LEGEND

AIR VALUE

SLUICE VALUE
scv
SCOUR VALUE

GROUND LEVEL

PROPOSED PIPE
DETAILS
LENGTH 460 M

HDPE PIPE 110 MM MM DIA


AIR VALVE 50 MM DIA -1 NOS
7220.000 492.086

7240.000 491.808

7260.000 491.538

7280.000 491.269

7300.000 490.999

7320.000 491.178

7340.000 490.818

7360.000 490.238

7380.000 489.664

7400.000 489.382

7420.000 489.108

7440.000 488.833

7460.000 488.452

7480.000 488.050

7500.000 487.704

7520.000 487.925

AV14
7540.000 488.152

7560.000 488.380

7580.000 488.608

7600.000 488.640

7620.000 487.941

7640.000 487.359

7660.000 487.834

SCV3
7680.000 488.315

7700.000 488.796

7720.000 488.835

7740.000 488.862

7760.000 488.904

7780.000 488.955

7800.000 489.007

7820.000 489.135

7840.000 489.262

7860.000 489.427

7880.000 489.657

7900.000 489.888

7920.000 490.086

7940.000 490.296

7960.000 490.633

7980.000 490.970

8000.000 491.289

8020.000 491.592

SV5 AV15
8040.000 491.921

8060.000 492.468

8080.000 493.118

8100.000 493.337

8120.000 493.811

8140.000 494.321

8160.000 494.748

8180.000 495.106

8200.000 495.495

8220.000 496.274

8240.000 497.054

8260.000 496.750

8280.000 496.345

GL-497.05 m
8300.000 496.353

8320.000 496.648

8340.000 497.140

HGL- 534.10
8360.000 497.657

8380.000 498.171

8400.000 498.684

8420.000 499.198

8440.000 499.711

8460.000 500.025

8480.000 500.285

8500.000 500.546

8520.000 500.774

AV16

D=300 MM DI K-7
8540.000 500.978

8560.000 501.150

Q-16.412 l/s
8580.000 501.263

hf- 0.197m/km
8600.000 501.375

8620.000 501.483

8640.000 501.481

8660.000 501.479

8680.000 501.477

8700.000 501.475

8720.000 501.494

8740.000 501.334

8760.000 501.205

GL-501.50 m
8780.000 501.109

8800.000 501.106

8820.000 501.103

HGL-534.01
8840.000 501.097

8860.000 501.088

8880.000 501.120

8900.000 501.216

8920.000 501.181

8940.000 501.159

8960.000 501.162

8980.000 501.174

9000.000 501.187

9020.000 501.199

AV17
9040.000 501.211

9060.000 501.315

9080.000 501.312

9100.000 501.241

9120.000 501.171

9140.000 501.424

9160.000 501.782

9180.000 502.092

9200.000 502.404

9220.000 502.786

9240.000 503.168

9260.000 503.549

9280.000 503.921

9300.000 504.276

9320.000 504.631

9340.000 504.979

9360.000 505.305

9380.000 505.630

9400.000 505.950

9420.000 506.259

9440.000 506.568

9460.000 506.911

9480.000 507.295

9500.000 507.717

9520.000 508.144

AV18
9540.000 508.320

9560.000 508.497

9580.000 508.812

9600.000 509.127
00

9620.000 509.433
.00
0

9640.000 509.712

9660.000 509.991
GL

9680.000 510.114
51
1

9700.000 510.210
.53

9720.000 510.186
1

Q-14.838 l/s

D=300 MM DI K-7
9740.000 510.149
MBR - 2

hf- 0.164m/km
9760.000 510.112

9780.000 510.211
FSL-541.467

9800.000 510.379
D=L=1

9820.000 510.670
0
30 ,30

9840.000 511.094
m
LSL 536.484

9860.000 511.519
m
0. 7 m

9880.000 511.740
DI

9900.000 511.861

9920.000 511.982
K-
7

9940.000 512.103

9960.000 512.274
TO
D=

9980.000 512.417
SA
90

10000.000 512.559
LW
.0

10020.000 512.686
AD
mm

10040.000 512.759
GA
ON

10060.000 512.832
HD

AV19 SV6
ES

10080.000 512.906
R
PE

13
10100.000 512.979 00
.0
10120.000 513.130
00
10140.000 513.305 G
L-
10160.000 513.471 50
3.
10180.000 513.429
04
m
10200.000 513.386

10220.000 513.156
L=

10240.000 512.783

10260.000 512.410

10280.000 512.090
GL-503.04 m

10300.000 511.916
D= 1,091

10320.000 511.728
.0 m
3 00 m

10340.000 511.484
m

10360.000 510.977
DI

10380.000 510.475

10400.000 510.258

10420.000 510.042
K-7

10440.000 509.825

10460.000 509.501

10480.000 508.671

10500.000 507.953

10520.000 507.911

AV20
10540.000 507.885

10560.000 507.698 39
8.3
10580.000 507.540 49
GL
10600.000 507.409
D=9
0 0.0
10620.000 507.337
.00 mm
00 TO
24 HDP
10640.000 507.255
SAL E
WAD
10660.000 506.988
GA O
NE

GL-507.25 m
SR
10680.000 506.606 2 PRO
.

HGL-533.69
10700.000 506.223

10720.000 505.841

10740.000 505.189
GL 498.339

10760.000 504.447

10780.000 503.791

10800.000 503.301

10820.000 502.810

10840.000 502.446

10860.000 502.209

D= 300 MM DI K-7
Q-14.838 l/s
10880.000 501.972

hf- 0.164m/km
10900.000 501.727

10920.000 501.272

10940.000 500.817

10960.000 500.556

GL-500.25 m
10980.000 500.358

11000.000 500.030

11020.000 499.464

AV21
11040.000 499.125

11060.000 498.935

11080.000 498.749

HGL-533.64
11100.000 498.652

11120.000 498.556

11140.000 498.459

11160.000 498.126

11180.000 497.787

11200.000 497.449

11220.000 497.111

11240.000 496.773

11260.000 496.328

11280.000 495.768

11300.000 495.208

11320.000 494.719

11340.000 494.889

SCV4

D= 300 MM DI K-7
11360.000 495.124

11380.000 495.323
D=300

Q-12.951 l/s
11400.000 495.207

hf- 0.127m/km
11420.000 495.092

11440.000 495.020
8m

11460.000 495.032

11480.000 495.045

11500.000 495.057

11520.000 495.069

AV22
L=3,04.0 mm DI K

11540.000 495.081
-7

11560.000 494.819

11580.000 494.539

11600.000 494.345

11620.000 494.357

11640.000 494.819

GL-494.35 m
11660.000 494.539

11680.000 494.357

11700.000 494.576

11720.000 495.399

HGL-533.56
11740.000 495.839

11760.000 496.277

11780.000 496.721

11800.000 497.353

11820.000 497.985

11840.000 498.610

11860.000 499.188

11880.000 499.288

11900.000 499.387

11920.000 499.376

11940.000 499.351

11960.000 499.129

11980.000 499.140

12000.000 499.476

12020.000 499.811

12040.000 500.134

12060.000 500.369

SV7 AV23
12080.000 500.605

12100.000 500.840

12120.000 501.094

12140.000 501.367

12160.000 501.538

12180.000 501.590

12200.000 501.642

12220.000 501.786

12240.000 501.948

12260.000 502.110

12280.000 502.406

12300.000 502.812

Q-8.299 l/s
12320.000 503.217

hf- 0.136m/km
12340.000 503.559

D= 250 MM DI K-7
12360.000 503.893
GL-504.38 m

12380.000 504.227
GL-504.38 m

12400.000 504.524

12420.000 504.561

12440.000 504.598
TO

12460.000 504.635
MA
5440.000
D=

12480.000 504.672
LEG
90.

12500.000 504.781
0
AO

12520.000 504.893
N

AV24
12540.000 505.006
mm

NE

12560.000 505.079
ES
HD

12580.000 505.135
PE

12600.000 505.167

12620.000 505.133

12640.000 505.098

12660.000 505.063

12680.000 505.057

12700.000 505.078

12720.000 505.099

12740.000 505.120

12760.000 505.253

12780.000 505.391

12800.000 505.478

12820.000 505.502

12840.000 505.526

12860.000 505.550

12880.000 505.588

12900.000 505.673

12920.000 505.758

12940.000 504.843

12960.000 503.909

12980.000 502.863

13000.000 500.816

13020.000 500.668

13040.000 501.501
=

13060.000 502.583
D=

AV25 SCV5
13080.000 503.691
3

GL-500.87 m
13100.000 504.954

HGL-533.37
L 00.
99

13120.000 505.221

13140.000 506.423

13160.000 506.550

13180.000 506.677
2,7 0 mm

13200.000 506.798

13220.000 506.918
m DI K

13240.000 507.140

13260.000 507.518
-7

13280.000 507.971

13300.000 508.313

13320.000 508.655

13340.000 508.934

13360.000 509.157

13380.000 509.168

13400.000 509.034

13420.000 508.942

13440.000 509.239

13460.000 509.537

13480.000 509.831

13500.000 510.065

13520.000 510.021

AV26
13540.000 509.977

13560.000 510.102

13580.000 510.226

13600.000 510.373

13620.000 510.500

13640.000 510.649

13660.000 510.798

13680.000 510.807

13700.000 510.808

13720.000 510.980

13740.000 511.250

13760.000 511.520

13780.000 511.955

13800.000 512.580

13820.000 513.206

13840.000 514.078

13860.000 515.141

13880.000 516.204

13900.000 517.268

13920.000 517.752

13940.000 517.319

13960.000 516.887
SCV6

13980.000 517.823
82

14000.000 518.801
40
GL-497.05 m
.00

14020.000 519.569
AV27
0

TO THAKUR NIM

14040.000 520.022

14060.000 520.468
SV8

14080.000 521.055
GL

14100.000 521.767
-49

D=90.0 mm HDPE

D=
7.0

14120.000 522.308
5

30
m

14140.000 522.434
GAON ESR-2 874

14160.000 522.559
L= 0.0 m
0.0

47
00

14180.000 522.685
0mmD
I
14200.000 522.651
TO
D=

14220.000 522.427
K-7
WA
9
GL

14240.000 522.203
DG
-5

0.0
A
01

14260.000 521.961
m
ON
.46

14280.000 521.386
TO THAKUR NIM

ES
4m

14300.000 520.811
R-
HD
1
P

14320.000 520.562
E

14340.000 520.342
D=90.0 mm HDPE

15

14360.000 520.122
D= 250 MM DI K-9
GAON ESR-1

64
GL-501.464 m

14380.000 519.920
0.0
GL- 513.062 m

14400.000 519.778
00

14420.000 519.635
GL

14440.000 519.567
-5

14460.000 519.641
13

14480.000 519.714
D
.06

14500.000 519.850
2m

L= =3
14520.000 520.109
AV28

1, 00
14540.000 520.369
93 .0
14560.000 520.573
0 m
14580.000 520.680
m m
14600.000 520.787
DI
14620.000 520.929

14640.000 521.173
K-
7
14660.000 521.417

14680.000 521.661
TO
W

14700.000 521.886
L=682 m
AD
D

14720.000 522.340
=9

AO

14740.000 522.808
0.

