CURRICULUM VITAE

(Applied for Land Surveyor)

Tanveer Ahmed
Abbettabad.pakistan@gmail.com
+971553267791
AIMS & CAREER OBJECTIVE,
To work in an organization this can utilize my potential to its full extent & increase my
knowledge and responsibilities with suitable levels of promotion for maximum satisfaction.

Personal Details
Profession : Land Surveyor
Date of Birth : 15-07-1978
Nationality : Pakistan
Marital Status : single
Languages : English, Urdu, Hindi, Arabic.
Academic Qualification
• ss.c Board Of Intermediates & Secondary Education Abbottabad Pakistan

Technical Qualification
Diploma of Civil Surveyor from Board of Technical Education Abbottabad
pakisatn

Key Experience
Over the post (11) year experience a professional civil and surveyor, road work, pipe line work
and mechanical surveying work and building work.

Professional Experience
Gulf Target
I am working here from 20 Aug 2013 till date as chief surveyor

Project: Road maintenance and infrastructure (ADM)


Responsibilities
 Inspection with consultant for car parking and Road maintenance and pipe line
 Topographic Survey, as built Survey,
 Checking and controlling the horizontal and vertical profile of pipeline. Coordination
 With Engineers regarding site situation etc
 Handle the 10 surveyor for road maintenance work pipe line work
 Fixing new control point and Shifting Bench mark
 New location marking on the road as per Coordinate
 Daily Survey Report

GS Engineering (Abu Dhabi)


I have worked from 20 Nov 2011 to june07 2013 as Senior Surveyor

Project: Ruwais Refinery Expansion Project Takreer Abu Dhabi (EPC-2)

Responsibilities
 I have worked as Civil & Mechanical Survey inspector (S M P) Structure
 Maintaining the quality of work as per drawings and specifications
 Regular site visit and completion of investigation reports on daily basis
 Skill of Topography and countering maps
 Skill of setting out and layout of warehouses, shelters, substation buildings, residential
buildings and mobilization (general residential camp)
 Using Geometric tools i.e. Total station, GPS and Auto level for the external survey
 Management and inspection of the construction of auditorium, Residential Apartment,
Warehouses, Workshop structures, oil and gas pipe lines, sewerage lines and general
buildings line
 Preparation of shop drawings and service drawings
 Civil and structural building controller and construction base coordinator in ABUDHABI
RUWAIS OIL& GASS REFINERY
 Preparation of inspection requests

Nagarjuna contracting company (LLC


I have worked from 25 Oct 2010 to 30 Oct 2011 as Senior Surveyor

Project: 100 kilometers of water pipeline projects (50 KMs. Each in two packages)
awarded by DEWA UAE

Responsibilities
 Setting Out of pipe line and chambers
 Leveling of laying the pipeline
 Daily Survey Report
Techno Engineering Services pvt. Ltd. (Abu Dhabi)
I have worked From 29 May 2009 to 15 Oct 2010 as chief surveyor

Project: ADCOP Abu Dhabi Crude Oil Pipeline (410 Km) from Habshan to Fujairah

Responsibilities
 Worked as sr. surveyor Traversing and fixing new control
 Points and benchmark, setting out of new IPs, Topographic Survey, as built Survey,
Checking and controlling the horizontal and vertical profile of pipeline. Coordination
 With Engineers regarding site situation etc

PACT General Contracting W.L.L. (Abu Dhabi)


I have worked From 02 January 2004 to March 2007 as Surveyor

Project: 908-Irrigation ring main zayed city Mussafah


142/22-pipeline Sewerage line
C200-Pipeline Sewerage . Ruwais
Responsibilities
Worked as senior surveyor on various projects in Abu Dhabi
Construction of Manholes, CC, IC, Air Valve, Washout Chamber, House Connection,
Dewatering, Deflection, GRP, UPVC, A/C Ductile Iron, Pipe laying of Sewerage, Storm Water,
Setting out for Pressure Lines.

Project: ICAD Residential city ABUDHABI-142/22 ABUDHABI

Responsibilities
 Recording the topography data from site & survey crews and forward to drafting section
for further processing.
 Managing the crews, layout of sewerage and water lines according to the invert levels.
 Making the program for next day and managing the surveying progress according the
given program.
 Shifting of survey penetration point with optical plummet instrument in High Rise Tower.
 Responsible to work for building layout, piles survey, column layout, coordination with
consultant.
 Responsible to work for building layout, piles survey, column layout and coordination
with consultants.

Descon.(Abu Dhabi)
I have worked From 14 April 2007 to March 2008 as seneior surveyor

Project: ( A G D II) ASab Gas Development Phase II


Responsibilities
 Worked as Land Surveyor and Mechanical
 Surveyor Coordinating Survey task with the Consultant.
 Schedule Chart for the work and progress.
 Preparing and maintaining accuracy in work.
 Coordination with site engineers Regarding Site Situation.

Abdul Aziz-G. (Pakistan)


I have worked From Sep, 2001 to December 2003 as surveyor

Project: ROAD Jallsi Darrah (28 Km)

Responsibilities
 Setting out, Topographical Survey, Shifting of Benchmarks.
 Survey for Volume Calculation.
 Daily Survey Report.

Instrument
• GPS
• Trimble Sokkia12oo,and Leica 1202
• Total Station
• Sokkia, leica, Geomax,Nikon DTM 352&332
• Level Machines (ALL Types)
• Theodolit