Professional Documents
Culture Documents
Tendernotice 2
Tendernotice 2
AIR VALUE
SLUICE VALUE
scv
SCOUR VALUE
GROUND LEVEL
PROPOSED PIPE
DETAILS
LENGTH 460 M
7240.000 491.808
7260.000 491.538
7280.000 491.269
7300.000 490.999
7320.000 491.178
7340.000 490.818
7360.000 490.238
7380.000 489.664
7400.000 489.382
7420.000 489.108
7440.000 488.833
7460.000 488.452
7480.000 488.050
7500.000 487.704
7520.000 487.925
AV14
7540.000 488.152
7560.000 488.380
7580.000 488.608
7600.000 488.640
7620.000 487.941
7640.000 487.359
7660.000 487.834
SCV3
7680.000 488.315
7700.000 488.796
7720.000 488.835
7740.000 488.862
7760.000 488.904
7780.000 488.955
7800.000 489.007
7820.000 489.135
7840.000 489.262
7860.000 489.427
7880.000 489.657
7900.000 489.888
7920.000 490.086
7940.000 490.296
7960.000 490.633
7980.000 490.970
8000.000 491.289
8020.000 491.592
SV5 AV15
8040.000 491.921
8060.000 492.468
8080.000 493.118
8100.000 493.337
8120.000 493.811
8140.000 494.321
8160.000 494.748
8180.000 495.106
8200.000 495.495
8220.000 496.274
8240.000 497.054
8260.000 496.750
8280.000 496.345
GL-497.05 m
8300.000 496.353
8320.000 496.648
8340.000 497.140
HGL- 534.10
8360.000 497.657
8380.000 498.171
8400.000 498.684
8420.000 499.198
8440.000 499.711
8460.000 500.025
8480.000 500.285
8500.000 500.546
8520.000 500.774
AV16
D=300 MM DI K-7
8540.000 500.978
8560.000 501.150
Q-16.412 l/s
8580.000 501.263
hf- 0.197m/km
8600.000 501.375
8620.000 501.483
8640.000 501.481
8660.000 501.479
8680.000 501.477
8700.000 501.475
8720.000 501.494
8740.000 501.334
8760.000 501.205
GL-501.50 m
8780.000 501.109
8800.000 501.106
8820.000 501.103
HGL-534.01
8840.000 501.097
8860.000 501.088
8880.000 501.120
8900.000 501.216
8920.000 501.181
8940.000 501.159
8960.000 501.162
8980.000 501.174
9000.000 501.187
9020.000 501.199
AV17
9040.000 501.211
9060.000 501.315
9080.000 501.312
9100.000 501.241
9120.000 501.171
9140.000 501.424
9160.000 501.782
9180.000 502.092
9200.000 502.404
9220.000 502.786
9240.000 503.168
9260.000 503.549
9280.000 503.921
9300.000 504.276
9320.000 504.631
9340.000 504.979
9360.000 505.305
9380.000 505.630
9400.000 505.950
9420.000 506.259
9440.000 506.568
9460.000 506.911
9480.000 507.295
9500.000 507.717
9520.000 508.144
AV18
9540.000 508.320
9560.000 508.497
9580.000 508.812
9600.000 509.127
00
9620.000 509.433
.00
0
9640.000 509.712
9660.000 509.991
GL
9680.000 510.114
51
1
9700.000 510.210
.53
9720.000 510.186
1
Q-14.838 l/s
D=300 MM DI K-7
9740.000 510.149
MBR - 2
hf- 0.164m/km
9760.000 510.112
9780.000 510.211
FSL-541.467
9800.000 510.379
D=L=1
9820.000 510.670
0
30 ,30
9840.000 511.094
m
LSL 536.484
9860.000 511.519
m
0. 7 m
9880.000 511.740
DI
9900.000 511.861
9920.000 511.982
K-
7
9940.000 512.103
9960.000 512.274
TO
D=
9980.000 512.417
SA
90
10000.000 512.559
LW
.0
10020.000 512.686
AD
mm
10040.000 512.759
GA
ON
10060.000 512.832
HD
AV19 SV6
ES
10080.000 512.906
R
PE
13
10100.000 512.979 00
.0
10120.000 513.130
00
10140.000 513.305 G
L-
10160.000 513.471 50
3.
10180.000 513.429
04
m
10200.000 513.386
10220.000 513.156
L=
10240.000 512.783
10260.000 512.410
10280.000 512.090
GL-503.04 m
10300.000 511.916
D= 1,091
10320.000 511.728
.0 m
3 00 m
10340.000 511.484
m
10360.000 510.977
DI
10380.000 510.475
10400.000 510.258
10420.000 510.042
K-7
10440.000 509.825
10460.000 509.501
10480.000 508.671
10500.000 507.953
10520.000 507.911
AV20
10540.000 507.885
10560.000 507.698 39
8.3
10580.000 507.540 49
GL
10600.000 507.409
D=9
0 0.0
10620.000 507.337
.00 mm
00 TO
24 HDP
10640.000 507.255
SAL E
WAD
10660.000 506.988
GA O
NE
GL-507.25 m
SR
10680.000 506.606 2 PRO
.
HGL-533.69
10700.000 506.223
10720.000 505.841
10740.000 505.189
GL 498.339
10760.000 504.447
10780.000 503.791
10800.000 503.301
10820.000 502.810
10840.000 502.446
10860.000 502.209
D= 300 MM DI K-7
Q-14.838 l/s
10880.000 501.972
hf- 0.164m/km
10900.000 501.727
10920.000 501.272
10940.000 500.817
10960.000 500.556
GL-500.25 m
10980.000 500.358
11000.000 500.030
11020.000 499.464
AV21
11040.000 499.125
11060.000 498.935
11080.000 498.749
HGL-533.64
11100.000 498.652
11120.000 498.556
11140.000 498.459
11160.000 498.126
11180.000 497.787
11200.000 497.449
11220.000 497.111
11240.000 496.773
11260.000 496.328
11280.000 495.768
11300.000 495.208
11320.000 494.719
11340.000 494.889
SCV4
D= 300 MM DI K-7
11360.000 495.124
11380.000 495.323
D=300
Q-12.951 l/s
11400.000 495.207
hf- 0.127m/km
11420.000 495.092
11440.000 495.020
8m
11460.000 495.032
11480.000 495.045
11500.000 495.057
11520.000 495.069
AV22
L=3,04.0 mm DI K
11540.000 495.081
-7
11560.000 494.819
11580.000 494.539
11600.000 494.345
11620.000 494.357
11640.000 494.819
GL-494.35 m
11660.000 494.539
11680.000 494.357
11700.000 494.576
11720.000 495.399
HGL-533.56
11740.000 495.839
11760.000 496.277
11780.000 496.721
11800.000 497.353
11820.000 497.985
11840.000 498.610
11860.000 499.188
11880.000 499.288
11900.000 499.387
11920.000 499.376
11940.000 499.351
11960.000 499.129
11980.000 499.140
12000.000 499.476
12020.000 499.811
12040.000 500.134
12060.000 500.369
SV7 AV23
12080.000 500.605
12100.000 500.840
12120.000 501.094
12140.000 501.367
12160.000 501.538
12180.000 501.590
12200.000 501.642
12220.000 501.786
12240.000 501.948
12260.000 502.110
12280.000 502.406
12300.000 502.812
Q-8.299 l/s
12320.000 503.217
hf- 0.136m/km
12340.000 503.559
D= 250 MM DI K-7
12360.000 503.893
GL-504.38 m
12380.000 504.227
GL-504.38 m
12400.000 504.524
12420.000 504.561
12440.000 504.598
TO
12460.000 504.635
MA
5440.000
D=
12480.000 504.672
LEG
90.
12500.000 504.781
0
AO
12520.000 504.893
N
AV24
12540.000 505.006
mm
NE
12560.000 505.079
ES
HD
12580.000 505.135
PE
12600.000 505.167
12620.000 505.133
12640.000 505.098
12660.000 505.063
12680.000 505.057
12700.000 505.078
12720.000 505.099
12740.000 505.120
12760.000 505.253
12780.000 505.391
12800.000 505.478
12820.000 505.502
12840.000 505.526
12860.000 505.550
12880.000 505.588
12900.000 505.673
12920.000 505.758
12940.000 504.843
12960.000 503.909
12980.000 502.863
13000.000 500.816
13020.000 500.668
13040.000 501.501
=
13060.000 502.583
D=
AV25 SCV5
13080.000 503.691
3
GL-500.87 m
13100.000 504.954
HGL-533.37
L 00.
