RISK ASSESSMENT
STEP HAZARD - WHO / WHAT
TASK RISK CONSEQUENCE
No. POTENTIAL INCIDENT MAY BE Likelyh
AFFECTED Severity Risk
ood
Heat radiation
Noise
Wind direction
Dewatering system
Personnel in No Go Zone
Noise
Noise
Mechanical
Potential energy
Gravity
Team Composition:
Reviewed:
Name: Signature
RISK ASSESSMENT - DRILLING WHILE PRODUCING & VENTING ON ALPHA PLATFORM
g, all rig personnel, production operator and/or other production/facilities personnel, third party personnel working on the Rig
CONTROL MEASURE/
RECOVERY PREPAREDNESS
ACTION PARTY
Do not exceed limits of volumes allowd to be vented and Stop venting at certain points of drilling sequence,
eg hammering, hole cleaning, etc…
Platform gas detectors and alarms are in place and triggered in case of excessive accumulation of gas on OIM
platform
Platform
Operator
Dedicated platform operator shall always be on the site to monitor flare carry out daily checks and notify in
case of any anomaly e.g. ignition loss
Follow SIMOPS requirements to obtain approval of RSES before beginning work on the platform
Follow T-card system
OIM
Select and use proper PPE
Maintain good communication with Radio room
Platform
Daily checks by platform operator (SCR room, Generator room, etc.)
Operator
APCC Platform Shutdown and depressurized during rig approch and positioning
Sea bed survey recommendations to follow footprint of former rig
All equipment inspected and certified
Conduct risk assessment
follow PTW procedure
Rig positioning to occur only during day light
Rig move procedure to be followed
use of radio and other tools to maintain good communication
stop if weather not favorable
Rig OIM
Remove non-essnetial persons from rig
SIMOPS Procedures and Risk Assessment for Drilling and Workover Vs Production activities
Vessel Captain
BOCP, Well Control Manual and anti-collision
APCC Spill Contingency plan as reference doc covering drilling activities
Spill Kits and pump available on board
Chemicals properly stored
equipment secured on deck
MSDS available on the rig, LMP and on the boats during transportation
DROP survey prior to start drilling operation. Second retention system. Tools secured
Management and Maintenance systems in place
Rig floor exclusion zone (Red Zone) implemented
Date: