You are on page 1of 1

S

SI
Z S

I
JI

JZ
J

PKK
KM 46+628.78

KM 0+161.36
PKK

0+000
0+050
0+100
0+150
70
1.
19
id +
M M0
K

KM 0+000.00
0
20

PT
0+

ST: 46+550,00KM
KM 0+222.03
KKK BS+MRS ŠUICA
5000
0+234 10900
27000

11100
KM 0+233.57
xxx

xxx

305
1000
ESD

RO-MJ

KT
ULAZ

xxx
POSUŠJE - NOVI TRAVNIK
MAGISTRALNI GASOVOD

TRS
DN500/75

KONTEJNER ZA
NADZOR I UPRAVLJANJE
7900

1.5%
12300

6800
3030
6500
1970 3400
BMŠ-1

BMŠ-2
CIJEV
CIJEV
CIJEV

2500
92/110 mm
50/63 mm
50/63 mm

2438
3000

DN200
1.5%

OSA BLOKADNE
SLAVINE
9000

3000

XX.XX
NADSTREŠNICA

1.5%

3093
1893 1200 1000 2820
OGRADA
29000

DN200
REDUKCIJA I MJERENJE
- ŠUICA (ZA LIVNO) -
3000

1000
9125
TIP BS-02

MRS TIP
ŠUICA

1524

2093
7855
ISPU DN200

SPOJ NA MRS DN200

14740
6600

DN100
16700

9184

DN80

1240
IS

6500
12100

2200
POSUŠJE - NOVI TRAVNIK
MAGISTRALNI GASOVOD

ISPU

2773
DN500/75

IZLAZNA SLAVINA DN100

ULAZNA SLAVINA DN200

NADSTREŠNICA
xxx

3000
5500

2545
4505

5000
3400 IS
3400
7943
xxx

3000

3200
4057
1960

IS

22000
1960

27000
xxx

OGRADA
DN100

2000
PROSTOR ZA ODORIZACIJU

Idejni projekat Voditelj projekta CONNECTA ekspert za energiju


Rev. 0 30-Jun-20 inal Preliminary Design Project Manager Adnan Ibišević CONNECTA Key Energy E pert Ole Johansen

Naručilac / Client Glavni izvršilac / Prime Contractor Izvršilac / Contractor

KKK
KM 46+469.31
Naziv projekta / Project Title
CONNECTA-ENE-INFR-BiH-PD+TD-02
IDEJNI PROJEKAT I TENDERSKI DOSIJE GASOVODA JUŽNA INTERKONEKCIJA BIH - HR /
PRELIMINARY DESIGN AND TENDER DOSSIER FOR THE SOUTH GAS INTERCONNECTOR BIH - HR
Jedinica mjere Naziv nacrta / Drawing Title
Izradio Units
Prepared by Kerim Čaušević
m SITUACIJA PISTUPNE SAOBRAĆAJNICE /
Mjerilo ACCESS ROAD LAYOUT
Kontrolirao Scale
Mustafa Musabegović
Checked by 1:1000 BS+MRS ŠUICA
List od Broj brojekta / Job Number Objekat / Area Tip / Type Disciplina / Discipline Redni br. / Serial no. Rev.
Odgovorni projektant
Responsible designer Senad Brković Sheet
4 12
of
6050 000 DW 1421 008 0
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

You might also like