99
13120.000 505.221
13140.000 506.423
13160.000 506.550
13180.000 506.677
2,7 0 mm
13200.000 506.798
13220.000 506.918
m DI K
13240.000 507.140
13260.000 507.518
-7
13280.000 507.971
13300.000 508.313
13320.000 508.655
13340.000 508.934
13360.000 509.157
13380.000 509.168
13400.000 509.034
13420.000 508.942
13440.000 509.239
13460.000 509.537
13480.000 509.831
13500.000 510.065
13520.000 510.021
AV26
13540.000 509.977
13560.000 510.102
13580.000 510.226
13600.000 510.373
13620.000 510.500
13640.000 510.649
13660.000 510.798
13680.000 510.807
13700.000 510.808
13720.000 510.980
13740.000 511.250
13760.000 511.520
13780.000 511.955
13800.000 512.580
13820.000 513.206
13840.000 514.078
13860.000 515.141
13880.000 516.204
13900.000 517.268
13920.000 517.752
13940.000 517.319
13960.000 516.887
SCV6
13980.000 517.823
82
14000.000 518.801
40
GL-497.05 m
.00
14020.000 519.569
AV27
0
TO THAKUR NIM
14040.000 520.022
14060.000 520.468
SV8
14080.000 521.055
GL
14100.000 521.767
-49
D=90.0 mm HDPE
D=
7.0
14120.000 522.308
5
30
m
14140.000 522.434
GAON ESR-2 874
14160.000 522.559
L= 0.0 m
0.0
47
00
14180.000 522.685
0mmD
I
14200.000 522.651
TO
D=
14220.000 522.427
K-7
WA
9
GL
14240.000 522.203
DG
-5
0.0
A
01
14260.000 521.961
m
ON
.46
14280.000 521.386
TO THAKUR NIM
ES
4m
14300.000 520.811
R-
HD
1
P
14320.000 520.562
E
14340.000 520.342
D=90.0 mm HDPE
15
14360.000 520.122
D= 250 MM DI K-9
GAON ESR-1
64
GL-501.464 m
14380.000 519.920
0.0
GL- 513.062 m
14400.000 519.778
00
14420.000 519.635
GL
14440.000 519.567
-5
14460.000 519.641
13
14480.000 519.714
D
.06
14500.000 519.850
2m
L= =3
14520.000 520.109
AV28
1, 00
14540.000 520.369
93 .0
14560.000 520.573
0 m
14580.000 520.680
m m
14600.000 520.787
DI
14620.000 520.929
14640.000 521.173
K-
7
14660.000 521.417
14680.000 521.661
TO
W
14700.000 521.886
L=682 m
AD
D
14720.000 522.340
=9
AO
14740.000 522.808
0.
N
0
ES
14760.000 523.246
m
R
2
m
14780.000 523.308
Q-5.162 l/s
H
D=250.0 mm DI K-7
PR
D
14800.000 523.241
O
.
PE
14820.000 523.015
hf- 0.056m/km
D=
14840.000 522.790
25
14860.000 522.561
0.
14880.000 521.989
14900.000 521.850
=
0m
14920.000 521.710
L m
14940.000 521.469
14960.000 521.171
34 DI
14980.000 520.874 10
64
15000.000 520.631
L=2,620 m
0.
7 mK-7
00
15020.000 520.408 0
AV29
15040.000 520.185 G
L-
15060.000 519.962
50
7.
15080.000 519.739
25
m
15100.000 518.968
D=250.0 mm DI K-7
15120.000 518.192
L=349 m
15140.000 518.082
15160.000 517.974
D=300.0 mm DI K-7
15180.000 517.873
GL- 524.00 m
GL-507.25 m
15200.000 517.773
10
98
15220.000 517.672
0
L=
.0
13
00
15240.000 517.398
02
0.0
15260.000 517.015 G
00
L-
15280.000 516.632
50
50.0
0.
15300.000 516.386
25
m
GL
15320.000 516.317
D=21,640 m
-
mm
15340.000 516.248
50
0.8
15360.000 516.179
D
7m
15380.000 516.111
TO
D=
9
15400.000 515.948
HA
0.
S
GL-500.25 m
15420.000 515.741
I K-7
NA
0m
15440.000 515.506
PU
m
R
15460.000 515.223
GL- 500.87 m
EX
HD
15480.000 515.016
P
ES
E
15500.000 514.758
R -1
15520.000 514.500
AV30
L=635 m
15540.000 514.233
11
15560.000 513.912 62
0.
15580.000 513.619 00
0
15600.000 513.545
15620.000 513.356
G
L=193 m
L-
15640.000 513.062
49
4.
15660.000 513.187
35
m
D=300.0 mm DI K-7
15680.000 513.117
GL-513.10 m
GL-527.68 m
15700.000 512.862
D=200.0 mm DI K-7
18440.00
15720.000 512.683
0
L=1,397 m
GL-527
.68 m
L=69 m
15740.000 512.489
D=200.0 mm DI K-7
HGL-533.22
GL-494.35 m
15760.000 512.454
SCV7
15780.000 512.443
18
15800.000 512.583
44
0
15820.000 512.085
.0
00
D=250.0 mm DI K-7
15840.000 513.163
G
15860.000 513.329
L-
52
15880.000 513.450
7.
15900.000 513.436
68
m
15920.000 513.489
15940.000 513.428
15960.000 513.811
15980.000 514.309
16000.000 514.761
GL-530.06 m
THATE SUMP
16020.000 515.138
AV31
GL-527.95 m
16040.000 515.476
D=250 MM DI K-7
Q-3.426 l/s
SV9
16060.000 515.664
hf- 0.026m/km
16080.000 515.853
16100.000 515.941
16120.000 515.983
16140.000 516.024
16160.000 516.058
16180.000 516.090
16200.000 516.313
16220.000 516.706
16240.000 517.100
16260.000 517.657
16280.000 518.237
16300.000 518.646
L SECTION FROM MBR 2 TO THATE SUMP
16320.000 518.944
16340.000 519.007
16360.000 519.679
GL-519.00 m
16380.000 520.036
16400.000 520.358
16420.000 520.705
HGL-533.20
16440.000 521.177
16460.000 521.743
16480.000 522.347
16500.000 522.770
16520.000 522.874
AV32
16540.000 522.747
Q-2.87 l/s
16560.000 522.648
D= 250 MM DI K-7
16580.000 522.761
hf- 0.019m/km
16600.000 522.873
16620.000 523.332
16640.000 523.586
16660.000 523.640
16680.000 524.005
16700.000 523.065
16720.000 522.474
GL-524.00 m
16740.000 522.049
16760.000 521.689
16780.000 521.329
HGL-533.19
16800.000 520.940
16820.000 520.546
16840.000 520.218
16860.000 519.898
16880.000 519.598
16900.000 519.318
16920.000 519.076
16940.000 518.791
16960.000 518.506
16980.000 518.093
17000.000 517.788
17020.000 517.857
AV33
17040.000 517.809
17060.000 517.732
17080.000 517.650
17100.000 517.603
17120.000 517.512
17140.000 517.363
17160.000 517.027
17180.000 517.067
17200.000 517.357
17220.000 517.550
17240.000 516.867
DI PIPE
17260.000 516.567
LENGTH
SCV8
17280.000 517.302
AIR VALVE
AIR VALUE
HDPE PIPE
17300.000 517.466
17320.000 517.473
DETAILS
SLUICE VALUE
LEGEND
SCOUR VALUE
17340.000 517.523
GROUND LEVEL
PROPOSED PIPE
17360.000 517.430
17380.000 517.267
17400.000 517.302
17420.000 517.515
Q-2.87 l/s
17440.000 517.491
DIA DI K7
18600 M
90 MM DIA
17460.000 517.500
hf- 0.019m/km
17480.000 517.531
TOTAL-9 NOS.
17500.000 517.562
TOTAL-10 NOS.
17520.000 517.644
AV34
17540.000 517.879
100MM DIA.-5NOS
250MM DIA.-4NOS
300, 250 & 200 MM
17560.000 518.114
17580.000 518.379
17600.000 518.674
D=250 MM DI K-9
17620.000 518.797
17640.000 518.863
17660.000 518.930
17680.000 519.070
17700.000 519.407
17720.000 519.744
SCALE:
17740.000 520.111
CLIENT:
17760.000 520.489
17780.000 520.898
17800.000 521.363
17820.000 521.696
17840.000 521.749
17860.000 521.816
17880.000 521.981
17900.000 522.145
17920.000 522.297
17940.000 522.545
CHECKED BY :- ENGINEER
SECTIONAL
17960.000 522.978
17980.000 523.411
18000.000 523.725
18020.000 523.966
AV35
18040.000 524.254
18060.000 524.629
18080.000 524.984
TAL:- SHEVGAON
18100.000 525.248
SV10
18120.000 525.226
ENGINEER
18140.000 525.284
SUB DIVISION
18160.000 525.342
18180.000 525.414
18200.000 525.508
18220.000 525.603
18240.000 525.711
18260.000 525.860
18280.000 526.008
DRAWN BY: SRUSHTI.A DATE:03-04-2022
18300.000 526.007
ENGINEER
EXECUTIVE
18320.000 525.976
DRAWING TITLE : L SECTION FOR THATE SUMP
18340.000 525.777
SCV9
18360.000 526.116
MAHARASHTRA JEEVAN PRADHIKARAN
18800.000 526.454
18400.000 526.793
DIST:-AHMEDNAGAR
18420.000 527.091
18440.000 527.681
REGIONAL RURAL WATER SUPPLY SCHEME
18460.000 527.546
DWG NO:
AV36
18480.000 527.587
250 MM
HGL 533.15
ENGINEER
18500.000 527.958
AMRAPUR-MALI BABHULGAON & OTHER 49 VILLAGES
18520.000 528.391
18540.000 529.154
SUPERINTENDING
GL-527.95 m
18560.000 529.517
200 MM
18580.000 530.062
Q-2.87 l/s
GL-530.06 m
hf- 0.056m/km
18600.000530.833
THATE SUMP
HGL 533.15
(m)
(m)
(m)
Chainage
PIPE DIA
Datum: 486.0
MBR - 2
FSL-541.467
20.000 511.295
60.000 510.495
SV1
80.000 510.022
100.000 509.548
120.000 509.455
LSL 536.484
140.000 509.458
160.000 509.085
180.000 508.640
200.000 508.501
220.000 508.445
240.000 508.306
260.000 507.962
280.000 507.802
300.000 507.765
320.000 507.624
340.000 507.389
360.000 506.703
380.000 506.018
400.000 505.717
420.000 505.466
440.000 504.959
460.000 504.403
480.000 504.111
500.000 503.854
AV1
520.000 503.603
540.000 503.353
560.000 503.031
580.000 502.686
600.000 502.387
620.000 502.259
640.000 502.084
660.000 501.847
680.000 501.601
700.000 501.310
D= 300 MM DI K -7
Q-22.813 l/s
720.000 501.049
hf- 0.363m/km
740.000 500.884
760.000 500.718
780.000 500.428
800.000 500.213
820.000 499.999
840.000 499.912
860.000 500.075
SCV1
880.000 500.238
900.000 500.401
920.000 500.571
940.000 500.759
960.000 500.948
980.000 501.109
1000.000 501.225
1020.000 501.456
AV2
1040.000 501.687
1060.000 501.918
1080.000 502.421
1100.000 503.046
1120.000 503.347
1140.000 503.550
1160.000 503.747
1180.000 503.930
1200.000 504.113
1220.000 503.961
1240.000 503.810
1260.000 503.707
1280.000 503.275
1300.000 503.041
1320.000 502.621
1340.000 502.137
GL-503.04 m
1360.000 501.774
1380.000 501.787
1400.000 501.574
HGL-536.01
1420.000 501.226
1440.000 500.878
00
1460.000 500.653
.00
0
1480.000 500.556
GL
1500.000 500.459
51
1
1520.000 500.363
AV3
.53
1
1540.000 500.154
MBR - 2
1560.000 499.951
FSL-541.467
1580.000 499.749
D=L=1
1600.000 499.543
30 ,30
m
LSL 536.484
1620.000 498.927
m
0. 7 m
1640.000 498.407
DI
1660.000 498.236
K-
7
1680.000 497.890
TO
D=
1700.000 497.605
SA
90
LW
.0
1720.000 497.458
AD
mm
1740.000 497.312
GA
ON
HD
1760.000 497.248
ES
R
PE
13
1780.000 497.297 00
.0
00
1800.000 497.347
G
L-
1820.000 497.397 50
3.