N
0

ES

14760.000 523.246
m

R
2
m

14780.000 523.308
Q-5.162 l/s
H

D=250.0 mm DI K-7
PR
D

14800.000 523.241
O
.
PE

14820.000 523.015
hf- 0.056m/km
D=

14840.000 522.790
25

14860.000 522.561
0.

14880.000 521.989

14900.000 521.850
=
0m

14920.000 521.710
L m

14940.000 521.469

14960.000 521.171
34 DI

14980.000 520.874 10
64
15000.000 520.631
L=2,620 m

0.
7 mK-7

00
15020.000 520.408 0
AV29

15040.000 520.185 G
L-
15060.000 519.962
50
7.
15080.000 519.739
25
m
15100.000 518.968
D=250.0 mm DI K-7

15120.000 518.192
L=349 m

15140.000 518.082

15160.000 517.974
D=300.0 mm DI K-7

15180.000 517.873
GL- 524.00 m
GL-507.25 m

15200.000 517.773
10
98
15220.000 517.672
0
L=

.0
13

00
15240.000 517.398
02
0.0

15260.000 517.015 G
00

L-
15280.000 516.632
50
50.0

0.
15300.000 516.386
25
m
GL

15320.000 516.317
D=21,640 m
-

mm

15340.000 516.248
50
0.8

15360.000 516.179
D
7m

15380.000 516.111
TO
D=
9

15400.000 515.948
HA
0.
S

GL-500.25 m

15420.000 515.741
I K-7
NA
0m

15440.000 515.506
PU
m
R

15460.000 515.223
GL- 500.87 m
EX
HD

15480.000 515.016
P
ES
E

15500.000 514.758
R -1

15520.000 514.500
AV30
L=635 m

15540.000 514.233
11
15560.000 513.912 62
0.
15580.000 513.619 00
0
15600.000 513.545

15620.000 513.356
G

L=193 m
L-

15640.000 513.062
49
4.

15660.000 513.187
35
m
D=300.0 mm DI K-7

15680.000 513.117
GL-513.10 m
GL-527.68 m

15700.000 512.862
D=200.0 mm DI K-7

18440.00
15720.000 512.683
0
L=1,397 m

GL-527
.68 m
L=69 m

15740.000 512.489
D=200.0 mm DI K-7

HGL-533.22
GL-494.35 m

15760.000 512.454
SCV7

15780.000 512.443
18

15800.000 512.583
44
0

15820.000 512.085
.0
00
D=250.0 mm DI K-7

15840.000 513.163
G

15860.000 513.329
L-
52

15880.000 513.450
7.

15900.000 513.436
68
m

15920.000 513.489

15940.000 513.428

15960.000 513.811

15980.000 514.309

16000.000 514.761
GL-530.06 m
THATE SUMP

16020.000 515.138
AV31
GL-527.95 m

16040.000 515.476
D=250 MM DI K-7
Q-3.426 l/s

SV9

16060.000 515.664
hf- 0.026m/km

16080.000 515.853

16100.000 515.941

16120.000 515.983

16140.000 516.024

16160.000 516.058

16180.000 516.090

16200.000 516.313

16220.000 516.706

16240.000 517.100

16260.000 517.657

16280.000 518.237

16300.000 518.646
L SECTION FROM MBR 2 TO THATE SUMP

16320.000 518.944

16340.000 519.007

16360.000 519.679
GL-519.00 m

16380.000 520.036

16400.000 520.358

16420.000 520.705
HGL-533.20

16440.000 521.177

16460.000 521.743

16480.000 522.347

16500.000 522.770

16520.000 522.874
AV32

16540.000 522.747
Q-2.87 l/s

16560.000 522.648
D= 250 MM DI K-7

16580.000 522.761
hf- 0.019m/km

16600.000 522.873

16620.000 523.332

16640.000 523.586

16660.000 523.640

16680.000 524.005

16700.000 523.065

16720.000 522.474
GL-524.00 m

16740.000 522.049

16760.000 521.689

16780.000 521.329
HGL-533.19

16800.000 520.940

16820.000 520.546

16840.000 520.218

16860.000 519.898

16880.000 519.598

16900.000 519.318

16920.000 519.076

16940.000 518.791

16960.000 518.506

16980.000 518.093

17000.000 517.788

17020.000 517.857
AV33

17040.000 517.809

17060.000 517.732

17080.000 517.650

17100.000 517.603

17120.000 517.512

17140.000 517.363

17160.000 517.027

17180.000 517.067

17200.000 517.357

17220.000 517.550

17240.000 516.867
DI PIPE

17260.000 516.567
LENGTH
SCV8

17280.000 517.302
AIR VALVE
AIR VALUE

HDPE PIPE

17300.000 517.466

17320.000 517.473
DETAILS
SLUICE VALUE
LEGEND

SCOUR VALUE

17340.000 517.523
GROUND LEVEL
PROPOSED PIPE

17360.000 517.430

17380.000 517.267

17400.000 517.302

17420.000 517.515
Q-2.87 l/s

17440.000 517.491
DIA DI K7
18600 M

90 MM DIA

17460.000 517.500
hf- 0.019m/km

17480.000 517.531
TOTAL-9 NOS.

17500.000 517.562
TOTAL-10 NOS.

17520.000 517.644
AV34

17540.000 517.879
100MM DIA.-5NOS
250MM DIA.-4NOS
300, 250 & 200 MM

SCOUR VALVE 150MM DIA.-4 NOS


SLUICE VALVE 300MM DIA.-6 NOS
80MM DIA.-36 NOS

17560.000 518.114

17580.000 518.379

17600.000 518.674
D=250 MM DI K-9

17620.000 518.797

17640.000 518.863

17660.000 518.930

17680.000 519.070

17700.000 519.407

17720.000 519.744
SCALE:

17740.000 520.111
CLIENT:

Z:\WaterSupply\48 Villages Amrapur MH\R1\Compony LOGO.jpeg

17760.000 520.489

17780.000 520.898

17800.000 521.363

17820.000 521.696

17840.000 521.749

17860.000 521.816

17880.000 521.981

17900.000 522.145

17920.000 522.297

17940.000 522.545
CHECKED BY :- ENGINEER
SECTIONAL

17960.000 522.978

17980.000 523.411

18000.000 523.725

18020.000 523.966
AV35

18040.000 524.254

18060.000 524.629

18080.000 524.984
TAL:- SHEVGAON

18100.000 525.248
SV10

18120.000 525.226
ENGINEER

18140.000 525.284
SUB DIVISION

18160.000 525.342

18180.000 525.414

18200.000 525.508

18220.000 525.603

18240.000 525.711

18260.000 525.860

18280.000 526.008
DRAWN BY: SRUSHTI.A DATE:03-04-2022

18300.000 526.007
ENGINEER
EXECUTIVE

18320.000 525.976
DRAWING TITLE : L SECTION FOR THATE SUMP

18340.000 525.777
SCV9

18360.000 526.116
MAHARASHTRA JEEVAN PRADHIKARAN

18800.000 526.454

18400.000 526.793
DIST:-AHMEDNAGAR

18420.000 527.091

18440.000 527.681
REGIONAL RURAL WATER SUPPLY SCHEME

18460.000 527.546
DWG NO:
AV36

18480.000 527.587
250 MM
HGL 533.15

ENGINEER

18500.000 527.958
AMRAPUR-MALI BABHULGAON & OTHER 49 VILLAGES

18520.000 528.391

18540.000 529.154
SUPERINTENDING
GL-527.95 m

18560.000 529.517
200 MM

18580.000 530.062
Q-2.87 l/s

GL-530.06 m
hf- 0.056m/km

18600.000530.833
THATE SUMP
HGL 533.15
(m)
(m)

(m)
Chainage

PIPE DIA
Datum: 486.0
MBR - 2
FSL-541.467

Existing Ground Level


488
490
492
494
496
498
500
502
504
506
508
510
512
514
516
518
520
522
524
526
528
530
532
534
536
538
540
0.000 511.531

20.000 511.295

SCALE :- HOR 1:2000,VER. 1:200


40.000 510.969

60.000 510.495

SV1
80.000 510.022

100.000 509.548

120.000 509.455

LSL 536.484
140.000 509.458

160.000 509.085

180.000 508.640

200.000 508.501

220.000 508.445

240.000 508.306

260.000 507.962

280.000 507.802

300.000 507.765

320.000 507.624

340.000 507.389

360.000 506.703

380.000 506.018

400.000 505.717

420.000 505.466

440.000 504.959

460.000 504.403

480.000 504.111

500.000 503.854

AV1
520.000 503.603

540.000 503.353

560.000 503.031

580.000 502.686

600.000 502.387

620.000 502.259

640.000 502.084

660.000 501.847

680.000 501.601

700.000 501.310

D= 300 MM DI K -7
Q-22.813 l/s
720.000 501.049

hf- 0.363m/km
740.000 500.884

760.000 500.718

780.000 500.428

800.000 500.213

820.000 499.999

840.000 499.912

860.000 500.075

SCV1
880.000 500.238

900.000 500.401

920.000 500.571

940.000 500.759

960.000 500.948

980.000 501.109

1000.000 501.225

1020.000 501.456

AV2
1040.000 501.687

1060.000 501.918

1080.000 502.421

1100.000 503.046

1120.000 503.347

1140.000 503.550

1160.000 503.747

1180.000 503.930

1200.000 504.113

1220.000 503.961

1240.000 503.810

1260.000 503.707

1280.000 503.275

1300.000 503.041

1320.000 502.621

1340.000 502.137

GL-503.04 m
1360.000 501.774

1380.000 501.787

1400.000 501.574

HGL-536.01
1420.000 501.226

1440.000 500.878
00

1460.000 500.653
.00
0

1480.000 500.556
GL

1500.000 500.459
51
1

1520.000 500.363

AV3
.53
1

1540.000 500.154
MBR - 2

1560.000 499.951
FSL-541.467

1580.000 499.749
D=L=1

1600.000 499.543
30 ,30
m
LSL 536.484

1620.000 498.927
m
0. 7 m

1640.000 498.407
DI

1660.000 498.236
K-
7

1680.000 497.890
TO
D=

1700.000 497.605
SA
90

LW
.0

1720.000 497.458
AD
mm

1740.000 497.312
GA
ON
HD

1760.000 497.248
ES
R
PE

13
1780.000 497.297 00
.0
00
1800.000 497.347
G
L-
1820.000 497.397 50
3.
04
1840.000 497.482 m

