Subject: Rig Specific
Procedures
,anriding
operation
-er*ion )
1.1 OBJECTIVE.
A key objective of ADC Procedures is to set up a step by step way of handling the
job. It is also an analysis of associated hazards pertaining to the jobs and measures to
minimize the risks.
his procedure has developed to be applied and discussed before each job listed in
the contents.
1.2 SCOPE.
his procedure applies to !ig AD-32
1.3 RESPONSIBILITY.
It is the responsibility of the ool"pusher and !ig #anager to insure all listed
operations are e$ecuted in a safe and efficient manner. It is the oolpusher
responsibility to conduct a Pre"job %afety #eeting and discuss and review the related
&%A' prior to starting each operation.
ool"pusher is responsible to ensure that each work permit has its dedicated &%A
attached to.

&%A to be reviewed and updated at least annually or
(hen e)uipment is modified
(hen processes are changed
(hen material are changed
(hen changing people*contractors
(hen there is an accident or near miss.
he !ig %up. is accountable for keeping this document up"to +date.
he &%A date and the crew should be same as (ork Permit date and crew.
Author:
Arabian Drilling
Company
REF: 09
Checked By ARS BADER
Rig Specifc
rocedure
age
Appro!ed By: R"S #ASSA$
A% #&%A%
AD ' ()
&**ued: Sept )0+0
Subject: Rig Specific
Procedures
,anriding
operation
-er*ion )
Table of Contents
TASK ANALYSIS
Is Procedure relevant for the operation?
Yes
What can interfere with the operation (Simops)?
Who is going to be in charge, position?
!"# $% #%I&&'%
Who is giving instructions"signals, who replace him?
!"#, (&$$%)!*, #%I&&'%
+ow man, people are re-uired to do the .ob?
(&$$%)!* Position
(&$$%)!* Position
(&$$%)!* Position
#'%%I/0)!* Position
Position
Position
#o ,ou need a P1W" Isolation (loc2out, 1ag out)?
Y'S
What is the PP' re-uired?
+!%# +!1S
S!('1Y S+$'S
(3&& 4$#Y +!%*'SS ( )!*%I#'% )
S!('1Y 5&!SS'S
What tools"e-uipment do ,ou need?
!I% 1355'%
%$P' ($% S'/3%I*5 '63I)P'*1

#o ,ou need a third part,, crane, and for2lift?



Who else needs to 2now what ,ou are doing?

#o ,ou need to barrier off the area?

What are the safest access"escape routes?


Author:
Arabian Drilling
Company
REF: 09
Checked By ARS BADER
Rig Specifc
rocedure
age
Appro!ed By: R"S #ASSA$
A% #&%A%
AD ' ()
&**ued: Sept )0+0
Subject: Rig Specific
Procedures
,anriding
operation
-er*ion )

!dditional /omments7
/+'/0 1+' )!*%I#'% WI*/+ 1$ '*S3%' I1 IS I* 5$$# /$*#I1I$*8
Preparation
%eview 9S! number :; related
+old a pre.ob safet, meeting prior to commencement .ob with all personnel involved
)a2e out P1W8
(all and (alling $b.ect8 'nsure *o one stand underneath while wor2 is being done8
Tools
Fall arrestors.
Ropes to secure tools
Banks man
Manriding winch.
Riding harness.
Procedure
Before raising a PTW for lifting personnel t!in" if t!ere is anot!er #a$ to do t!e job
and%or if it is reall$ necessar$ to send so&ebod$ at !eig!t'
)an riding winch shall onl, be used if there is no other safer alternative to carr, out a tas2'
Air #inc! operator
<8 1he person operating (the operator) the lifting machiner, shall be approved b,
the %ig Superintendent as an !ir Winch $perator8
=8 ! list of !ir Winch operator shall be available on the rig floor8
>8 1he operator shall have completed the training level <?= on Wor2ing at heights
Author:
Arabian Drilling
Company
REF: 09
Checked By ARS BADER
Rig Specifc
rocedure
age
Appro!ed By: R"S #ASSA$
A% #&%A%
AD ' ()
&**ued: Sept )0+0
Subject: Rig Specific
Procedures
,anriding
operation
-er*ion )
@8 $perator shall never leave the air winch while a man is hoisted8
A8 $perator is to ensure that cable is spooling correctl, on the drum8
6.$perator must confirm that the winch bra2ing s,stem is satisfactor,, and the cable in good
condition before use8
Person being lifted
<8 Person being lifted shall have completed the training level <?= on Wor2ing at
heights8
=8 Person being lifted shall wear a full bod, harness8 %iding harness must be
chec2ed and shall be correctl, fastened, the lin2 between line and harness shall
have a failsafe design with a positive loc2ing mechanism8
Air #inc! safet$ !arness e(uip&ent for &an riding
<8 $nl, certified B)an ridingC winch shall be used when lifting personnel
=8 )an riding winch shall be clearl, mar2ed and onl, used for lifting of personnel8
>8 )an riding winch shall be e-uipped with a Bone hitC stop button8
@8 Winch shall be operated as per manufacturers instructions, fitted with drum
guards and control levers clearl, mar2ed up and down8
A8 Winch shall be inherentl, safe and e-uipped with a loadlimiting device to <A:0g
D8 1he man riding air winch line shall onl, have in it ergonomic shape accessories
that cannot catch on edges of structures and beams8
*ote7
" Ingersoll %and &S <A: %&P pneumatic man riding air winch suits with S#S
re-uirements ( '-uipment standard S#S " +6'S1;@<:=)
" Sala *D::8= harness and Saddle )aster harness (from 'l2 %iver) suits with S#S
re-uirements
Author:
Arabian Drilling
Company
REF: 09
Checked By ARS BADER
Rig Specifc
rocedure
age
Appro!ed By: R"S #ASSA$
A% #&%A%
AD ' ()
&**ued: Sept )0+0
Subject: Rig Specific
Procedures
,anriding
operation
-er*ion )
)peration
<8 ! permit to wor2 shall be obtain prior to start the operation
=8 1he person being lifted should alwa,s remain in the sight of the winch operator
>8 If not possible8 +e shall be directed b, an approved ban2sman who shall 2eep in
sight of person being lifted and of winch operator8
@8 (or all manriding winch operation carried out between the rotar, table and mon2e,
board, the #riller is responsible and shall supervise the operation8
*' +or all &an riding #inc! operation carried out belo# t!e rotar$ table or abo,e
t!e &on"e$ board t!e RS or ARS s!all super,ise t!e operation'
D8 When the wor2 is to be carried out under the rotar, table such as on the 4$P or 4ell
nipple and if the rig floor man riding winch is needed, it shall onl, be used through
the rotar, table with the master bushings removed and a safet, rail installed around
the open hole8
E8 %adios shall not be used as a mean of communication between winch operator and
man being lifted8
F8 *o one shall be hoisted into the derric2"mast while drill string is rotating and"or the
bloc2s are in motion8
;8 1ools carried up in the mast must be properl, secured with ropes to the harness8