04
1840.000 497.482 m
Q-21.215 l/s
1860.000 497.572
L=
hf- 0.317m/km
1880.000 497.660
1900.000 497.736
D = 300 MM DI K -7
GL-503.04 m
D= 1,091
1920.000 497.820
.0 m
3 00 m
1940.000 498.092
m
1960.000 498.365
DI
1980.000 498.484
K-7
2000.000 498.366
2020.000 498.248
2040.000 498.129
2060.000 498.078
AV4 SV2
2080.000 498.291
39
8.3
2100.000 498.504
49
GL D=9
0 0.0
2120.000 498.717 .00 mm
00 TO
24 SAL HDP
2140.000 498.930 WAD E
GA O
NE
SR
2160.000 499.138 2 PRO
.
2180.000 498.795
2200.000 498.470
GL 498.339
2220.000 498.185
2240.000 498.250
2260.000 498.552
2280.000 498.823
2300.000 498.866
2320.000 498.456
2340.000 498.223
2360.000 498.311
2380.000 498.426
2400.000 498.339
2420.000 497.702
2440.000 497.584
GL-498.35 m
2460.000 497.517
2480.000 497.625
2500.000 497.734
HGL- 535.66
2520.000 497.834
AV5
2540.000 497.930
2560.000 498.025
2580.000 498.119
2600.000 498.213
2620.000 498.307
D=300
2640.000 498.401
2660.000 498.498
8m
2680.000 498.612
2700.000 499.659
2720.000 500.851
L=3,04.0 mm DI K
-7
2740.000 500.890
2760.000 500.770
2780.000 500.707
2800.000 500.769
2820.000 500.830
2840.000 500.888
2860.000 500.985
2880.000 501.097
2900.000 501.209
2920.000 501.321
2940.000 501.071
2960.000 501.134
2980.000 500.985
3000.000 500.879
AV6
3020.000 501.183
3040.000 501.486
3060.000 501.548
3080.000 501.510
3100.000 501.422
3120.000 501.305
3140.000 501.188
3160.000 501.072
3180.000 500.955
3200.000 501.319
3220.000 501.514
3240.000 500.767
3260.000 501.264
GL-504.38 m
3280.000 501.921
GL-504.38 m
3300.000 502.575
TO
3320.000 502.821
MA
5440.000
3340.000 503.079
D=
LEG
90.
3360.000 503.336
0
AO
N
3380.000 503.594
mm
NE
ES
3400.000 503.827
HD
3420.000 504.038
PE
3440.000 504.209
3460.000 504.355
3480.000 504.501
3500.000 504.646
AV7
3520.000 504.815
3540.000 505.120
3560.000 505.423
3580.000 505.669
3600.000 505.906
3620.000 506.142
3640.000 506.379
3660.000 506.620
3680.000 506.835
3700.000 507.024
3720.000 507.213
=
D=
3740.000 507.463
3
3760.000 507.798
L 00.
99
3780.000 508.132
Q-20.417 l/s
3800.000 508.466
hf- 0.295m/km
2,7 0 mm
3820.000 508.800
3840.000 509.134
m DI K
-7
3860.000 509.270
3880.000 509.378
3900.000 509.486
3920.000 509.588
3940.000 509.674
3960.000 509.760
D =300 MM DI K 7
SV3
3980.000 509.722
4000.000 509.655
4020.000 509.589
4040.000 509.574
4060.000 509.861
4080.000 510.105
4100.000 510.303
4120.000 510.502
AV8
4140.000 510.645
4160.000 510.754
4180.000 510.863
4200.000 511.033
4220.000 511.722
4240.000 512.411
4260.000 513.088
4280.000 513.231
4300.000 513.369
4320.000 513.605
82
4340.000 513.852
40
GL-497.05 m
.00
4360.000 514.109
0
TO THAKUR NIM
4380.000 514.498
GL
4400.000 514.886
-49
D=90.0 mm HDPE
4420.000 515.286
D=
7.0
5
30
m
4440.000 515.688
GAON ESR-2 874
L= 0.0 m
0.0
47
4460.000 516.087
00
0mmD
I
TO
4480.000 516.486
D=
K-7
WA
9
GL
4500.000 516.699
DG
-5
0.0
A
01
AV9
4520.000 516.708
ON
.46
m
TO THAKUR NIM
ES
4m
4540.000 516.730
R-
HD
1
P
4560.000 516.977
E
D=90.0 mm HDPE
15
4580.000 517.194
GAON ESR-1
64
GL-501.464 m
0.0
GL- 513.062 m
4600.000 517.141
00
4620.000 517.088
GL
4640.000 516.952
-5
13
4660.000 516.763
D
.06
2m
4680.000 516.576
L= =3
1, 00
4700.000 516.464
93 .0
0 m
4720.000 516.351
m m
4740.000 516.239
DI
4760.000 515.853
K-
7
4780.000 515.382
TO
4800.000 514.940
W
L=682 m
AD
D
4820.000 514.487
=9
AO
0.
N
0
4840.000 514.034
ES
m
R
2
m
4860.000 513.520
H
D=250.0 mm DI K-7
PR
D
O
.
4880.000 512.754
PE
D=
4900.000 512.381
25
0.
4920.000 512.234
=
4940.000 511.568
0m
L m
4960.000 510.729
34 DI
4980.000 510.094
10
64
5000.000 509.595
L=2,620 m
0.
7 mK-7
00
0
5020.000 508.693
G
AV10
L-
5040.000 508.091 50
7.
25
5060.000 507.706 m
D=250.0 mm DI K-7
5080.000 506.241
L=349 m
5100.000 506.108
D=300.0 mm DI K-7
5120.000 505.976
GL- 524.00 m
GL-507.25 m
10
5140.000 505.921
98
0
L=
.0
13
00
02
5160.000 505.795
0.0
G
5180.000 505.771
00
L-
50
50.0
0.
25
5200.000 505.747
m
GL
D=21,640 m
-
5220.000 505.861
mm
50
0.8
5240.000 505.996
D
7m
TO
D=
9
5260.000 506.118
HA
0.
S
GL-500.25 m
I K-7
5280.000 506.064
NA
0m
PU
m
R
5300.000 506.011
GL- 500.87 m
EX
HD
5320.000 505.957
P
ES
E
R -1
5340.000 505.936
L=635 m
5360.000 505.809 11
62
5380.000 505.635
0.
00
0
5400.000 505.275
G
L=193 m
L-
5420.000 504.912
49
4.
35
5440.000 504.382
m
D=300.0 mm DI K-7
GL-527.68 m
5460.000 504.225
D=200.0 mm DI K-7
18440.00
0
L=1,397 m
GL-527
5480.000 504.125 .68 m
L=69 m
D=200.0 mm DI K-7
GL-504.38 m
GL-494.35 m
5500.000 503.859
5520.000 503.536
AV11
18
44
0
5540.000 503.205
.0
00
HGL-534.76
D=250.0 mm DI K-7
5560.000 502.872
G
L-
52
5580.000 502.539
7.