Q-21.215 l/s
1860.000 497.572
L=

hf- 0.317m/km
1880.000 497.660

1900.000 497.736

D = 300 MM DI K -7
GL-503.04 m

D= 1,091

1920.000 497.820
.0 m
3 00 m

1940.000 498.092
m

1960.000 498.365
DI

1980.000 498.484
K-7

2000.000 498.366

2020.000 498.248

2040.000 498.129

2060.000 498.078

AV4 SV2
2080.000 498.291
39
8.3
2100.000 498.504
49
GL D=9
0 0.0
2120.000 498.717 .00 mm
00 TO
24 SAL HDP
2140.000 498.930 WAD E
GA O
NE
SR
2160.000 499.138 2 PRO
.
2180.000 498.795

2200.000 498.470
GL 498.339

2220.000 498.185

2240.000 498.250

2260.000 498.552

2280.000 498.823

2300.000 498.866

2320.000 498.456

2340.000 498.223

2360.000 498.311

2380.000 498.426

2400.000 498.339

2420.000 497.702

2440.000 497.584

GL-498.35 m
2460.000 497.517

2480.000 497.625

2500.000 497.734

HGL- 535.66
2520.000 497.834

AV5
2540.000 497.930

2560.000 498.025

2580.000 498.119

2600.000 498.213

2620.000 498.307
D=300

2640.000 498.401

2660.000 498.498
8m

2680.000 498.612

2700.000 499.659

2720.000 500.851
L=3,04.0 mm DI K
-7

2740.000 500.890

2760.000 500.770

2780.000 500.707

2800.000 500.769

2820.000 500.830

2840.000 500.888

2860.000 500.985

2880.000 501.097

2900.000 501.209

2920.000 501.321

2940.000 501.071

2960.000 501.134

2980.000 500.985

3000.000 500.879

AV6
3020.000 501.183

3040.000 501.486

3060.000 501.548

3080.000 501.510

3100.000 501.422

3120.000 501.305

3140.000 501.188

3160.000 501.072

3180.000 500.955

3200.000 501.319

3220.000 501.514

3240.000 500.767

3260.000 501.264
GL-504.38 m

3280.000 501.921
GL-504.38 m

3300.000 502.575
TO

3320.000 502.821
MA
5440.000

3340.000 503.079
D=

LEG
90.

3360.000 503.336
0
AO
N

3380.000 503.594
mm

NE
ES

3400.000 503.827
HD

3420.000 504.038
PE

3440.000 504.209

3460.000 504.355

3480.000 504.501

3500.000 504.646

AV7
3520.000 504.815

3540.000 505.120

3560.000 505.423

3580.000 505.669

3600.000 505.906

3620.000 506.142

3640.000 506.379

3660.000 506.620

3680.000 506.835

3700.000 507.024

3720.000 507.213
=
D=

3740.000 507.463
3

3760.000 507.798
L 00.
99

3780.000 508.132
Q-20.417 l/s

3800.000 508.466
hf- 0.295m/km
2,7 0 mm

3820.000 508.800

3840.000 509.134
m DI K
-7

3860.000 509.270

3880.000 509.378

3900.000 509.486

3920.000 509.588

3940.000 509.674

3960.000 509.760

D =300 MM DI K 7
SV3

3980.000 509.722

4000.000 509.655

4020.000 509.589

4040.000 509.574

4060.000 509.861

4080.000 510.105

4100.000 510.303

4120.000 510.502
AV8

4140.000 510.645

4160.000 510.754

4180.000 510.863

4200.000 511.033

4220.000 511.722

4240.000 512.411

4260.000 513.088

4280.000 513.231

4300.000 513.369

4320.000 513.605
82

4340.000 513.852
40
GL-497.05 m
.00

4360.000 514.109
0

TO THAKUR NIM

4380.000 514.498
GL

4400.000 514.886
-49

D=90.0 mm HDPE

4420.000 515.286
D=
7.0
5

30
m

4440.000 515.688
GAON ESR-2 874

L= 0.0 m
0.0

47
4460.000 516.087
00

0mmD
I
TO

4480.000 516.486
D=

K-7
WA
9
GL

4500.000 516.699
DG
-5

0.0
A
01

AV9

4520.000 516.708
ON
.46

m
TO THAKUR NIM

ES
4m

4540.000 516.730
R-
HD
1
P

4560.000 516.977
E
D=90.0 mm HDPE

15

4580.000 517.194
GAON ESR-1

64
GL-501.464 m

0.0
GL- 513.062 m

4600.000 517.141
00

4620.000 517.088
GL

4640.000 516.952
-5
13

4660.000 516.763
D
.06
2m

4680.000 516.576
L= =3
1, 00
4700.000 516.464
93 .0
0 m
4720.000 516.351
m m
4740.000 516.239
DI
4760.000 515.853
K-
7
4780.000 515.382
TO

4800.000 514.940
W

L=682 m
AD
D

4820.000 514.487
=9

AO
0.

N
0

4840.000 514.034
ES
m

R
2
m

4860.000 513.520
H

D=250.0 mm DI K-7
PR
D

O
.

4880.000 512.754
PE

D=

4900.000 512.381
25
0.

4920.000 512.234
=

4940.000 511.568
0m
L m

4960.000 510.729
34 DI

4980.000 510.094
10
64
5000.000 509.595
L=2,620 m

0.
7 mK-7

00
0
5020.000 508.693
G
AV10

L-
5040.000 508.091 50
7.
25
5060.000 507.706 m
D=250.0 mm DI K-7

5080.000 506.241
L=349 m

5100.000 506.108
D=300.0 mm DI K-7

5120.000 505.976
GL- 524.00 m
GL-507.25 m

10
5140.000 505.921
98
0
L=

.0
13

00
02

5160.000 505.795
0.0

G
5180.000 505.771
00

L-
50
50.0

0.
25
5200.000 505.747
m
GL

D=21,640 m
-

5220.000 505.861
mm
50
0.8

5240.000 505.996
D
7m
TO
D=
9

5260.000 506.118
HA
0.
S

GL-500.25 m

I K-7

5280.000 506.064
NA
0m
PU
m
R

5300.000 506.011
GL- 500.87 m
EX
HD

5320.000 505.957
P
ES
E
R -1

5340.000 505.936
L=635 m

5360.000 505.809 11
62
5380.000 505.635
0.
00
0
5400.000 505.275
G

L=193 m
L-

5420.000 504.912
49
4.
35

5440.000 504.382
m
D=300.0 mm DI K-7

GL-527.68 m

5460.000 504.225
D=200.0 mm DI K-7

18440.00
0
L=1,397 m

GL-527
5480.000 504.125 .68 m
L=69 m
D=200.0 mm DI K-7

GL-504.38 m
GL-494.35 m

5500.000 503.859

5520.000 503.536
AV11
18
44
0

5540.000 503.205
.0
00

HGL-534.76
D=250.0 mm DI K-7

5560.000 502.872
G
L-
52

5580.000 502.539
7.
68

5600.000 502.199
m

5620.000 501.537

5640.000 500.788

5660.000 500.038
GL-530.06 m
THATE SUMP

GL-527.95 m

5680.000 499.380

5700.000 499.182

5720.000 498.985

5740.000 498.810

5760.000 498.676

5780.000 498.542

5800.000 498.407

5820.000 498.253

5840.000 498.083

5860.000 497.914

5880.000 498.007

5900.000 498.168

5920.000 498.516

5940.000 498.864
SV4

5960.000 499.301

5980.000 499.814
L SECTION FROM MBR 2 TO THATE SUMP

6000.000 500.327
AV12

6020.000 500.839

6040.000 501.400

6060.000 501.968

6080.000 502.537

6100.000 502.903

6120.000 503.017

6140.000 502.753

6160.000 502.489

6180.000 501.912

6200.000 501.067
DI PIPE
LENGTH

6220.000 500.222

6240.000 499.604
AIR VALVE
AIR VALUE

6260.000 499.397
HDPE PIPE

6280.000 499.190
DETAILS

6300.000 498.983
SLUICE VALUE
LEGEND

SCOUR VALUE

6320.000 498.542
GROUND LEVEL
PROPOSED PIPE

6340.000 498.094

6360.000 497.646

6380.000 497.199

6400.000 496.762

6420.000 496.704
10 NOS

SLUICE VALVE 34 NOS

6440.000 496.661

6460.000 496.617
18600 M

6480.000 496.574

6500.000 496.530

6520.000 496.899
SCV2

6540.000 497.319

6560.000 497.740

6580.000 498.013
200 MM DIA DI K7

6600.000 498.095

6620.000 498.193
110 MM & 90 MM DIA

6640.000 498.344

6660.000 498.495

6680.000 498.711

6700.000 498.951

6720.000 499.128

6740.000 499.254

6760.000 499.379
SCALE:

6780.000 499.450
CLIENT:

Z:\WaterSupply\48 Villages Amrapur MH\R1\Compony LOGO.jpeg

6800.000 499.423

6820.000 499.396

6840.000 499.345

6860.000 498.999

6880.000 498.652
D=300.0 mm DI K-7

6900.000 498.306

6920.000 497.945
CHECKED BY :- ENGINEER
SECTIONAL

6940.000 497.358

6960.000 496.772

6980.000 496.284

7000.000 496.038
Q-18.044 l/s

7020.000 495.759
TAL:- SHEVGAON
hf- 0.235m/km

AV13

7040.000 495.480
ENGINEER
SUB DIVISION

7060.000 495.221

7080.000 495.148

7100.000 495.075

7120.000 494.625

7140.000 494.128
DRAWN BY: SRUSHTI.A DATE:03-04-2022

7160.000 493.571
ENGINEER
EXECUTIVE
DRAWING TITLE : L SECTION FOR THATE SUMP

7180.000 492.975

7200.000 492.372
MAHARASHTRA JEEVAN PRADHIKARAN

7220.000 492.086
DIST:-AHMEDNAGAR

7240.000 491.808
REGIONAL RURAL WATER SUPPLY SCHEME

7260.000 491.538
DWG NO:

