rs
|PURF-01 ‘Rev.00 / 10-15-2017 |
ee WATERIAL PURCHASE REQUEST SLIP ceil coscan
pone cron _— a
eres aspera eet ft oe
ce ae
rt nina caner
= aoe parol = as
sun MESON Ea ees prern a
Te | eons | SUM? ae cmonmen rau’ | Soemne | weer | me’
3 ReT ETT ae
A SS aE ee
; at pe [eaters
- Pesce eT Zhe
5 aaa a
q TS ees
Ta
7 ee pea ees ‘See attached file for your reference (For Sub-Con Storage Room)
5 ace ales
5 anes es
Fe es Aa
A anaes =
5 ac i
Requested by:
Prepared by:
Approved by:
Noted by:
ee
(Program Manager)eras Tease MATERIAL PURCHASE REQUEST SLIP
rns “
ons ace Mana Redevelopment CF2 oxre mona
MWA ruwans | rnciseonoen evene
PunPost/ AREA xiv comnss
unenny | uns (nme rrtane tr | ‘wow | ENR | eer
REQUIRED: Pannen ‘Ivar of erginal contract) | OUT sup wuneper | S*EOULE NUMBER —
Rowing of aiing Storage Room
‘See attached fle for your reference (Fr Sub-Con Storage Room)
Noted by:Project
Location
Date
Subject
RP Manila Redevelopment
Ermita, Manila
October 19, 2022
Subcon Storage MR
MR for Tem Storage Wal
(5/8)Blind Rivet/ Screw
3[ACP Storage/ Larry Pascual
[Ceiling Storage
2JPaint Storage
3[ACP Storage/ Larry Pascual
4[lanwel Storage
MR for Tem Storage Ceiling
‘I]Ceiling Storage
2[Paint Storage
3)ACP Storage/ Larry Pascual
dpianwel Storage
2 (2.44m x 1.22 m)
1/4 (2.
44m x 1.22 m)
[Metal Furrings(3m) |
[Metal Furrings(3m)
(5/8)Blind Rivet/ Screw
(5/8)Blind Rivet/ Screw