68
5600.000 502.199
m
5620.000 501.537
5640.000 500.788
5660.000 500.038
GL-530.06 m
THATE SUMP
GL-527.95 m
5680.000 499.380
5700.000 499.182
5720.000 498.985
5740.000 498.810
5760.000 498.676
5780.000 498.542
5800.000 498.407
5820.000 498.253
5840.000 498.083
5860.000 497.914
5880.000 498.007
5900.000 498.168
5920.000 498.516
5940.000 498.864
SV4
5960.000 499.301
5980.000 499.814
L SECTION FROM MBR 2 TO THATE SUMP
6000.000 500.327
AV12
6020.000 500.839
6040.000 501.400
6060.000 501.968
6080.000 502.537
6100.000 502.903
6120.000 503.017
6140.000 502.753
6160.000 502.489
6180.000 501.912
6200.000 501.067
DI PIPE
LENGTH
6220.000 500.222
6240.000 499.604
AIR VALVE
AIR VALUE
6260.000 499.397
HDPE PIPE
6280.000 499.190
DETAILS
6300.000 498.983
SLUICE VALUE
LEGEND
SCOUR VALUE
6320.000 498.542
GROUND LEVEL
PROPOSED PIPE
6340.000 498.094
6360.000 497.646
6380.000 497.199
6400.000 496.762
6420.000 496.704
10 NOS
6440.000 496.661
6460.000 496.617
18600 M
6480.000 496.574
6500.000 496.530
6520.000 496.899
SCV2
6540.000 497.319
6560.000 497.740
6580.000 498.013
200 MM DIA DI K7
6600.000 498.095
6620.000 498.193
110 MM & 90 MM DIA
6640.000 498.344
6660.000 498.495
6680.000 498.711
6700.000 498.951
6720.000 499.128
6740.000 499.254
6760.000 499.379
SCALE:
6780.000 499.450
CLIENT:
6800.000 499.423
6820.000 499.396
6840.000 499.345
6860.000 498.999
6880.000 498.652
D=300.0 mm DI K-7
6900.000 498.306
6920.000 497.945
CHECKED BY :- ENGINEER
SECTIONAL
6940.000 497.358
6960.000 496.772
6980.000 496.284
7000.000 496.038
Q-18.044 l/s
7020.000 495.759
TAL:- SHEVGAON
hf- 0.235m/km
AV13
7040.000 495.480
ENGINEER
SUB DIVISION
7060.000 495.221
7080.000 495.148
7100.000 495.075
7120.000 494.625
7140.000 494.128
DRAWN BY: SRUSHTI.A DATE:03-04-2022
7160.000 493.571
ENGINEER
EXECUTIVE
DRAWING TITLE : L SECTION FOR THATE SUMP
7180.000 492.975
7200.000 492.372
MAHARASHTRA JEEVAN PRADHIKARAN
7220.000 492.086
DIST:-AHMEDNAGAR
7240.000 491.808
REGIONAL RURAL WATER SUPPLY SCHEME
7260.000 491.538
DWG NO:
7280.000 491.269
ENGINEER
AMRAPUR-MALI BABHULGAON & OTHER 49 VILLAGES
7300.000 490.999
SUPERINTENDING
7320.000 491.178
7340.000 490.818
7360.000 490.238
7380.000 489.664
7400.000 489.382
7420.000 489.108
N
PRO
APPROACH
CHANNEL
PROPOSED
JACKWELL w
9 M DIA PUMP HOUSE
GL=426.910 FLOOR RL=465.410
KHUNTEFAL
ESR 2
FSL 493.49
LWL 489.88 GHOTAN
GL 479.95
VILLAGE KHUNTEFAL
ZONE-1 ESR 2
GADEWADI
PE
LWL 496.50 ESR 1
HD
GHOTHAN ESR-2
GHOTAN EX ESR -1 ESR-2
mm
0.0 m
11 71
FSL 499.10
D= =1,0 6
L P-4
GL 499.50 GADEWADI PROP ESR 2
KHUNTEFAL PROP ESR 3 FSL 498.33
LWL 494.84
FSL 487.85 P-52
88
m HDPE ESR 3 LWL 494.84 FSL 479.67
2610 mm
P-5293 L=30 m
L=1, 0.
GHOTAN ESR 2
LWL 476.67
D=110.0 mm HDPE LWL 484.24 D=9 GL 486.05
P-14
L=488 m J-4338
P-74 L=91 m VILLAGE GHOTAN
GHOTAN ESR 1
GL 486.05
J-4254 VILLAGE KHUNTEFAL
P-51,9
ESR 1
L=
D=15
L=44 m GHOTAN PROP ESR 3
28932 m
D=110.0 mm HDPE
0.0 mm
FSL 505.00
TALANI
m
RAOTALE
DI-K7
LWL 502.00
P-5 ,94
38 K-7 D
L=
=9
3,4 DI
29 0 m
1
0.0
2
L=
4 mm m
27 .0 ROATALE ESR m
H
P-5=350 D
PE
D GL 487.00
DI K-7
D=200.0 mm
L=2,830 m
ESR 1 FSL488.43
K-7
P-45
MBR-1
DI
TALANI ESR 1
LWL 486.02
.0 mm
8m
P-28 L=256 m
P-5276
FSL 500.75 P-3 L=18 m
ESR 2
L=3,12
D=110.0 mm HDPE J-4344
D=300
FSL 513.455 D=110.0 mm HDPE
FSL-479.12 m TO
PRABHU
WADGAON
TO KHANAPUR
FSL 507.94 VILLAGE KURUDGAON - ROATALE
P-5281
NAJIK BABHULGAON
D=110.0 mm HDPE
VILLAGE GADEWADI
J-4233 D=110.0
P-29 L=449 m
FSL-489.27 m P-5
D L=45 27
TALANI ESR 2
0.0
L=90 m
D=300.0 mm DI K-7
mm
HD
SUMP GL 477.85 GL 457.47
GADEWADI ESR-1
P-527
2
25 m
P E TALANI PROP SUMP
FSL-488.94 m ESR 1 P-5280
m FSL 486.80 ESR-1
L=3,2 mm DI K-7 L=4,165 K-7
FSL 504.01 mm DI
VILLAGE KURUDGAON - ROATALE
D=200.0
TO RAKSHI
D=35
0.0 LWL 482.42
LWL 500.54
J-4272 GL 472.56
ESR 1
TO TAJANAPUR
GL 493.364 FSL-486.28 m
P-5277 L=823 m
J-4332
GL 490.05
EXISTING
PUMP
HOUSE
STAFF
QUARTER
FSL-485.75 m D=300.0 mm
DI K-7
P-22 L=85 m
D=110.0 mm HDPE
VILLAGE NAJIK BABHULGAON
HDPE
WTP METER
ROOM
ESR 2
mm
WTP
m
NAJIK BABHULGAON PROP ESR 2
L=1,652
P-5279
D=140.0
FSL 519.50
LWL 516.50
ESR 2
LOLEGAON NAJIK BABHULGAON ESR 2
GL 501.50
NAJIK BABHULGAON PROP SUMP
SAMANGAON ESR 2 PROP
LOLEGAON ESR
ESR SUMP FSL-500.50 m
VILLAGE LOLEGAON
WADULE BK
AKHEGAON
MSRTC BUS STAND SHEVGAON
FSL-493.66 m TO
NEWASA
KRANTI CHOWK
HDPE
J-4365
AMBEDKAR CHOWK
ROAD
FSL-491.15 m
MIRI
HDPE
ROAD
MIRI
P-5317
m
MBR-2
D=90.0 mm
MIRI ROAD
L=1,447
P-5 ,92 m
L= 150
31 2 m m D
D=
MIRI ROAD
ESR 1
1 .0
8
GADGEBABA STATUE
AKHEGAON
P-5320
ROAD
MIRI ROAD
ROAD
PATHARDI-SHEVGAON
TO JOHARAPUR
WADULE BK ESR -1 m
MIRI ROAD
L=4,218 K-7
RIVER
FSL 479.29 mm DI
RIVER
DHORA
MIRI ROAD
D=150.0
IK
RIVER
VILLAGE WADULE BK
DHORA
-7
P-58 L=19 m MIRI ROAD
RIVER
D=150.0 mm DI K-7 LWL 476.29 P-5
L= 31
FSL 541.467
3,6 9
D= 01
J-4363 15 m
P-5316L=310 m J-4280 WADULE BK ESR 1
0.0
ROAD
PATHARDI-SHEVGAON
D=150.0 mm DI K-7 FSL-475.82 m P-59 GL 464.28 mm
THAKUR NIMGAON
MIRI ROAD
P-20 L=60 m
NALA
VILLAGE WADULE BK
DI
MALEGAON NE
WADULE BK ESR 2
NALA
D=90.0 mm HDPE
D=150.0 mm DI K-7
SAMANGAON ESR 1
TO MIRI
P-12 L=44 m
TO AMRAPUR
FSL 485.84 P-26
D=90.0 mm HDPE L=222 m LWL 474.45
D=90.0 mm HDPE
LWL 481.70 FSL 508.63