7280.000 491.269
ENGINEER
AMRAPUR-MALI BABHULGAON & OTHER 49 VILLAGES

7300.000 490.999
SUPERINTENDING

7320.000 491.178

7340.000 490.818

7360.000 490.238

7380.000 489.664

7400.000 489.382

7420.000 489.108
N

KEY PLAN FOR AMRAPUR-MALI BABHULGAON AND OTHER 49 VILLAGES E

PRO
APPROACH
CHANNEL

PROPOSED
JACKWELL w
9 M DIA PUMP HOUSE
GL=426.910 FLOOR RL=465.410

KHUNTEFAL
ESR 2
FSL 493.49
LWL 489.88 GHOTAN
GL 479.95
VILLAGE KHUNTEFAL

KHUNTEFAL ESR -2 FSL 499.50

ZONE-1 ESR 2
GADEWADI

PE
LWL 496.50 ESR 1

HD
GHOTHAN ESR-2
GHOTAN EX ESR -1 ESR-2

mm
0.0 m
11 71
FSL 499.10

D= =1,0 6
L P-4
GL 499.50 GADEWADI PROP ESR 2
KHUNTEFAL PROP ESR 3 FSL 498.33
LWL 494.84
FSL 487.85 P-52
88
m HDPE ESR 3 LWL 494.84 FSL 479.67
2610 mm
P-5293 L=30 m
L=1, 0.
GHOTAN ESR 2

LWL 476.67
D=110.0 mm HDPE LWL 484.24 D=9 GL 486.05
P-14
L=488 m J-4338
P-74 L=91 m VILLAGE GHOTAN
GHOTAN ESR 1
GL 486.05
J-4254 VILLAGE KHUNTEFAL

D=90.0 mm HDPE P-73 L=20 m


HDPE FSL-476.45 m J-4264 GL 454.67
FSL-473.77 m D=110.0 mm J-4314 FSL-483.73 m D=110.0 mm HDPE
P-5295 L=19 m GL 474.31 FSL-484.15 m
D=90.0 mm HDPE KHUNTEFAL ESR -1
P-72 ESR 3

P-51,9
ESR 1

L=
D=15
L=44 m GHOTAN PROP ESR 3

28932 m
D=110.0 mm HDPE

0.0 mm
FSL 505.00

TALANI
m
RAOTALE

DI-K7
LWL 502.00

P-5 ,94
38 K-7 D

L=
=9
3,4 DI

29 0 m
1
0.0

2
L=
4 mm m
27 .0 ROATALE ESR m
H
P-5=350 D
PE
D GL 487.00

DI K-7
D=200.0 mm
L=2,830 m
ESR 1 FSL488.43

K-7
P-45
MBR-1

DI
TALANI ESR 1
LWL 486.02

.0 mm
8m
P-28 L=256 m

P-5276
FSL 500.75 P-3 L=18 m
ESR 2

L=3,12
D=110.0 mm HDPE J-4344

D=300
FSL 513.455 D=110.0 mm HDPE
FSL-479.12 m TO
PRABHU
WADGAON

LWL 496.44 TALANI PROP ESR 2


P-5282 L=14 m GL 472.17

TO KHANAPUR
FSL 507.94 VILLAGE KURUDGAON - ROATALE

P-5281

TALANI ESR 1 LWL 503.94 ESR 2 D=90.0 mm HDPE L=126 m


J-4284
P-61 FSL 472.50
GL 486.73 J-4330
VILLAGE TALANI
KURUDGAON ESR -2 PROP FSL 490.85 FSL-476.78 m L=2632
m
E LWL 468.79
GADEWADI ESR

LWL 508.462 FSL-489.13 m mm HDP

NAJIK BABHULGAON

D=110.0 mm HDPE
VILLAGE GADEWADI

J-4233 D=110.0

P-29 L=449 m
FSL-489.27 m P-5
D L=45 27
TALANI ESR 2

GL 489.94 LWL 487.85


P-5273 =11 5 m 5 TO KURUDGAON

0.0
L=90 m
D=300.0 mm DI K-7
mm
HD
SUMP GL 477.85 GL 457.47
GADEWADI ESR-1
P-527
2
25 m
P E TALANI PROP SUMP
FSL-488.94 m ESR 1 P-5280
m FSL 486.80 ESR-1
L=3,2 mm DI K-7 L=4,165 K-7
FSL 504.01 mm DI
VILLAGE KURUDGAON - ROATALE

D=200.0

TO RAKSHI
D=35
0.0 LWL 482.42
LWL 500.54
J-4272 GL 472.56
ESR 1

TO TAJANAPUR
GL 493.364 FSL-486.28 m
P-5277 L=823 m
J-4332
GL 490.05

EXISTING
PUMP
HOUSE
STAFF
QUARTER
FSL-485.75 m D=300.0 mm
DI K-7

P-22 L=85 m
D=110.0 mm HDPE
VILLAGE NAJIK BABHULGAON

NAJIK BABHULGAON ESR 1


KURUDGAON
SHEVGAON
SUMP

HDPE
WTP METER
ROOM
ESR 2

mm
WTP

m
NAJIK BABHULGAON PROP ESR 2

L=1,652
P-5279

D=140.0
FSL 519.50
LWL 516.50

ESR 2
LOLEGAON NAJIK BABHULGAON ESR 2

GL 501.50
NAJIK BABHULGAON PROP SUMP
SAMANGAON ESR 2 PROP
LOLEGAON ESR
ESR SUMP FSL-500.50 m

FSL 493.66 FSL 490.86


LWL 490.66 LWL 487.41

SAMANGAON ESR 2 GL 478.66 GL 477.11


LOLEGAON ESR

VILLAGE LOLEGAON

WADULE BK
AKHEGAON
MSRTC BUS STAND SHEVGAON

FSL-493.66 m TO
NEWASA

KRANTI CHOWK

HDPE
J-4365
AMBEDKAR CHOWK
ROAD

FSL-491.15 m
MIRI

HDPE
ROAD
MIRI

P-5317
m
MBR-2

D=90.0 mm
MIRI ROAD

L=1,447
P-5 ,92 m
L= 150

31 2 m m D
D=
MIRI ROAD

ESR 1

1 .0

8
GADGEBABA STATUE
AKHEGAON

P-5320
ROAD

MIRI ROAD

ROAD
PATHARDI-SHEVGAON
TO JOHARAPUR
WADULE BK ESR -1 m
MIRI ROAD

L=4,218 K-7
RIVER

FSL 479.29 mm DI

RIVER
DHORA
MIRI ROAD

D=150.0

IK
RIVER
VILLAGE WADULE BK
DHORA

-7
P-58 L=19 m MIRI ROAD

RIVER
D=150.0 mm DI K-7 LWL 476.29 P-5
L= 31
FSL 541.467
3,6 9
D= 01
J-4363 15 m
P-5316L=310 m J-4280 WADULE BK ESR 1
0.0

ROAD
PATHARDI-SHEVGAON
D=150.0 mm DI K-7 FSL-475.82 m P-59 GL 464.28 mm

THAKUR NIMGAON
MIRI ROAD

P-20 L=60 m

NALA
VILLAGE WADULE BK

J-4250 VILLAGE SAMANGAON MIRI ROAD

DI

MALEGAON NE
WADULE BK ESR 2

FSL-478.13 m L=2,408 m FSL 478.03 K-7 LWL 536.484

NALA
D=90.0 mm HDPE
D=150.0 mm DI K-7
SAMANGAON ESR 1
TO MIRI

P-12 L=44 m

TO AMRAPUR
FSL 485.84 P-26
D=90.0 mm HDPE L=222 m LWL 474.45
D=90.0 mm HDPE
LWL 481.70 FSL 508.63
ESR 1 P-24 L=171 m
GL 463.64 ESR 2 MALEGAON NE ESR 1 PROP D=90.0 mm HDPE LWL 505.72
ESR 1
GL 472.23 ESR 2 SALWADGAON ESR 2 PROP
FSL 520.26 1
P-7 9 m DI K
-7 THAKUR NIMGAON ESR-1

ROAD
HEVGAON
THAKUR NIMGAON ESR 1

PATHARDI-S
m
ESR 1 WADULE BK ESR -2 FSL 524.95
LWL 515.84
2,79 m
L= 00.0
J-4276 VILLAGE THAKUR NIMGAON

GL 495.77

D=3
D=3

P-5470 m I K-7
L=
SAMANGAON ESR GL 511.037 P-5299
MBR 2 AT AKHEGAON ROAD

LWL 521.95

00
L=23 m

27
.0
D=90.0 mm HDPE

3
mm
MBR 2 (AHEGAON ROAD) GL 509.95 FSL-524.95 m GL 506.234 VILLAGE MALEGAON NE
MALEGAON -NE ESR 2 FSL 510.47 THAKUR NIMGAON ESR 2

D
J-4266 J-4331
MALEGAON -NE ESR 1
LWL 507.47
P-5296 L=46 m FSL 519.23 P-5275 L=131 m
ESR 1
HASNAPUR
D=90.0 mm HDPE D=90.0 mm HDPE
P-5297 LWL 516.23
D= L=1 P SALWADGAON ESR L=9 m GL 495.47
30 ,30 -57

D=90.0 mm HDPE
0.0 7
m m
FSL 519.43
D=90.0 mm HDPE
GL 506.23 ESR 2
SAMANGAON

ROAD
m THAKUR NIMGAON ESR-2 PROP

EVGAON
P-39
ESR 2

PATHARDI-SH
DI

L=1,340 m
LWL 515.84

P-5295
L=3,167 m K-7
D=150.0 mm DI MALEGAON NE ESR 2
K-7 P-5293
J-4244 m K-7
SALWADGAON ESR 1
L=3,048 mm DI
VILLAGE SALWADGAON

GL 505.02 D=300.0

P-5 30 mm
ESR-1
BHAGUR

L= 300
D
P-9 L=30 m

30 m DI
1,9 .0
=

0
ROAD
HASNAPUR ESR EX

AON
D=90.0 mm HDPE

PATHARDI-SHEVG
P-5330 RIVER

P-5302 L=26 m

D=200.0
L=3,038 mm DI K-7
L=197 m

P-5289
FSL 488.60 FSL 507.93
RIVER

P-5 D=140.0 mm HDPE


D=110.0 mm HDPE 292

K
ESR 3
SALWADGAON

-7
L=
LWL 485.60
BHAGUR ESR
1,
D=3 091 m
J-4343
LWL 504.93 ESR-1

m
J-4375 00.0

ROAD
P-5331 L=9 m

SHEVGAON
P-53 KOLGAON ESR

PATHARDI-
VILLAGE BHAGUR

FSL 504.23 mm
J-4374
TO
WARUR

BK

D=90.0 mm HDPE D IK 01 HASNAPUR ESR

-7 J-4349
L=

WARUR BK
GL 475.60 LWL 500.47 D=3 33
5m VILLAGE HASNAPUR

GL 494.85 FSL 507.11


00.0
BHAGUR ESR

N ROAD
mm

PATHARDI-SHEVGAO
P-5
DI
K-7 30 LWL 503.60
WARUR BK ESR 3

D= L=6 3
J-4248 L=106 m P-23
GL 490.54

ZONE-2
FSL-488.16 m 30 4
0.0 9 m
VILLAGE WARUR BK

D=90.0 mm HDPE
J-4351

D=150.0 mm DI K-7
KOLGAON ESR
mm
P-11L=31 m
D=90.0 mm HDPE ESR 2 DI
K-7 P-5304
VILLAGE KOLGAON

GL 493.58
L=658 m J-4377
ESR-1
KHARADGAON PROP ESR 2 D=150.0 mm
DI K-7J-4274

MANGRUL

L=1,070 m
MANGRUL BK ESR EX

P-50
P-53 FSL 516.21 P-5332

NALA
FSL 505.63

NALA
L=3, 29

KH
L=87 m

ROAD
FSL 513.71

PATHARDI-SHEVGAON
KH

TO SULTANPUR

D=11 098 m D=150.0 mm DI K-7


0.0 LWL502.63 LWL 513.21 P-5
mm
HD FSL 497.94 J-4341 HASNAPUR ESR 2 PROP D= L=1,6
33 LWL 509.41
3 MANGRUL KH ESR
PE 15 1
291 0.0 9 m
FSL 496.48 LWL 484.26 GL 490.63 P-5 1m
GL 501.21 ESR-2 mm FSL 516.75

