You are on page 1of 17

PRIVATESECTORINVOLVEMENTON INCREASINGACCESSWATERSUPPLYIN BANYUURIPVILLAGE,UJUNGPANGKAH

AngelaIkaYane M
HESS(IndonesiaPangkah)Ltd. for 2nd InternationalWorkshopon WaterSupply ManagementandSocialCapital ITS,Surabaya 1516March,2010

Ngem boh

Bany uu

on Kul ah gk Pan

HESS Community Developmentlocations


Pangkah Wetan

rip

2 Sub districts: Ujung Pangkah & Manyar 4 villages in Ujung Pangkah 3 villages in Manyar Community Development activities based on participatory planning

Banyuurip vilage overview:


inUjungpangkah coastal areanear estuary ofBengawan Soloriver Lack offresh watersourcePriceoffresh waterRp.1,500,/ 20liters oraround Rp 150,000300,000/month/ household forfresh waterexpenses. Some poor communities fresh wateronly fordrinking and cooking. Based onparticipatory planningresult,community in Bangsalsari subvillage(Banyuurip village)need tobe facilitated onwatersupply access

Goal

Improvementhealthconditionbyfacilitating andincreasingwatersupplyaccesstothe community

Objectives:
Increasingwatersupplyaccesstothe community Capacitybuildingtothecommunityfor planning,implementing,operatingand maintainingtheirwatersupplysystem Raisinghealthawareness InvolvementofprivatesectorsbyCorporate SocialResponsibilitiesactivitiesonimproving watersupplymanagement

SustainabilityStrategy
Communityparticipationbyperspective gender torepresentwomeninitiatives Watermanagementbyinvolvingexisting womengroups(PKK) asdecisionmakersand implementers Waterresourcemanagement forsustainble thewatersource

Methodology
Participatoryplanning onMarch2007 VisitStudytoexistingCommunitybased watersupply inLessanpuro,kabupaten Malang TrainingforWatercommittee todevelop CommunityActionPlan(CAP), implementation,operational&maintenance system

Outputs:
CommunityActionPlan(CAP)result:
Watersourceisanexistingboredwellwith17m depth,debit1.8lt/sec Pumpingtwiceperday0.9lt/secto2water reservoirs5.2m3 ofeach. consumersare40householdsconnection(now43 householdconnections) Basicfee=10,000, (05m3)

The CAP process:


Field Identification, Observation Field Survey : -Technical Suvey -Social Survey Data Analysis

1 Focus Group Discussion (FGD)


st

2nd FGD to Verification

Coordination with related stakeholders (village leader, government agency: BLH, DinKes, Dinas Perijinan, Bappeda)

CAP

Watercommitteeorganization:
Wantiono Adviser (sub village leader)

Kusnaeni Coordinator

Munawaroh Secretary

Ismatia Finance/ Treasury

1. Sutarji 2. Fanani Pump Operator & fee collector

DetailEngineeringDesign(DED) byworking withplanningconsultant(PTCandikencana Sabdawisesa)facilitatedBangsalsari water committee


2 water reservoir 5 m height

pump Household connection

17 m depth

Shallow bored well

Monitoring&EvaluationSystem
Operatormonitorsthetechnicalsystemdaily andreportingtoCoordinatorifanyproblem. Watercommitteebymonthlyinvitesvillage leader,andHESSforparticipatoryevaluation forimprovingwatersupplymanagement system.

IMPACT
Changinghealthbehavior (bathingtwiceper day,cleanthefoodbeforecooking/serving. Takingcarebabieswithcleanwater) Buildingtheircapacity bydoingwater management Increasingselfconfidenceforwomen tobea decisionmakerandparticipatefor developmentactively

Problems
WaterConflict oncrossboundarywater sourceandbeneficiaries Villagegovernmentsupport areverylimited

Recommendations
Villageleadersregulation suchas:Peraturan Desa (PerDes)tomanagewatersource&utilization. Legalizationthewaterorganization forgetting accessgovernmentsprogram,oraccesstothebank forextendingwaterdistribution. Governmentsupport forwatermanagement regulationstospeedupthereplicationprocesson increasingwatersupplyaccess

Conclusion
Thisprogramproofingthatcommunityableto workandcoordinatewithprivatesectoron watermanagementforincreasingtheirhealth quality

Thankyou

You might also like