ESR 1 P-24 L=171 m
GL 463.64 ESR 2 MALEGAON NE ESR 1 PROP D=90.0 mm HDPE LWL 505.72
ESR 1
GL 472.23 ESR 2 SALWADGAON ESR 2 PROP
FSL 520.26 1
P-7 9 m DI K
-7 THAKUR NIMGAON ESR-1
ROAD
HEVGAON
THAKUR NIMGAON ESR 1
PATHARDI-S
m
ESR 1 WADULE BK ESR -2 FSL 524.95
LWL 515.84
2,79 m
L= 00.0
J-4276 VILLAGE THAKUR NIMGAON
GL 495.77
D=3
D=3
P-5470 m I K-7
L=
SAMANGAON ESR GL 511.037 P-5299
MBR 2 AT AKHEGAON ROAD
LWL 521.95
00
L=23 m
27
.0
D=90.0 mm HDPE
3
mm
MBR 2 (AHEGAON ROAD) GL 509.95 FSL-524.95 m GL 506.234 VILLAGE MALEGAON NE
MALEGAON -NE ESR 2 FSL 510.47 THAKUR NIMGAON ESR 2
D
J-4266 J-4331
MALEGAON -NE ESR 1
LWL 507.47
P-5296 L=46 m FSL 519.23 P-5275 L=131 m
ESR 1
HASNAPUR
D=90.0 mm HDPE D=90.0 mm HDPE
P-5297 LWL 516.23
D= L=1 P SALWADGAON ESR L=9 m GL 495.47
30 ,30 -57
D=90.0 mm HDPE
0.0 7
m m
FSL 519.43
D=90.0 mm HDPE
GL 506.23 ESR 2
SAMANGAON
ROAD
m THAKUR NIMGAON ESR-2 PROP
EVGAON
P-39
ESR 2
PATHARDI-SH
DI
L=1,340 m
LWL 515.84
P-5295
L=3,167 m K-7
D=150.0 mm DI MALEGAON NE ESR 2
K-7 P-5293
J-4244 m K-7
SALWADGAON ESR 1
L=3,048 mm DI
VILLAGE SALWADGAON
GL 505.02 D=300.0
P-5 30 mm
ESR-1
BHAGUR
L= 300
D
P-9 L=30 m
30 m DI
1,9 .0
=
0
ROAD
HASNAPUR ESR EX
AON
D=90.0 mm HDPE
PATHARDI-SHEVG
P-5330 RIVER
P-5302 L=26 m
D=200.0
L=3,038 mm DI K-7
L=197 m
P-5289
FSL 488.60 FSL 507.93
RIVER
K
ESR 3
SALWADGAON
-7
L=
LWL 485.60
BHAGUR ESR
1,
D=3 091 m
J-4343
LWL 504.93 ESR-1
m
J-4375 00.0
ROAD
P-5331 L=9 m
SHEVGAON
P-53 KOLGAON ESR
PATHARDI-
VILLAGE BHAGUR
FSL 504.23 mm
J-4374
TO
WARUR
BK
-7 J-4349
L=
WARUR BK
GL 475.60 LWL 500.47 D=3 33
5m VILLAGE HASNAPUR
N ROAD
mm
PATHARDI-SHEVGAO
P-5
DI
K-7 30 LWL 503.60
WARUR BK ESR 3
D= L=6 3
J-4248 L=106 m P-23
GL 490.54
ZONE-2
FSL-488.16 m 30 4
0.0 9 m
VILLAGE WARUR BK
D=90.0 mm HDPE
J-4351
D=150.0 mm DI K-7
KOLGAON ESR
mm
P-11L=31 m
D=90.0 mm HDPE ESR 2 DI
K-7 P-5304
VILLAGE KOLGAON
GL 493.58
L=658 m J-4377
ESR-1
KHARADGAON PROP ESR 2 D=150.0 mm
DI K-7J-4274
MANGRUL
L=1,070 m
MANGRUL BK ESR EX
P-50
P-53 FSL 516.21 P-5332
NALA
FSL 505.63
NALA
L=3, 29
KH
L=87 m
ROAD
FSL 513.71
PATHARDI-SHEVGAON
KH
TO SULTANPUR
L= 00.0
WARUR KH ESR
D=
DI
91
NALA
K-7 GL 499.60
0.0 mm LWL 513.96
2
5
LWL 492.49 D=11
MANGRUL BK ESR
D=90.0 mm
L=1,556
P-5334 m
m mD
SULTANPUR ESR WARUR KH ESR
mm
FSL 519.00
D=11 2 m
NALA
WARUR BK ESR 1
SULTANPUR KH
40
FSL 496.69 GL 482.92
P-5 I K
P-5343 J-4239
VILLAGE MANGRUL BK
P-53
P-53
L=65
0.0
WARUR BK ESR 2
29 -7
ESR-2
VILLAGE WARUR BK
NALA
LWL 493.09 FSL 516.20 50.03 m J-4359 GL 504.12
GL 483.15
KHARADGAON
NALA
D=90.0 mm HDPE
AWHANE BK
mm
HDPE
VILLAGE MANGRUL KH
DI
TO
SHINGORI
GL 501.00 LWL K-7
GL 482.00
ESR 2 ESR 1 FSL 509.38 KHARADGAON ESR
J-4336
J-4387
FSL-500.87 m
FSL 515.20 513.20 P-5312
L=11 m
LWL 512.20 D=90.0 mm HDPE
LWL 504.87
AMRAPUR
SULTANPUR KH ESR
VILLAGE SULTANPUR KH
VILLAGE KHARADGAON
GL 501.20
ESR-1
WARUR KH P-5282 MANGRUL BK PROP ESR 2
L=15 m
3
K-7
AWANE BK ESR 1 FSL-515.20 m
32
ESR GL 495.27 D=140.0 mm HDPE
MBR -3 KOLGAON
P-5
DI
DI K-7
ESR-1
mm
FSL 509.62
m
SHAHAJAPUR ESR KHARADGAON EX ESR
17
0.0
4,0
LWL 505.49 AWHANE KH SHAHAPUR ESR-1
ESR 1
mm
D=90.0 m
MANGRUL
25
L=
FSL 487.57
D=
L=1,431
P-37
LEGENDS
GL 495.42 P-5294
P-5 L=19 m
D=90.0 mm HDPE FSL 506.75 LWL 483.98
P-5290
L=199 m
D=90.0 mm HDPE
J-4344
L=161 m
D=150.0 mm DI K-7
P-5302
L=930 m
AWHANE BK ESR 1
VILLAGE AWHANE BK
NALA
LWL 503.75
GL 473.98
SHAHAJAPUR ESR
FSL 530.225 BK
ESR-1
VILLAGE SHAHAJAPUR
SHAHAJAPUR TO SHAHAJAPUR
P-5
D=L=3 33 WADGAON ESR 2 PROP
HDPE
L=41 m 0.0 6
D=150.0 mm DI K-7 m
m
ESR 1 FSL 505.90
m
.0 mm
FSL 527.670. 92 7
P-52 4 m DI K- GL501.15 ESR 1 DI WADGAON ESR 1 LWL 502.90
03
VILLAGE BHARANPUR
01 mm K-7
THATE
D=90.0
L=1,422mm DI K-7
L=3,00.0
P-36
P-53
J-4356
LWL 524.670 D=1
J-4357 FSL 500.07 9
TO
KOLGAON
P-5307 FSL-501.70 m 30
FSL 505.12 FSL 510.12 P-5308 P-5 m
WADGAON ESR 2
GL 512.670 D=90.0 mm
LWL 500.92 D=90.0 mm HDPE L=
ZONE-3
68 307
K-7
SUMP
90 1227 96
NALA
PE
PL-1=3 0.0
WADGAON ESR 1
LWL 546.68
P-5
FSL 511.12 GL 486.08
NALA
NALA
2
DI
NALA
0.0 2 m
D
TO JAVRE
P-5
mm m
HD
0 0 m mm
=1
WASTI
TITARFA
P-75
m
GL 499.309
NALA
GL 490.04
VILLAGE WADGAON
P-5300
m
1
P-5 21 m
J-4317
NALA
LWL 507.09
L=
L=
J-4352
L=341 m
MBR 3 AT AMRAPUR
L=225 P-5298
30
1
ESR-2 L=3,992
L=
SUMP
20
m
.0
L=14 m
6
P-76
D=200.0 m GL 534.68
D=
P- D=150.0 mm DI K-7 P-53
H
mm DI D=11 13 L=
D
24
D=
K-7
GL 496.27 0.0 34 m 7
PE
AWHANE KH SHAHAPUR-2
SUMP
VILLAGE BHARANPUR
FSL 502.54 28 1 m L=
AMRAPUR ESR 1
THATE SUMP
HD P-5=73
VILLAGE AMRAPUR
AMRAPUR ESR 2
AKHEGAON
FSL 501.50
ESR 2 PE 0.0 mm
TO
L P- FSL-530.06 m
5326
VILLAGE THATE
7 J-4358
NALA
PATHARDI-SHEVG
TISGAON
LWL 513.50
VILLAGE AMRAPUR
L=19
AON
ROAD
L=11 m
TISGAON
TO
TO SHINGORI
D=200.0 mm DI K-7 0
35 0.0 D=200.0 mm DI K-7
P-5 m mm
AWHANE KH-
J-4343 J-4379
VILLAGE AMRAPUR
NALA
FSL-492.64 m DI K-
GL494.24 FSL-499.50 m 25 PE
TO
SUSARE
1,5 D 7
GL 516.50
SUSARE
L= mmH
ESR-2
CANAL
90
ESR-2
CANAL
D=
ESR 2
RAW WATER RISING MAIN
J-4389 BUS STOP
FSL-506.46 m
HDPE
P-5 015 m
PE
FSL 511.54
ESR-1
L=
HD
34
2,
D=90 73 m
7
0.0 1 m
9
KALEGAON
.0 mm
33
L=1,6 97
mm
LWL 508.54 AKHEGAON TITARFA ESR Ex.
P-5
D=9 1,90
P-52
CANAL
CANAL
L=
ROAD
PATHARDI-SHEVGAON
FAKIR
L=4,935
m LWL 50056 FSL 511.25
FSL 507.27 D=150.