L= 00.0
WARUR KH ESR

ESR L=86 HDPE

D=
DI

91

NALA
K-7 GL 499.60
0.0 mm LWL 513.96

2
5
LWL 492.49 D=11
MANGRUL BK ESR

D=90.0 mm
L=1,556
P-5334 m
m mD
SULTANPUR ESR WARUR KH ESR

mm
FSL 519.00

D=11 2 m

NALA
WARUR BK ESR 1

SULTANPUR KH

40
FSL 496.69 GL 482.92

P-5 I K
P-5343 J-4239
VILLAGE MANGRUL BK

P-53

P-53
L=65
0.0
WARUR BK ESR 2

LWL 516.00 L=240 m L=52 11

29 -7
ESR-2
VILLAGE WARUR BK

P-7 L=20 m D=1

NALA
LWL 493.09 FSL 516.20 50.03 m J-4359 GL 504.12
GL 483.15

KHARADGAON

NALA
D=90.0 mm HDPE

AWHANE BK
mm

HDPE
VILLAGE MANGRUL KH

DI

TO
SHINGORI
GL 501.00 LWL K-7

GL 482.00
ESR 2 ESR 1 FSL 509.38 KHARADGAON ESR
J-4336
J-4387
FSL-500.87 m
FSL 515.20 513.20 P-5312
L=11 m
LWL 512.20 D=90.0 mm HDPE
LWL 504.87

AMRAPUR
SULTANPUR KH ESR
VILLAGE SULTANPUR KH

VILLAGE KHARADGAON

GL 501.20
ESR-1
WARUR KH P-5282 MANGRUL BK PROP ESR 2
L=15 m

WADGAON GL 505.20 KOLGAON ESR PROP


ESR-2

3
K-7
AWANE BK ESR 1 FSL-515.20 m

32
ESR GL 495.27 D=140.0 mm HDPE

MBR -3 KOLGAON

P-5

DI
DI K-7

ESR-1

mm
FSL 509.62

m
SHAHAJAPUR ESR KHARADGAON EX ESR

17

0.0
4,0
LWL 505.49 AWHANE KH SHAHAPUR ESR-1
ESR 1
mm
D=90.0 m

MANGRUL

25
L=
FSL 487.57

D=
L=1,431
P-37

LEGENDS
GL 495.42 P-5294
P-5 L=19 m
D=90.0 mm HDPE FSL 506.75 LWL 483.98
P-5290
L=199 m
D=90.0 mm HDPE
J-4344
L=161 m
D=150.0 mm DI K-7
P-5302
L=930 m
AWHANE BK ESR 1

VILLAGE AWHANE BK

NALA
LWL 503.75
GL 473.98
SHAHAJAPUR ESR
FSL 530.225 BK
ESR-1
VILLAGE SHAHAJAPUR

FSL-507.14 m J-4347 D=150 NALA

P-4 L=18 m J-4235


.0 mm DI K-7
FSL-491.70 m AWHANE KH-SHAHAPUR ESR
D=90.0 mm HDPE
FSL 509.32 GL 493.75 ESR 2
ESR-2 LWL 506.93
J-4353 J-4237
VILLAGE AWHANE KH-SHAHAPUR

SHAHAJAPUR TO SHAHAJAPUR
P-5
D=L=3 33 WADGAON ESR 2 PROP
HDPE

P-5301 LWL 525.757 20 ,99 5


D=90 L=696 m

L=41 m 0.0 6
D=150.0 mm DI K-7 m
m
ESR 1 FSL 505.90
m
.0 mm

FSL 527.670. 92 7
P-52 4 m DI K- GL501.15 ESR 1 DI WADGAON ESR 1 LWL 502.90
03

VILLAGE BHARANPUR

01 mm K-7

THATE
D=90.0
L=1,422mm DI K-7

L=3,00.0
P-36
P-53

J-4356
LWL 524.670 D=1
J-4357 FSL 500.07 9
TO
KOLGAON

P-5307 FSL-501.70 m 30
FSL 505.12 FSL 510.12 P-5308 P-5 m
WADGAON ESR 2

LWL 496.83 GL 490.90


AKHEGAON
L=65 m L=18 m 7
LWL 505.88 34
m

GL 512.670 D=90.0 mm
LWL 500.92 D=90.0 mm HDPE L=

EXISTING ESR RISING MAIN


J-4354
GL 496.22 FSL 549.68

ZONE-3

68 307

K-7
SUMP
90 1227 96

NALA
PE

PL-1=3 0.0

WADGAON ESR 1

LWL 546.68

P-5
FSL 511.12 GL 486.08
NALA

NALA
2

DI
NALA

0.0 2 m
D

TO JAVRE
P-5

mm m
HD

0 0 m mm
=1

WASTI
TITARFA
P-75

m
GL 499.309
NALA

GL 490.04
VILLAGE WADGAON

P-5300

m
1

P-5 21 m
J-4317

NALA
LWL 507.09

L=

L=
J-4352
L=341 m

MBR 3 AT AMRAPUR

L=225 P-5298

30
1
ESR-2 L=3,992
L=

SUMP

20
m
.0

L=14 m

6
P-76

D=200.0 m GL 534.68

D=
P- D=150.0 mm DI K-7 P-53
H

mm DI D=11 13 L=
D

24
D=

K-7
GL 496.27 0.0 34 m 7
PE

AWHANE KH SHAHAPUR-2
SUMP
VILLAGE BHARANPUR

FSL 502.54 28 1 m L=
AMRAPUR ESR 1

AWHANE BK ESR 2 PROP (sump) mm


D=201,640 m
VILLAGE THATE
NALA

THATE SUMP
HD P-5=73
VILLAGE AMRAPUR

AMRAPUR ESR 2

AKHEGAON
FSL 501.50
ESR 2 PE 0.0 mm

TO
L P- FSL-530.06 m
5326
VILLAGE THATE

LWL 500.01 P-5299 DI K-

PROPOSED ESR RISING MAIN


ROAD

7 J-4358
NALA

PATHARDI-SHEVG
TISGAON

LWL 513.50
VILLAGE AMRAPUR

L=19
AON
ROAD

L=11 m
TISGAON
TO

TO SHINGORI

D=20 3 m J-4368 P-5327 L=69 m


VILLAGE AMRAPUR

D=200.0 mm DI K-7 0
35 0.0 D=200.0 mm DI K-7
P-5 m mm

AWHANE KH-
J-4343 J-4379
VILLAGE AMRAPUR
NALA

FSL-492.64 m DI K-
GL494.24 FSL-499.50 m 25 PE
TO
SUSARE

1,5 D 7
GL 516.50

SUSARE
L= mmH
ESR-2
CANAL

90
ESR-2
CANAL

D=

BHARANPUR SHAHAPUR AKEGAON TITARFA PROP ESR-2


ROAD
PATHARDI-SHEVGAON

ESR 2
RAW WATER RISING MAIN
J-4389 BUS STOP

FSL-506.46 m
HDPE

P-5 015 m
PE
FSL 511.54
ESR-1

L=
HD

34
2,
D=90 73 m

7
0.0 1 m

9
KALEGAON
.0 mm

33
L=1,6 97

mm
LWL 508.54 AKHEGAON TITARFA ESR Ex.

P-5
D=9 1,90
P-52

CANAL
CANAL

L=
ROAD
PATHARDI-SHEVGAON

P-5288 SUSARE ESR 2 FSL 493.01


GL 493.54

FAKIR
L=4,935
m LWL 50056 FSL 511.25
FSL 507.27 D=150.
0 mm FSL 504.14 ESR LWL 523.25
MBR EXISTING
DI K-7 J-4338
ESR 1 LWL 504.32 J-4339
P-5285
FSL 509.70
L=1,217 m P-5288
TO

GL 503.92
PAGORI

FSL-494.35 m
WARUR

CHITALI EX ESR 1
BK

D=140.0 mm HDPE
ESR 2 LWL 499.17 LWL 506.70 P-5286
L=1,679 m GL 526.25
P-5 1 m mm
L= 150

VILLAGE KALEGAON FAKIR

FSL 515.55
D=

L=9 m
VILLAGE SUSARE

SUSARE ESR 1
22 .0

DI K-7
28

GL 494.81 D=110.0 mm HDPE D=150.0 mm


KALEGAON FAKIR ESR
4

CHITALI ESR 2 PROP


LWL 512.55 ESR
ROAD

GL 487.61
PATHARDI-SHEVGAON

SOMTHANE NALAWDE ESR

FSL 517.15 GL 494.70


ESR
DI

TO
PAGORI

PIMPALGAON

ESR 1
K-7

CHITALI LWL 514.15 GL 502.55 P-5286L=8 m


D=90.0 mm HDPE
SOMTHANE AKHEGAON
NALA

NALA

P-5423
L=369 m
GL 504.15
P-5422
D=90 mm HDPE

NALAWDE
DONGAR
J-4436
L=27 m FSL-504.15 m

J-4439
P-7
L=245 m
J-4438
P-12 L=8 m
NEWLY PROPOSED ESR
D=110.0 mm HDPE

L=
P-3

D=1 3,55
2 SAKEGAON
E

00 4 m
P

.0
HD

mm
DI
0.0 m
mm

K-7
9
D= 2,05
P-8

EXISTING ESR
11
L=

FSL 525.30
PRABHU PIMPRI
LWL 522.30

GL 510.30 FSL 520.63


ESR 1
PAGORI
J-4441
P-9

FSL 525.50 PADALI LWL 516.47


J-4434
FSL 533.26
ESR 3 ESR 2
PIMPALGAON
20 -14

FSL512.79
P

HD m

LWL 522.50 GL 505.35


PE
0

LWL 530.27
D=150.0 mm DI K-7

LWL 510.06
DISMENTALED AND PROPOSED ESR
L=
m

P-46 L=48 m
m

D=90.0 mm HDPE
GL 510.50 PRABHU PIMPARI ESR2
.0

L=1,728 m

P-50 L=979 m
GL 521.91 GL 499.79 FSL-512.79 m
90

D=150.0 mm DI K-7
ESR 1
PRABHU PIMPRI ESR 2
P-21
D=

ESR-2 P-49
L=2,488 m
P-48 J-4412
L=97 m
D=150.0 mm DI K-7
J-4413
FSL 513.85
PADALI ESR 2 PROP
D=90.0 mm HDPE
P-47
D=15
L=42 0.0 m

