor for the above mentioned
Project. Responsible for preparation of Interim Payment
Certificate, X-Sections, Quantity of Earth Work, Sub
Base, Base Course (W.B.M), Heavy T.S.T & Structure
works. All office work, Record maintaining and file
keeping.

MAIN PROJECT FEATURES 12 Ft main carriageway ,6 Ft Shoulder (Sub Base 8 inch


10 inch WBM , heavy TST etc (Pipe Culverts & Box
Culverts)

PROJECT GOUSPUR TO SHAMBANI F.M.R PROJECT. (BRDP)


ROAD NO 13516

EMPLOYER M/S HAJI LIQAT ALI & BROTHERS.

CLIENT BAHAWALPUR RURAL DEVELOPMENT PROJECT


(BRDP).

POSITION HELD ASSISTANT QUANTITY SURVEYOR

DURATION FROM JUL 2004 TO MAR 2005


RESPONSIBILITIES Worked as Assistant Quantity Surveyor for the above
mentioned Project. Responsible for preparation of Interim
Payment Certificate, X-Sections, Quantity of Earth Work,
Sub Base, Base Course (W.B.M), Heavy T.S.T and
Structure works. All office work, Record maintaining and
file keeping.

MAIN PROJECT FEATURES 12 Ft main carriageway, 6 Ft Shoulder (Sub Base 8 inch


10 inch WBM, heavy TST etc (Pipe Culverts & Box
Culverts)
➢ Preparation & checking of X – Section in auto cad.
➢ Preparation & checking of Interim Payment Certificate.
➢ Preparation & checking of Variation Order.
➢ Preparation & checking of Price variation.
➢ Clearing Grubbing, Natural Ground Compaction, Earth Work, Sub Grade, Sub-Base
and Aggregate Base Course etc.
➢ Asphaltic Base Course and Wearing Course.
➢ Water Bound Macadam (Base Course).
➢ Single, Double & Triple Surface Treatment.
➢ Ancillary works
➢ All Type of Structure works. (Bridges, Box Culverts, Slab Culverts, Pipe Culverts,
Cattle Creep, Underpass, Causeways, Drains, Retaining walls, Brest walls, Riprap
and Stone Pitching.
➢ (Allied Facilities, Service Area, Rest Area, Toll Plaza & Weigh Station ect.)
➢ (Landscaping & Horticultures)
➢ Final Bill & As Built Drawings etc.

Ch. Waqas Ahmed


Date: 17th December, 2021

You might also like