0 mm FSL 504.14 ESR LWL 523.25
MBR EXISTING
DI K-7 J-4338
ESR 1 LWL 504.32 J-4339
P-5285
FSL 509.70
L=1,217 m P-5288
TO
GL 503.92
PAGORI
FSL-494.35 m
WARUR
CHITALI EX ESR 1
BK
D=140.0 mm HDPE
ESR 2 LWL 499.17 LWL 506.70 P-5286
L=1,679 m GL 526.25
P-5 1 m mm
L= 150
FSL 515.55
D=
L=9 m
VILLAGE SUSARE
SUSARE ESR 1
22 .0
DI K-7
28
GL 487.61
PATHARDI-SHEVGAON
TO
PAGORI
PIMPALGAON
ESR 1
K-7
NALA
P-5423
L=369 m
GL 504.15
P-5422
D=90 mm HDPE
NALAWDE
DONGAR
J-4436
L=27 m FSL-504.15 m
J-4439
P-7
L=245 m
J-4438
P-12 L=8 m
NEWLY PROPOSED ESR
D=110.0 mm HDPE
L=
P-3
D=1 3,55
2 SAKEGAON
E
00 4 m
P
.0
HD
mm
DI
0.0 m
mm
K-7
9
D= 2,05
P-8
EXISTING ESR
11
L=
FSL 525.30
PRABHU PIMPRI
LWL 522.30
FSL512.79
P
HD m
LWL 530.27
D=150.0 mm DI K-7
LWL 510.06
DISMENTALED AND PROPOSED ESR
L=
m
P-46 L=48 m
m
D=90.0 mm HDPE
GL 510.50 PRABHU PIMPARI ESR2
.0
L=1,728 m
P-50 L=979 m
GL 521.91 GL 499.79 FSL-512.79 m
90
D=150.0 mm DI K-7
ESR 1
PRABHU PIMPRI ESR 2
P-21
D=
ESR-2 P-49
L=2,488 m
P-48 J-4412
L=97 m
D=150.0 mm DI K-7
J-4413
FSL 513.85
PADALI ESR 2 PROP
D=90.0 mm HDPE
P-47
D=15
L=42 0.0 m
ZONE-4
3
FSL 532.96
m
m mm HDPE
P-15
ESR 1
K-7
J-4369
LWL 529.96
ESR 1 J-4417
L=39
D=90
.0
FSL 522.32
FSL 530.73
SUMP
-7
D=1
L=6210.0
K
DI
LWL 519.32
P-6 438 0.0
P-3
5
LWL 528.22
15 9 m
mm
6 m mm
P-4
L= =11
GL 514.96
D
86
0.0
P-57
L=
L=231 m
m mm
GL 504.32
H
D=
SANGVI KH ESR 1
DPE
GL 516.70
ESR 2
SANGVI KH
J-4408
HD
P- 139 42 m
PE
J-4406
L=
J-4403 J-4425 P-43
P-39 L=9 m
L=13 m D=90.0 mm HDPE
FSL528.87 FSL 533.49
ESR 2 P-33 L=37 m P
D= -54 L=
P-36
D=150.0
L=2,271 mm DI K-7
D=90.0 mm HDPE
LWL 526.29 90
.0 1,19
LWL 530.49
WTP
mm 0
ESR 1 HD m
PE
FSL 537.54 PE
90 1,8 1
m m
HD
m
D= L= P-5
.0 42
GL 520.49
m
FSL 522.55
DI
PE
90 =36 7
MALEGAON
mm
15 5 m
P-2
m m
HD
LWL 519.13
8
P-3
5
D= 2,76
m
0.0
ESR-1
L
J-4381 P-5412
L=
.0
GL 514.14
L=726 m
KHERDE EX ESR 1
ESR 2 ESR 1 JACK WELL
D=
ESR-1 J-4372
P
4m
HD
6
LWL 532.06
P-2
mm
DANGEWADI EX ESR 1
L=
FSL 532.48
.0
PUMP HOUSE
J-4401 L=1,826 m
FSL 543.65 D=150.0 mm DI J-4395
DANGEWADI
P-24 D=90.0 mm HDPEL=
LWL 540.65 P-5429 313
HATRAL-SAIDAPUR
L=8 m
L=245m D=9 27 m J-4393
0.0 mm
HDPE
GL 528.65
ESR-1
KHERDE ESR 2 PROP
KHERDE
D=150.0 mm DI K-7
L=3,5
P-56
D=10
0.0
57 m DI K-
DULECHANDGAON
L=1,844 m
mm
P-25
LWL 539.49
LWL 543.62
ESR 1
PATHARDI REGIONAL RURAL WATER SUPPLY SCHEME
L=4,852 m
GL 528.99 J-4397
FSL 543.65
DI K-7
P-22 L=26 m
J-4420
P-20 0m GL 531.62
L=13 L=1,599 m
P-31
209
D=100.0 mm
AGASKHAND EX ESR 1
PE
L=5, HD
P-52 L=94
DULECHANDGAON ESR 1
ESR-1 0.0
mm
MBR-4
D=11
ESR 2
P-53
L=4,240 m
MALIBABHULGAON ESR 1
J-4380
GL 524.66
ESR-2
D=150.0
mm DI K-7 L=51 m P-34
D=90.0 mm
FSL 555.50 AGASKHAND ESR 2 PROP
LWL 539.22
0 mm m
LWL 551.65
LWL 566.60 ESR 2
63
P-1L=8
GL 540.50
ESR 1 FSL 550.00 FSL 592.651
D=90.
P-55 J-4422
GL 553.60 -7 GL 541.65 GL 529.22
L= LWL 547.00 IK
D=151,559
P-16
L=42
D=90
SHEKATE
DI 4,2 .0
.0 mm
J-4445
m
K-7
GL 535.00 L= 00
LWL 556.65 MALIBABHULGAON ESR 2
LWL 587.738
D
=2
ESR P-5413
L=168 m
HDPE
J-4428
P-3
L=
FSL 559.60
D
J-4386
3,1
NIVDUNGE ESR 1
=2
GL 546.65
00
34 m
NIVDUNGE
.0
m DI
L=15 m
D=90.0 mm HDPE
K-7
WALUNJ ESR
WALUNJ ESR
FSL-559.60 m P-2 m PE
GL 544.30 276
L=2, 0 mm
HD
L=294 m
0.
D=11
P-19
MALIBABHULGAON
P-
L=37 10 GL 577.930
D=15 5 m J-4391
0.0 mm
J-4430
AGASKHAND
SECTIONAL
DI K-
MBR-4 P-4
7
L=3,444 m
SUB DIVISION EXECUTIVE SUPERINTENDING
D=112.0 mm
FSL 493.49 FSL 496.750 FSL 500.75 FSL 501.05 FSL 499.10
LWL 489.88 LWL 493.750 LWL 496.44 LWL 498.05 LWL 494.54
L=135M
L=530M
L=18M
L=20M
ROATALE ESR
MBR-1 TO KUNTEFAL
ESR-2 L=3901M 50,000 LITR
TALANI ESR2
29,000 LITR FSL 488.43
MBR-1 AT SHEVGAON WTP
FSL 507.94 LWL 486.02
FSL 513.455 LWL 503.94
L=455M
LWL 508.462 GL 476.17
GL 489.94
L=20M L=256 M
GL 493.364 MBR-1 TO GADEWADI ESR L=18023M
RL 497.495 MEASURING
WEIR NAJIK BABHULGAON ESR 1
NAJIK BABHULGAON ESR 2 KURUDGAON ESR 2 KURUDGAON ESR 1 GADEWADI ESR
50,000 LITR 36,000 LITR 10,000 LITR 50,000 LITR 1,17,000 LITR
WTP TO MBR-1 AT SHEVGAON L=75 M
2500 1500
Ø 12.50 MM
FSL 504.01 FSL 519.50 FSL 490.85 FSL 486.80 FSL 479.47
LWL 500.54 LWL 516.50 LWL 487.85 LWL 482.42 LWL 476.47
FLASH
GL 493.495 5.50 M
MIXER
300
SALWADGAON ESR 1 SALWADGAON ESR 2 MALEGAON NE ESR 1 MALEGAON NE ESR 2 THAKUR NIMGAON ESR 1 HASNAPUR ESR KOLGAON ESR MANGRUL BK ESR MANGRUL KH ESR
EXISTING WTP 50,000 LITR 25,000 LITR 26,000 LITR 40,000 LITR 50,000 LITR 1,33,000 LITR 50,000 LITR 55,000 LITR 25,000 LITR
FSL 519.43 FSL 524.95 FSL 519.23 FSL 520.26 FSL 508.63 FSL 523.00 FSL 507.11 FSL 517.60 FSL 516.75
MBR-2 AT AKHEGAON
LWL 515.84 LWL 521.95 LWL 516.23 LWL 515.84 LWL 505.72 LWL 520.00 LWL 503.60 LWL 514.60 LWL 513.96
FSL 541.467
L=1340M
L=106M
L=171M
L=11M
L=30M
L=19M
L=26M
L=9M
L=23
511.037
MBR-2 TO MANGRUL KH ESR L=14522M
PROPOSED JACKWELL AKHEGAON TITARFA ESR
WTP TO MBR-4 AT PATHARDI L=24400M D=300MM KHARADGAON ESR THAKUR NIMGAON ESR 2 KOLGAON ESR 2
JAYAKWADI DAM 1,65,000 LITR 1,27,000 LITR
48,000 LITR 10,000 LITR
MBR-2 TO SAMANGAON ESR 2 L=12478M FSL 512.27 FSL 511.48
TOP R.L.475.00M
LWL 509.27 LWL 508.48 FSL 510.47 FSL 515.20
SAMANGAON ESR 2 LOLEGAON ESR SAMANGAON ESR 1 WADULE BK ESR-2 WADULE BK ESR-1 LWL 507.47 LWL 512.20
EXISTING APPROACH BRIDGE 43,000 LITR 50,000 LITR 50,000 LITR 100000 LITR 50,000 LITR
DISCHARGE FLOOR GL 495.27 GL 496.48
LEVEL 469.0M FSL 493.66 FSL 490.86 FSL 485.84 FSL 478.03 FSL 479.29 GL 495.47 GL 505.20
LWL 490.66 LWL 487.41 LWL 481.70 LWL 474.45 LWL 476.29 L=15M MBR-2 TO AKHEGAON DONGAR ESR L=11642M L=9M
L=1904M
FSL 526.25
L=861M
L=1447M L=44M L=222M L=60M FSL 505.63 FSL 509.70
LWL 502.63 LWL 506.70 LWL 523.25
MBR 3 AT AMRAPUR
GL 490.63 GL 494.70 GL 511.25
FSL 530.225
LWL 525.757
WADGAON ESR 1 WADGAON ESR 2 THATE ESR
MBR-2 TO BHAGUR ESR L=7532M 76,000 LITR
50,000 LITR 16,000 LITR
FSL 500.07 FSL 505.90 FSL 549.68
GL 499.309 WARUR BK ESR-3 WARUR BK ESR-1 WARUR BK ESR-2 BHAGUR ESR 2 BHAGUR ESR 1
LWL 496.83 LWL 502.90 LWL 546.68
50,000 LITR 50,000 LITR 50,000 LITR 10,000 LITR 50,000 LITR