FSL 517.41 LWL 509.87


ESR 2
4 m m DI

SAKEGAON ESR 2 PROP LWL 513.64 J-4409


P-44
GL 502.41 L=17 GL 499.98

ZONE-4
3
FSL 532.96
m
m mm HDPE
P-15
ESR 1
K-7

J-4369
LWL 529.96
ESR 1 J-4417
L=39
D=90
.0
FSL 522.32
FSL 530.73
SUMP
-7

D=1
L=6210.0
K
DI

LWL 519.32
P-6 438 0.0

P-3
5

LWL 528.22
15 9 m
mm

6 m mm
P-4
L= =11

GL 514.96
D

86
0.0

P-57
L=

L=231 m
m mm

GL 504.32
H
D=

SANGVI KH ESR 1
DPE

GL 516.70
ESR 2
SANGVI KH
J-4408
HD

P- 139 42 m
PE

J-4406
L=
J-4403 J-4425 P-43
P-39 L=9 m
L=13 m D=90.0 mm HDPE
FSL528.87 FSL 533.49
ESR 2 P-33 L=37 m P
D= -54 L=
P-36
D=150.0
L=2,271 mm DI K-7

D=90.0 mm HDPE
LWL 526.29 90
.0 1,19
LWL 530.49

WTP
mm 0
ESR 1 HD m
PE

FSL 537.54 PE
90 1,8 1
m m
HD
m

D= L= P-5
.0 42

GL 520.49
m

LWL 534.54 GL 516.17


FSL 539.51
ESR 1 ESR 2
LWL 536.22 ESR-2
GL 526.35
DANGEWADI EX ESR 2
GL 524.54
SANGVI BK
K-7

FSL 522.55
DI
PE
90 =36 7

MALEGAON
mm
15 5 m
P-2

m m
HD

LWL 519.13
8
P-3
5

D= 2,76
m

0.0

ESR-1
L

J-4381 P-5412
L=
.0

GL 514.14
L=726 m
KHERDE EX ESR 1
ESR 2 ESR 1 JACK WELL
D=

FSL 535.06 MALEGAON ESR 2


MALEGAON ESR 1 PROP
E

ESR-1 J-4372
P
4m

HD
6

LWL 532.06
P-2

FSL 543.95 FSL 512.94 FSL 511.50


97

mm

DANGEWADI EX ESR 1
L=

FSL 532.48
.0

LWL 541.95 LWL 509.94 LWL 508.50


90
D=

LWL 529.51 GL 522.06


P-5430 P-35
HATRAL-SAIDAPUR ESR 2
GL 497.84 GL 496.50
GL 531.95 L=359 m

PUMP HOUSE
J-4401 L=1,826 m
FSL 543.65 D=150.0 mm DI J-4395

ESR 2 GL 519.51 K-7 P-41 L=17 m P-30 MALEGAON ESR 1


P-17
L=109 m

DANGEWADI
P-24 D=90.0 mm HDPEL=
LWL 540.65 P-5429 313

HATRAL-SAIDAPUR
L=8 m
L=245m D=9 27 m J-4393
0.0 mm
HDPE

GL 528.65
ESR-1
KHERDE ESR 2 PROP
KHERDE
D=150.0 mm DI K-7
L=3,5
P-56
D=10
0.0
57 m DI K-

DULECHANDGAON
L=1,844 m
mm

P-25

ESR-1 CLIENT: MAHARASHTRA JEEVAN PRADHIKARAN


7

DULECHANDGAON ESR 1 ESR-2


AMRAPUR-MALI BABHULGAON & OTHER 49 VILLAGES
DULECHANDGAON ESR 2 PROP
FSL 543.99
FSL546.62
D=150.0 mm DI K-7

LWL 539.49
LWL 543.62
ESR 1
PATHARDI REGIONAL RURAL WATER SUPPLY SCHEME
L=4,852 m

GL 528.99 J-4397
FSL 543.65
DI K-7

P-28 DULECHANDGAON ESR 2


P-29

P-22 L=26 m
J-4420
P-20 0m GL 531.62
L=13 L=1,599 m
P-31

TAL:- SHEVGAON DIST:-AHMEDNAGAR


LWL 540.65 D=90.0 mm HDPE D=90.0 mm HDPE m
m

209
D=100.0 mm

AGASKHAND EX ESR 1
PE
L=5, HD
P-52 L=94

DULECHANDGAON ESR 1

ESR-1 0.0
mm

MBR-4
D=11
ESR 2
P-53
L=4,240 m
MALIBABHULGAON ESR 1

J-4380
GL 524.66
ESR-2
D=150.0
mm DI K-7 L=51 m P-34
D=90.0 mm
FSL 555.50 AGASKHAND ESR 2 PROP

HDPE FSL 542.22

DRAWING TITLE : PUMPING MAIN DETAIL DRAWING


FSL 569.60
J-4375
LWL 552.50 FSL 553.65
HDPE

LWL 539.22
0 mm m

LWL 551.65
LWL 566.60 ESR 2
63
P-1L=8

GL 540.50
ESR 1 FSL 550.00 FSL 592.651
D=90.

P-55 J-4422
GL 553.60 -7 GL 541.65 GL 529.22
L= LWL 547.00 IK

SCALE: 1:1 DRAWN BY: SRUSHTI.A DATE:9-03-2022 DWG NO: 2


SHEKATE ESR

D=151,559
P-16
L=42
D=90

FSL 559.65 m D 8 P-5414


0.0 m P-1 55 mm L=103 m
mm

SHEKATE
DI 4,2 .0
.0 mm

J-4445
m

K-7
GL 535.00 L= 00
LWL 556.65 MALIBABHULGAON ESR 2

LWL 587.738
D
=2
ESR P-5413
L=168 m
HDPE

J-4428
P-3
L=

FSL 559.60
D

J-4386
3,1

NIVDUNGE ESR 1
=2

GL 546.65
00

34 m

NIVDUNGE
.0

m DI

P-11 LWL 556.30


m

L=15 m
D=90.0 mm HDPE
K-7

WALUNJ ESR
WALUNJ ESR

FSL-559.60 m P-2 m PE
GL 544.30 276
L=2, 0 mm
HD
L=294 m

0.
D=11
P-19

MALIBABHULGAON
P-
L=37 10 GL 577.930
D=15 5 m J-4391
0.0 mm
J-4430
AGASKHAND
SECTIONAL
DI K-
MBR-4 P-4
7
L=3,444 m
SUB DIVISION EXECUTIVE SUPERINTENDING
D=112.0 mm

WALUNJ CHECKED BY :- ENGINEER ENGINEER ENGINEER ENGINEER


FLOW DIAGRAM FOR R.R. WATER SUPPLY SCHEME FOR AMRAPUR MALI BABHULGAON AND OTHER 49 VILLAGES
KUNTEFAL ESR 1 TALANI ESR1 GHOTAN ESR 1 GHOTAN ESR 2
KUNTEFAL ESR 2 50,000 LITR 1,29,000 LITR 80,000 LITR
25,000 LITR 32,000 LITR

FSL 493.49 FSL 496.750 FSL 500.75 FSL 501.05 FSL 499.10
LWL 489.88 LWL 493.750 LWL 496.44 LWL 498.05 LWL 494.54

GL 479.95 GL 476.750 GL 486.73 GL 486.05 GL 486.47

L=135M
L=530M

L=18M

L=20M
ROATALE ESR
MBR-1 TO KUNTEFAL
ESR-2 L=3901M 50,000 LITR
TALANI ESR2
29,000 LITR FSL 488.43
MBR-1 AT SHEVGAON WTP
FSL 507.94 LWL 486.02
FSL 513.455 LWL 503.94

L=455M
LWL 508.462 GL 476.17
GL 489.94

L=20M L=256 M
GL 493.364 MBR-1 TO GADEWADI ESR L=18023M
RL 497.495 MEASURING
WEIR NAJIK BABHULGAON ESR 1
NAJIK BABHULGAON ESR 2 KURUDGAON ESR 2 KURUDGAON ESR 1 GADEWADI ESR
50,000 LITR 36,000 LITR 10,000 LITR 50,000 LITR 1,17,000 LITR
WTP TO MBR-1 AT SHEVGAON L=75 M
2500 1500

Ø 12.50 MM

FSL 504.01 FSL 519.50 FSL 490.85 FSL 486.80 FSL 479.47
LWL 500.54 LWL 516.50 LWL 487.85 LWL 482.42 LWL 476.47
FLASH
GL 493.495 5.50 M

MIXER
300

DISTRIBUTION PURE WATER GL 490.05 GL 501.50 GL 477.85 GL 472.56 GL 457.47


AERATION FOUNTAIN
RAW WATER RISING MAIN CHAMBER SUMP & PUMP HOUSE WTP TO MBR-2 AT AKHEGAON L=6270M L=25M
500MM DI-K9 L= 19990 M CLARIFLOCCULATOR L=85 M L=1652M L=20 M L=449 M

SALWADGAON ESR 1 SALWADGAON ESR 2 MALEGAON NE ESR 1 MALEGAON NE ESR 2 THAKUR NIMGAON ESR 1 HASNAPUR ESR KOLGAON ESR MANGRUL BK ESR MANGRUL KH ESR
EXISTING WTP 50,000 LITR 25,000 LITR 26,000 LITR 40,000 LITR 50,000 LITR 1,33,000 LITR 50,000 LITR 55,000 LITR 25,000 LITR
FSL 519.43 FSL 524.95 FSL 519.23 FSL 520.26 FSL 508.63 FSL 523.00 FSL 507.11 FSL 517.60 FSL 516.75
MBR-2 AT AKHEGAON
LWL 515.84 LWL 521.95 LWL 516.23 LWL 515.84 LWL 505.72 LWL 520.00 LWL 503.60 LWL 514.60 LWL 513.96
FSL 541.467

LWL 536.484 GL 505.02 GL 499.60


GL 509.95 GL 506.23 GL 506.234 GL 495.77 GL 508.00 GL 493.58 GL 504.12

L=1340M

L=106M
L=171M

L=11M
L=30M

L=19M
L=26M
L=9M

L=23
511.037
MBR-2 TO MANGRUL KH ESR L=14522M
PROPOSED JACKWELL AKHEGAON TITARFA ESR
WTP TO MBR-4 AT PATHARDI L=24400M D=300MM KHARADGAON ESR THAKUR NIMGAON ESR 2 KOLGAON ESR 2
JAYAKWADI DAM 1,65,000 LITR 1,27,000 LITR
48,000 LITR 10,000 LITR
MBR-2 TO SAMANGAON ESR 2 L=12478M FSL 512.27 FSL 511.48
TOP R.L.475.00M
LWL 509.27 LWL 508.48 FSL 510.47 FSL 515.20
SAMANGAON ESR 2 LOLEGAON ESR SAMANGAON ESR 1 WADULE BK ESR-2 WADULE BK ESR-1 LWL 507.47 LWL 512.20
EXISTING APPROACH BRIDGE 43,000 LITR 50,000 LITR 50,000 LITR 100000 LITR 50,000 LITR
DISCHARGE FLOOR GL 495.27 GL 496.48
LEVEL 469.0M FSL 493.66 FSL 490.86 FSL 485.84 FSL 478.03 FSL 479.29 GL 495.47 GL 505.20
LWL 490.66 LWL 487.41 LWL 481.70 LWL 474.45 LWL 476.29 L=15M MBR-2 TO AKHEGAON DONGAR ESR L=11642M L=9M

WARUR KH ESR SOMTHANE NALAWDE ESR AKHEGAON DONGAR ESR


GL 478.66 GL 477.11 GL 472.23 GL 463.64 GL 464.28 83,000 LITR 30,000 LITR 84,000 LITR L=131M L=1560 M

L=1904M
FSL 526.25

L=861M
L=1447M L=44M L=222M L=60M FSL 505.63 FSL 509.70
LWL 502.63 LWL 506.70 LWL 523.25

MBR 3 AT AMRAPUR
GL 490.63 GL 494.70 GL 511.25
FSL 530.225

LWL 525.757
WADGAON ESR 1 WADGAON ESR 2 THATE ESR
MBR-2 TO BHAGUR ESR L=7532M 76,000 LITR
50,000 LITR 16,000 LITR
FSL 500.07 FSL 505.90 FSL 549.68
GL 499.309 WARUR BK ESR-3 WARUR BK ESR-1 WARUR BK ESR-2 BHAGUR ESR 2 BHAGUR ESR 1
LWL 496.83 LWL 502.90 LWL 546.68
50,000 LITR 50,000 LITR 50,000 LITR 10,000 LITR 50,000 LITR
PUMPING MAIN TO MBR-3 L=115M D=300MM
L=24400M D=300MM FSL 504.23 FSL 497.94 FSL 496.48 FSL 488.60 FSL 490.42
GL 486.08 GL 490.90 GL 534.68
LWL 500.47 LWL 484.26 LWL 492.49 LWL 485.60 LWL 486.22

LSL 433.92M L=124 M L=25 M L=165M


432.97 M SHAHAJAPUR ESR SUSARE ESR 1 SUSARE ESR 2 GL 490.54 GL 482.92 GL 483.15 GL 475.60 GL 476.45
SULTANPUR KH ESR
50,000 LITR 50,000 LITR 60,000 LITR 93,000 LITR L=7782 M
FSL 511.54 L=31M L=20M L=9M L=9M
FSL 496.69 FSL 487.57 FSL 504.14 THATE SUMP
LWL 493.09 LWL 483.98 LWL 508.54
LWL 499.17

GL 482.00 GL 493.54
GL 473.98 L=18 M
GL 487.61
MBR 4 AT PATHARDI
MBR-3 TO SULTANPUR KH ESR L=2855M L=8M
MBR-3 TO SUSARE ESR L=7104M
AWHANE BK ESR 1 FSL 592.651
AMRAPUR ESR-2 AMRAPUR ESR-1 KALEGAON FAKIR ESR
60,000 LITR LWL 587.738
40,000 LITR 50,000 LITR 50,000 LITR
FSL 514.42 FSL 511.12 FSL 510.12 FSL 507.27
LWL 511.42 LWL 507.09 LWL 505.88 LWL 504.32
GL 577.930

GL 495.42 GL 496.27 GL 496.22 GL 494.81


SANGAVI BK ESR 2

MBR-4 AT PATHARDI TO PAGORI PIMPALGAON ESR 2 L=14642M


10,000 LITR
L=30M
L=34M

FSL 533.49
LWL 530.49
MBR-3 TO AWHANE BK ESR L=5900M L=1673M

GL 520.49
AWHANE BK ESR-2 BARHANPUR ESR AWHANE KH+SHAHAPUR ESR
1,00,000 LITR 25,000 LITR 70,000 LITR
FSL 506.75 SANGAVI BK ESR 1
FSL 527.670. FSL 516.15
LWL 503.75 25,000 LITR
LWL 524.670 LWL 513.15 PAGORI PIMPALGAON ESR 2
DULECHANDGAON ESR 1 MALEGAON ESR 1 MALEGAON ESR 2 KHERDE ESR PAGORI PIMPALGAON ESR 1
FSL 528.87
50,000 LITR 54,000 LITR 30,000 LITR 44,000 LITR 50,000 LITR 1,23,000 LITR

L=1225 M
LWL 526.29
GL 512.670 GL 501.15 GL 493.75
FSL 543.99 FSL 511.50 FSL 512.94 FSL 543.65 FSL 513.85 FSL 522.32
LWL 539.49 LWL 508.50 LWL 509.94 LWL 540.65 LWL 509.87 LWL 519.32
L=25M
GL 516.17

L=3014M L=2076M L=20M GL 528.99 GL 496.50 GL 497.84 GL 528.65 GL 499.98 GL 504.32


L=41M
AWHANE BK SUMP

L=867 M
L=109M

L=17M
L=12M
SAKEGAON ESR 2 DANGEWADI ESR

L=39M
CHITALI ESR 2 CHITALI ESR 1 SAKEGAON ESR 1
60,000 LITR 40,000 LITR 50,000 LITR 1,16,000 LITR 54,000 LITR

FSL 537.34 L=14642M


FSL 515.55 FSL 517.15 FSL 520.63 FSL 532.96
LWL 534.34

MBR-4 AT PATHARDI TO MADHI ESR 3 L=12998M


LWL 512.55 LWL 514.15 LWL 516.47 LWL 529.96 PRABHU PIMPARI ESR-1 PRABHU PIMPARI ESR-2
DULECHANDGAON ESR-2 PRABHU PIMPARI ESR-3
36,000 LITR SANGAVI KH ESR 1 60,000 LITR 50,000 LITR
25,000 LITR 50,000 LITR
GL 502.55 GL 504.15 GL 505.35 GL 514.96 GL 519.34
FSL 546.62 FSL 530.73 FSL 517.41 FSL 512.79
FSL 533.26
LWL 543.62 LWL 528.22 LWL 513.64 LWL 510.06
LWL 530.27
L=182 M L=182 M L=150M
GL 531.62 GL 516.70 GL 502.41 GL 499.79
GL 521.91
MBR-4 AT PATHARDI TO PADALI ESR L=14690M
PADALI ESR L=13M
97,000 LITR
LEGENDS FSL 525.30
HATRAL-SAIDAPUR ESR 2 HATRAL-SAIDAPUR ESR 1
35,000 LITR
L=1599M
SANGAVI KH ESR 2
L=173M L=50M L=2488M
LWL 522.30 36,000 LITR 17,000 LITR
FSL 543.95 FSL 539.51
FSL 537.54
GL 510.30 LWL 541.95 LWL 536.22
LWL 534.54
PURE WATER RISING MAIN
GL 531.95 GL 526.35
GL 524.54

PURE WATER GRAVITY MAIN


L=4000M

L=2073M
L=974M

WALUNJ ESR AGASKHAND ESR SHEKATE ESR


40,000 LITR 59,000 LITR 60,000 LITR

MBR EXISTING MALIBABHULGAON ESR 1


FSL 559.60 FSL 555.50 FSL 542.22
NIVDUNGE ESR 1 NIVDUNGE ESR 2 50,000 LITR LWL 556.30 LWL 552.50 LWL 539.22
150,000 LITR 53,000 LITR FSL 543.65
FSL 559.65 FSL 569.60 LWL 540.65
LWL 556.65 LWL 566.60 GL 544.30 GL 540.50 GL 529.22
MAHARASHTRA JEEVAN PRADHIKARAN
NEWLY PROPOSED ESR GL 524.66 CLIENT:
GL 546.65 GL 553.60 AMRAPUR-MALI BABHULGAON & OTHER 49 VILLAGES
REGIONAL RURAL WATER SUPPLY SCHEME
L=51M
L=15M L=40M MBR-4 AT PATHARDI TO SHEKTE ESR L=11305M TAL:- SHEVGAON DIST:-AHMEDNAGAR
EXISTING ESR FLOW DIAGRAM OF EXISTING, PROPOSED AND
DRAWING TITLE :
DISMENTALED AND PROPOSED ESR
MALIBABHULGAON ESR 2
2,22,000 LITR SCALE: 1:1 DRAWN BY: SWARUP. G DATE: 20-02-2022 DWG NO: 3
DISMENTALED AND PROPOSED ESR FSL 550.00
LWL 547.00

GL 535.00
SUMP SECTIONAL SUB DIVISION EXECUTIVE SUPERINTENDING
L=863M
CHECKED BY :- ENGINEER ENGINEER ENGINEER ENGINEER
(m)
(m)

(m)
Chainage

PIPE DIA
Datum: 485.0
AMRAPUR MBR-3

Existing Ground Level


FSL-509.62 m

487
489
491
493
495
497
499
501
503
505
507
509
511
513
515
517
519
521
523
525
527
529
0.000 498.102