PUMPING MAIN TO MBR-3 L=115M D=300MM
L=24400M D=300MM FSL 504.23 FSL 497.94 FSL 496.48 FSL 488.60 FSL 490.42
GL 486.08 GL 490.90 GL 534.68
LWL 500.47 LWL 484.26 LWL 492.49 LWL 485.60 LWL 486.22
GL 482.00 GL 493.54
GL 473.98 L=18 M
GL 487.61
MBR 4 AT PATHARDI
MBR-3 TO SULTANPUR KH ESR L=2855M L=8M
MBR-3 TO SUSARE ESR L=7104M
AWHANE BK ESR 1 FSL 592.651
AMRAPUR ESR-2 AMRAPUR ESR-1 KALEGAON FAKIR ESR
60,000 LITR LWL 587.738
40,000 LITR 50,000 LITR 50,000 LITR
FSL 514.42 FSL 511.12 FSL 510.12 FSL 507.27
LWL 511.42 LWL 507.09 LWL 505.88 LWL 504.32
GL 577.930
FSL 533.49
LWL 530.49
MBR-3 TO AWHANE BK ESR L=5900M L=1673M
GL 520.49
AWHANE BK ESR-2 BARHANPUR ESR AWHANE KH+SHAHAPUR ESR
1,00,000 LITR 25,000 LITR 70,000 LITR
FSL 506.75 SANGAVI BK ESR 1
FSL 527.670. FSL 516.15
LWL 503.75 25,000 LITR
LWL 524.670 LWL 513.15 PAGORI PIMPALGAON ESR 2
DULECHANDGAON ESR 1 MALEGAON ESR 1 MALEGAON ESR 2 KHERDE ESR PAGORI PIMPALGAON ESR 1
FSL 528.87
50,000 LITR 54,000 LITR 30,000 LITR 44,000 LITR 50,000 LITR 1,23,000 LITR
L=1225 M
LWL 526.29
GL 512.670 GL 501.15 GL 493.75
FSL 543.99 FSL 511.50 FSL 512.94 FSL 543.65 FSL 513.85 FSL 522.32
LWL 539.49 LWL 508.50 LWL 509.94 LWL 540.65 LWL 509.87 LWL 519.32
L=25M
GL 516.17
L=867 M
L=109M
L=17M
L=12M
SAKEGAON ESR 2 DANGEWADI ESR
L=39M
CHITALI ESR 2 CHITALI ESR 1 SAKEGAON ESR 1
60,000 LITR 40,000 LITR 50,000 LITR 1,16,000 LITR 54,000 LITR
L=2073M
L=974M
GL 535.00
SUMP SECTIONAL SUB DIVISION EXECUTIVE SUPERINTENDING
L=863M
CHECKED BY :- ENGINEER ENGINEER ENGINEER ENGINEER
(m)
(m)
(m)
Chainage
PIPE DIA
Datum: 485.0
AMRAPUR MBR-3
487
489
491
493
495
497
499
501
503
505
507
509
511
513
515
517
519
521
523
525
527
529
0.000 498.102
20.000 497.969
AV-1
60.000 497.092
80.000 496.466
100.000 495.825
SV-1
120.000 495.183
140.000 494.541
D=200.0 mm DI K-7
160.000 494.184
180.000 493.844
Q=14.884 Lit/sec
220.000 493.400
240.000 493.458
GL-493.40 m
260.000 493.705
FSL-509.62 m
280.000 494.040
LSL-525.76 m
GL 499.309
300.000 494.393
HGL-525.48 m
320.000 494.589
340.000 494.729
AMRAPUR MBR-3
400.000 495.400
420.000 495.655
Q=14.884 Lit/sec
D=200.0 mm DI K-7
L=11 m
460.000 496.265
D=200.0 mm DI K-7
480.000 496.614
500.000 496.994
56
AV-2
520.000 497.393
0.
GL-498.68 m
L=225 m 2
58 00
0
20
.
540.000 498.273
0.
00
00
TO
0
HGL-525.08 m
560.000 498.683
49
GL-498.68 m
8. AM
D=200.0 mm DI K-7
68
580.000 498.245
49 3
49
8.
RA
2
3
600.000 498.357
.4
PU
O T 45 R
00
620.000 498.141
ES
640.000 497.906
D= AMR R-
11 A 2
GL-498.25 m
660.000 497.764
hf=0.72 m/km
0. PU
0
L=341 m
HGL-525.07 m
680.000 497.780
Q=11.343 Lit/sec
mm R E
SR
700.000 497.277
HD -
720.000 496.603
PE 1
GL-498.25 m
740.000 495.968
GL-493.40 m
760.000 495.489
780.000 495.186
800.000 494.751
D=200.0 mm DI K-7
820.000 494.277
840.000 493.968
860.000 493.881
880.000 493.701
900.000 493.267
920.000 492.834
940.000 492.400
960.000 492.019
980.000 491.809
1000.000 491.598
AV-3
1020.000 491.313
1040.000 490.418
1060.000 489.615
1080.000 489.702
1100.000 489.496
1120.000 489.289
1140.000 489.283
1160.000 489.690
1180.000 489.530
1200.000 489.354
1220.000 489.251
1240.000 489.148
1260.000 489.099
1280.000 489.077
SCV-1
1300.000 489.560
1320.000 489.599
1340.000 489.770
1360.000 489.917
1380.000 489.979
1400.000 490.083
1420.000 490.231
1440.000 490.408
1460.000 490.447
1480.000 490.472
1500.000 490.496
AV-4
1520.000 490.514
1540.000 490.575
1560.000 490.636
1580.000 490.698
1600.000 490.739
1620.000 490.843
1640.000 490.928
1660.000 490.984
1680.000 490.987
1700.000 491.038
1720.000 491.059
1740.000 491.053
1760.000 491.129
1780.000 491.206
1800.000 491.257
1820.000 491.297
1840.000 491.336
1860.000 491.373
1880.000 491.492
1900.000 491.670
1920.000 491.851
1940.000 491.954
1960.000 492.054
1980.000 492.168
2000.000 492.281
AV-5
2020.000 492.394
2040.000 492.506
2060.000 492.585
2080.000 492.667
2100.000 492.749
SV-2
2120.000 492.852
2140.000 492.904
2160.000 493.080
2180.000 493.258
2200.000 493.458
2220.000 493.658
2240.000 493.858
2260.000 493.973
2280.000 494.049
2300.000 494.156
2320.000 494.332
2340.000 494.533
2360.000 494.727
2380.000 494.964
L=3,992 m
D=200.0 mm DI K-7
2400.000 495.164
2420.000 495.332
2440.000 495.501
2460.000 495.638
2480.000 495.670
2500.000 495.748
2520.000 495.894
2540.000 496.203
2560.000 496.276
2580.000 496.349
2600.000 496.530
D=200.0 mm DI K-7
2620.000 496.784
2640.000 497.115
2660.000 497.479
AV-6
2680.000 497.569
2700.000 497.689
2720.000 497.825
2740.000 497.973
2760.000 498.136
2780.000 498.292
2800.000 498.408
2820.000 498.655
2840.000 498.922
2860.000 499.183
2880.000 499.429
2900.000 499.665
2920.000 499.839
2940.000 499.969
2960.000 500.098
2980.000 500.297
3000.000 500.684
3020.000 500.897
3040.000 501.030
3060.000 501.175
3080.000 501.321
3100.000 501.524
3120.000 501.726
3140.000 501.987
3160.000 502.485
AV-7
3180.000 502.407
3200.000 502.284
3220.000 502.219
3240.000 502.212
3260.000 502.223
3280.000 502.270
3300.000 501.300
hf=0.421 m/km
Q=8.507 Lit/sec
3320.000 501.090
3340.000 500.919
3360.000 500.606
3380.000 500.355
3400.000 500.214
3420.000 500.056
3440.000 499.802
3460.000 499.589
3480.000 499.441
3500.000 499.250
3520.000 498.996
3540.000 498.699
3560.000 498.516
AV-8
3580.000 498.332
3600.000 498.118
3620.000 497.896
3640.000 497.693
3660.000 497.508
3680.000 497.323
3700.000 497.138
3720.000 496.953
3740.000 496.703
3760.000 496.331
3780.000 495.964
L SECTION FROM AMRAPUR MBR-3 TO AWHANE BK ESR-1
3800.000 495.826
3820.000 495.689
3840.000 495.551
3860.000 495.196
3880.000 494.545
3900.000 494.333
3920.000 494.193
3940.000 494.027
3960.000 493.868
=
3980.000 493.616
4000.000 493.460
S
SV-3
T HA
4020.000 493.402
D O H
4040.000 493.325
AV-9
90 AWHAPU
4060.000 493.165
.0 AN R E
4080.000 492.861
m E S
HD+
4100.000 492.565
m KH R-1
PE
4120.000 492.289
4140.000 492.013
46
00
4160.000 491.737
.0
GL-493.01 m 00
45
4180.000 491.401
6 0.
4200.000 491.015
49
00
3
4220.000 490.825
.0
15
4240.000 490.657
49
3.
4260.000 490.523
07
0
SCV-2
4280.000 490.457
4300.000 490.681
4320.000 490.853
S
4340.000 491.031
TO HA
4360.000 491.341
H
L=41 m
4380.000 491.575
AW AP
N
4400.000 491.737
HA UR
E
4420.000 491.774
+
E SR
GL-493.07 m
4440.000 491.810
KH -2
4460.000 491.830
4480.000 491.835
D=90.0 mm HDPE
4500.000 491.839
4520.000 492.090
D=150.0 mm DI K-7
4540.000 492.683
GL-493.01 m
HGL-523.39 m
4560.000 493.015
4580.000 493.084
AV-10
4600.000 493.070
4620.000 492.113
4640.000 491.959
4660.000 491.715
GL-493.07 m
4680.000 491.340
HGL-523.34 m
hf =1.152 m/km
Q =6.875 Lit/sec
L=930 m
4700.000 490.964
4720.000 490.763
4740.000 490.665
4760.000 490.564
D=150.0 mm DI K-7
4780.000 490.459
4800.000 490.357
4820.000 490.255
4840.000 490.087
4860.000 489.853
4880.000 489.720
4900.000 489.646
4920.000 489.613
4940.000 489.589
4960.000 489.528
4980.000 489.541
SCALE:
5000.000 489.842
AV-11
5020.000 489.927
CLIENT:
5040.000 489.864
55
5060.000 489.802
40
. 00
5080.000 489.739
0
GL-491.70 m
5100.000 489.677
L=161 m
D=150.0 mm DI K-7
49
5120.000 489.615
1 .70
5140.000 489.552
hf =0.985 m/km
0
Q =6.319 Lit/sec
D=
5160.000 489.413
TO
D=150.0 mm DI K-7
9
5180.000 488.471
0.
HA
0
5200.000 488.258
56
RA
5220.000 488.065
80
m
.0
NP
CHECKED BY :- ENGINEER
m
5240.000 487.849
00
UR
SECTIONAL
5260.000 487.876
ES
HD
49
5280.000 487.297
R-
1.
2
48
5300.000 486.169
PE
SCV-3
5320.000 487.924
D=
5340.000 487.678
TO
15
5360.000 489.412
0
AW
5380.000 489.709
.0
59
HA
5400.000 489.755
TAL:- SHEVGAON
2.
NE
m
05
9
5420.000 489.891
m
BK
GL-491.48m
ENGINEER
5440.000 490.224
SUB DIVISION
ES
DI
5460.000 490.424
R
2
49
K
5480.000 490.560
5.
DI PIPE
-7
PR
5500.000 490.823
1
LENGTH
O
P
5520.000 491.121
PIPE LINE
(s
HGL-522.43 m
AIR VALVE
5540.000 491.700
AIR VALUE
HDPE PIPE
um
PROPOSED
p)
5560.000 491.707
AV-12 GL-491.70
GL 495.42 m
5580.000 491.873
LEGEND
DETAILS
m
SCOUR VALVE
SCOUR VALUE
SLUICE VALUE
5600.000 492.039
DRAWN BY: SRUSHTI.A DATE:04-04-2022
GROUND LEVEL
5620.000 492.444
L=199 m
AWHANE BK ESR 1
ENGINEER
EXECUTIVE
5640.000 492.857
Q =5.37 Lit/sec
5660.000 493.414
hf =0.729 m/km
5680.000 493.589
42 FSL-509.62 m
5700.000 493.751
MAHARASHTRA JEEVAN PRADHIKARAN
5720.000 493.882
GL-491.48m
5900 M
DIST:-AHMEDNAGAR
5740.000 494.013
D=90.0 mm HDPE
5760.000 493.979
HGL-522.43 m
5780.000 493.924
SV-4
90 MM DIA
DWG NO:
5800.000 494.251
5820.000 494.660
ENGINEER
D=90.0 mm HDPE
hf =2.471 m/km
5840.000 495.289
AMRAPUR-MALI BABHULGAON & OTHER 49 VILLAGES
5860.000 495.961
SUPERINTENDING
AV-13
5880.000 495.855
200 &150 MM DIA
5900.000 495.747
5902.059 495.421
50 MM DIA - 1 NOS
SLUICE VALVE 90 MM DIA - 1 NOS
TOTAL - 4 NOS
TOTAL - 13 NOS
TOTAL - 3 NOS
HGL-525 m
FSL-509.62 m
GL 495.42
AWHANE BK ESR 1
LEGEND
AIR VALUE
SLUICE VALUE
scv
SCOUR VALUE
GROUND LEVEL L SECTION OF FROM SHEVGAON MBR-1 TO GADEWADI ESR
PROPOSED
PIPE LINE
DETAILS
LENGTH 18,467 M
HDPE PIPE 90 & 110 MM DIA
DI PIPE 200, 300 & 350 MM DIA
DETAILS
LENGTH 18,467 M
HDPE PIPE 90 & 110 MM DIA
DI PIPE 200, 300 & 350 MM DIA
SLUICE VALUE
scv
SCOUR VALUE
GROUND LEVEL
PROPOSED PIPE
DETAILS
LENGTH 4579 M
(m)
DI PIPE
Chainage
PIPE DIA
Datum: 485.0
LENGTH
PIPE LINE
AIR VALVE
AIR VALUE
HDPE PIPE
PROPOSED
Existing Ground Level
481
487
489
491
493
495
497
499
501
503
505
507
509
511
513
515
517
519
521
523
525
527
FSL-530.225 m 529
483
485
0.000
LEGEND
498.332
DETAILS
SCOUR VALVE
SLUICE VALVE
SCOUR VALUE
SLUICE VALUE
GROUND LEVEL
MBR-3 AT AMRAPUR
20.000 497.971
-
SCALE :- HOR 1:2000,VER. 1:200
40.000 497.478
60.000 496.750
80.000 496.503
LSL-525.76 m
GL 499.309
FSL-509.62 m
2853 M
LSL-525.757 m
100.000 496.187
SV-1
120.000 495.527
90 MM DIA
140.000 494.846
00
.0
0
160.000 494.303
0
180.000 493.852
49
8.
200.000 494.020
50 MM DIA - 6 NOS
50 MM DIA - 2 NOS
90 MM DIA - 2 NOS
33
2
220.000 494.208
240.000 493.824
260.000 493.439
280.000 493.150
300.000 492.869
320.000 492.856
340.000 492.993
360.000 493.118
MBR-3 AT AMRAPUR
380.000 493.164
400.000 493.210
420.000 493.368
440.000 493.510
480.000 493.374
500.000 493.250
520.000 493.108
L=1
540.000 492.967
D=9
,
560.000 492.783
0
4
.
580.000 492.512
2
0
600.000 492.352
2
620.000 492.450
640.000 492.548
m
660.000 492.646
mm
680.000 492.743
700.000 492.840
H
720.000 493.158
740.000 493.124
D
760.000 493.090
D=90.0 mm HDPE
Location: Maharashtra-MH
780.000 493.007
840.000 492.511
860.000 492.384
880.000 492.256
AV-2
900.000 491.919
920.000 491.509
940.000 491.197
980.000 491.005
hf=2.393 m/km
1000.000 490.909
Q=1.979 Lit/sec
1020.000 490.813
1040.000 490.797
1060.000 490.817
1080.000 490.838
1100.000 490.789
1120.000 490.633
1140.000 490.477
1160.000 490.313
1180.000 490.145
1200.000 489.978
1220.000 489.726
1240.000 489.405
1260.000 489.085
14
20
1280.000 488.765
.0
GL-488.32 m
1300.000 488.444
00
1320.000 488.123
48
1340.000 487.887
D
8.
32
=9
1360.000 487.662
8
0.0
1380.000 487.809
TO
m
1400.000 488.257
m
HGL-522.35 m
SH
1420.000 488.328
A
H
GL-488.32 m
H
D
1440.000 489.048
AJ
AV-3
PE
1460.000 488.659
A
1480.000 488.270
PU
R
1500.000 487.881
ES
1520.000 488.258
SCV-1
R
1540.000 488.759
1560.000 489.260
1580.000 489.685
1600.000 489.930
1620.000 490.174
1640.000 490.419
1660.000 491.002
1680.000 491.539
1700.000 491.695
1720.000 491.857
1740.000 492.052
1760.000 492.109
AV-4
1780.000 491.905
L=1,431
1800.000 491.695
1820.000 491.519
1840.000 491.399
D=90.0 m
1860.000 491.279
1880.000 491.160
1900.000 491.040
mm HD
1920.000 490.921
L SECTION FROM AMRAPUR MBR-3 TO SULTANPUR KH ESR
1940.000 490.756
1960.000 490.548
PE
1980.000 490.340
2000.000 490.132
2020.000 490.012
2040.000 489.899
2060.000 489.832
2080.000 489.796
2100.000 489.760
SV-2
2120.000 489.632
2140.000 489.429
2160.000 489.226
2180.000 489.023
D=90.0 mm HDPE
2200.000 488.837
2220.000 488.683
2240.000 488.529
2260.000 488.375
2280.000 488.505
SCV-2
2300.000 488.853
28
2320.000 489.202
54
.9
AV-5
1
2340.000 489.271
5
hf=0.775 m/km
2360.000 489.141
Q=1.076 Lit/sec
48
2380.000 489.003
2.
FSL-496.69 m
00
2400.000 488.897
1
2420.000 488.887
2440.000 488.878
2460.000 488.868
SULTANPUR ESR
2480.000 488.859
SCALE:
CLIENT:
2500.000 488.767
2520.000 488.601
2540.000 488.435
2560.000 488.501
GL 482.00
2580.000 488.724
2600.000 488.883
CHECKED BY :- ENGINEER
SECTIONAL
2620.000 488.857
2640.000 488.831
2660.000 488.747
2680.000 487.583
TAL:- SHEVGAON
2700.000 487.420
ENGINEER
SUB DIVISION
2720.000 487.257
AV-6
2740.000 486.155
2760.000 485.078
2780.000 484.002
DRAWN BY: SRUSHTI.A DATE:07-04-2022
2800.000 484.636
ENGINEER
EXECUTIVE
2820.000 483.265
MAHARASHTRA JEEVAN PRADHIKARAN
2840.000 483.895
HGL-521.24 m
2854.915 482.001
DIST:-AHMEDNAGAR
REGIONAL RURAL WATER SUPPLY SCHEME
DWG NO:
ENGINEER
AMRAPUR-MALI BABHULGAON & OTHER 49 VILLAGES
FSL-496.69 m
SUPERINTENDING
SULTANPUR KH ESR