20.000 497.969

SCALE :- HOR 1:2000,VER. 1:200


40.000 497.715

AV-1
60.000 497.092

80.000 496.466

100.000 495.825

SV-1
120.000 495.183

140.000 494.541

D=200.0 mm DI K-7
160.000 494.184

180.000 493.844

LSL-525.76 m hf=1.186 m/km


200.000 493.607

Q=14.884 Lit/sec
220.000 493.400

240.000 493.458

GL-493.40 m
260.000 493.705

FSL-509.62 m
280.000 494.040

LSL-525.76 m

GL 499.309
300.000 494.393

HGL-525.48 m
320.000 494.589

340.000 494.729

360.000 494.923 00.000


498.10
380.000 495.148 2

AMRAPUR MBR-3
400.000 495.400

420.000 495.655

PWGM-30 FROM AMRAPUR MBR-3 TO AWHANE.BK ESR


hf=1.186 m/km
440.000 495.955

Q=14.884 Lit/sec

D=200.0 mm DI K-7
L=11 m

460.000 496.265
D=200.0 mm DI K-7

480.000 496.614

500.000 496.994
56

AV-2
520.000 497.393
0.
GL-498.68 m

L=225 m 2
58 00
0

20
.
540.000 498.273
0.
00

00
TO
0

HGL-525.08 m
560.000 498.683
49

GL-498.68 m
8. AM

D=200.0 mm DI K-7
68
580.000 498.245
49 3

49
8.
RA
2

3
600.000 498.357

.4
PU
O T 45 R

00
620.000 498.141
ES
640.000 497.906
D= AMR R-
11 A 2

GL-498.25 m
660.000 497.764

hf=0.72 m/km
0. PU
0
L=341 m

HGL-525.07 m
680.000 497.780

Q=11.343 Lit/sec
mm R E
SR
700.000 497.277
HD -
720.000 496.603
PE 1
GL-498.25 m

740.000 495.968

GL-493.40 m
760.000 495.489

780.000 495.186

800.000 494.751
D=200.0 mm DI K-7

820.000 494.277

840.000 493.968

860.000 493.881

880.000 493.701

900.000 493.267

920.000 492.834

940.000 492.400

960.000 492.019

980.000 491.809

1000.000 491.598

AV-3
1020.000 491.313

1040.000 490.418

1060.000 489.615

1080.000 489.702

1100.000 489.496

1120.000 489.289

1140.000 489.283

1160.000 489.690

1180.000 489.530

1200.000 489.354

1220.000 489.251

1240.000 489.148

1260.000 489.099

1280.000 489.077

SCV-1
1300.000 489.560

1320.000 489.599

1340.000 489.770

1360.000 489.917

1380.000 489.979

1400.000 490.083

1420.000 490.231

1440.000 490.408

1460.000 490.447

1480.000 490.472

1500.000 490.496

AV-4
1520.000 490.514

1540.000 490.575

1560.000 490.636

1580.000 490.698

1600.000 490.739

1620.000 490.843

1640.000 490.928

1660.000 490.984

1680.000 490.987

1700.000 491.038

1720.000 491.059

1740.000 491.053

1760.000 491.129

1780.000 491.206

1800.000 491.257

1820.000 491.297

1840.000 491.336

1860.000 491.373

1880.000 491.492

1900.000 491.670

1920.000 491.851

1940.000 491.954

1960.000 492.054

1980.000 492.168

2000.000 492.281

AV-5
2020.000 492.394

2040.000 492.506

2060.000 492.585

2080.000 492.667

2100.000 492.749

SV-2
2120.000 492.852

2140.000 492.904

2160.000 493.080

2180.000 493.258

2200.000 493.458

2220.000 493.658

2240.000 493.858

2260.000 493.973

2280.000 494.049

2300.000 494.156

2320.000 494.332

2340.000 494.533

2360.000 494.727

2380.000 494.964
L=3,992 m
D=200.0 mm DI K-7

2400.000 495.164

2420.000 495.332

2440.000 495.501

2460.000 495.638

2480.000 495.670

2500.000 495.748

2520.000 495.894

2540.000 496.203

2560.000 496.276

2580.000 496.349

2600.000 496.530
D=200.0 mm DI K-7

2620.000 496.784

2640.000 497.115

2660.000 497.479
AV-6

2680.000 497.569

2700.000 497.689

2720.000 497.825

2740.000 497.973

2760.000 498.136

2780.000 498.292

2800.000 498.408

2820.000 498.655

2840.000 498.922

2860.000 499.183

2880.000 499.429

2900.000 499.665

2920.000 499.839

2940.000 499.969

2960.000 500.098

2980.000 500.297

3000.000 500.684

3020.000 500.897

3040.000 501.030

3060.000 501.175

3080.000 501.321

3100.000 501.524

3120.000 501.726

3140.000 501.987

3160.000 502.485
AV-7

3180.000 502.407

3200.000 502.284

3220.000 502.219

3240.000 502.212

3260.000 502.223

3280.000 502.270

3300.000 501.300
hf=0.421 m/km
Q=8.507 Lit/sec

3320.000 501.090

3340.000 500.919

3360.000 500.606

3380.000 500.355

3400.000 500.214

3420.000 500.056

3440.000 499.802

3460.000 499.589

3480.000 499.441

3500.000 499.250

3520.000 498.996

3540.000 498.699

3560.000 498.516
AV-8

3580.000 498.332

3600.000 498.118

3620.000 497.896

3640.000 497.693

3660.000 497.508

3680.000 497.323

3700.000 497.138

3720.000 496.953

3740.000 496.703

3760.000 496.331

3780.000 495.964
L SECTION FROM AMRAPUR MBR-3 TO AWHANE BK ESR-1

3800.000 495.826

3820.000 495.689

3840.000 495.551

3860.000 495.196

3880.000 494.545

3900.000 494.333

3920.000 494.193

3940.000 494.027

3960.000 493.868
=

3980.000 493.616

4000.000 493.460
S

SV-3
T HA

4020.000 493.402
D O H

4040.000 493.325
AV-9
90 AWHAPU

4060.000 493.165
.0 AN R E

4080.000 492.861
m E S
HD+

4100.000 492.565
m KH R-1
PE

4120.000 492.289

4140.000 492.013
46
00

4160.000 491.737
.0
GL-493.01 m 00

45

4180.000 491.401
6 0.

4200.000 491.015
49

00
3

4220.000 490.825
.0
15

4240.000 490.657
49
3.

4260.000 490.523
07
0

SCV-2

4280.000 490.457

4300.000 490.681

4320.000 490.853
S

4340.000 491.031
TO HA

4360.000 491.341
H
L=41 m

4380.000 491.575
AW AP
N

4400.000 491.737
HA UR
E

4420.000 491.774
+
E SR

GL-493.07 m

4440.000 491.810
KH -2

4460.000 491.830

4480.000 491.835
D=90.0 mm HDPE

4500.000 491.839

4520.000 492.090
D=150.0 mm DI K-7

4540.000 492.683
GL-493.01 m
HGL-523.39 m

4560.000 493.015

4580.000 493.084
AV-10

4600.000 493.070

4620.000 492.113

4640.000 491.959

4660.000 491.715
GL-493.07 m

4680.000 491.340
HGL-523.34 m
hf =1.152 m/km
Q =6.875 Lit/sec
L=930 m

4700.000 490.964

4720.000 490.763

4740.000 490.665

4760.000 490.564
D=150.0 mm DI K-7

4780.000 490.459

4800.000 490.357

4820.000 490.255

4840.000 490.087

4860.000 489.853

4880.000 489.720

4900.000 489.646

4920.000 489.613

4940.000 489.589

4960.000 489.528

4980.000 489.541
SCALE:

5000.000 489.842
AV-11

5020.000 489.927
CLIENT:

5040.000 489.864
55

5060.000 489.802
40
. 00

5080.000 489.739
0
GL-491.70 m

5100.000 489.677
L=161 m
D=150.0 mm DI K-7
49

5120.000 489.615
1 .70

5140.000 489.552
hf =0.985 m/km
0

Q =6.319 Lit/sec
D=

5160.000 489.413
TO

D=150.0 mm DI K-7
9

5180.000 488.471
0.

HA
0

5200.000 488.258
56
RA

5220.000 488.065
80
m

.0
NP

CHECKED BY :- ENGINEER
m

5240.000 487.849
00
UR

SECTIONAL

5260.000 487.876
ES
HD

49

5280.000 487.297
R-

1.
2

48

5300.000 486.169
PE

SCV-3

5320.000 487.924
D=

5340.000 487.678
TO
15

5360.000 489.412
0

AW

5380.000 489.709
.0

59
HA

5400.000 489.755
TAL:- SHEVGAON
2.
NE
m

05
9

5420.000 489.891
m

BK

GL-491.48m

ENGINEER

5440.000 490.224
SUB DIVISION
ES
DI

5460.000 490.424
R
2

49
K

5480.000 490.560
5.

DI PIPE
-7

PR

5500.000 490.823
1

LENGTH
O
P

5520.000 491.121
PIPE LINE
(s

HGL-522.43 m

AIR VALVE

5540.000 491.700
AIR VALUE

HDPE PIPE
um

PROPOSED
p)

5560.000 491.707
AV-12 GL-491.70
GL 495.42 m

5580.000 491.873
LEGEND

DETAILS
m

SCOUR VALVE
SCOUR VALUE
SLUICE VALUE

5600.000 492.039
DRAWN BY: SRUSHTI.A DATE:04-04-2022
GROUND LEVEL

5620.000 492.444
L=199 m

AWHANE BK ESR 1

ENGINEER
EXECUTIVE

5640.000 492.857
Q =5.37 Lit/sec

5660.000 493.414
hf =0.729 m/km

5680.000 493.589
42 FSL-509.62 m

5700.000 493.751
MAHARASHTRA JEEVAN PRADHIKARAN

5720.000 493.882
GL-491.48m

5900 M

DIST:-AHMEDNAGAR

5740.000 494.013
D=90.0 mm HDPE

5760.000 493.979
HGL-522.43 m

REGIONAL RURAL WATER SUPPLY SCHEME

5780.000 493.924
SV-4

90 MM DIA

DWG NO:

5800.000 494.251

5820.000 494.660
ENGINEER
D=90.0 mm HDPE
hf =2.471 m/km

DRAWING TITLE : L SECTION FOR MBR-3 TO AWHANE BK ESR-1


Q =2.014 Lit/sec

5840.000 495.289
AMRAPUR-MALI BABHULGAON & OTHER 49 VILLAGES

5860.000 495.961
SUPERINTENDING
AV-13

5880.000 495.855
200 &150 MM DIA

5900.000 495.747
5902.059 495.421
50 MM DIA - 1 NOS
SLUICE VALVE 90 MM DIA - 1 NOS
TOTAL - 4 NOS
TOTAL - 13 NOS

100 MM DIA - 2 NOS


200 MM DIA - 3 NOS
50 MM DIA - 13 NOS

TOTAL - 3 NOS
HGL-525 m

FSL-509.62 m

GL 495.42
AWHANE BK ESR 1
LEGEND
AIR VALUE
SLUICE VALUE
scv
SCOUR VALUE
GROUND LEVEL L SECTION OF FROM SHEVGAON MBR-1 TO GADEWADI ESR
PROPOSED
PIPE LINE

DETAILS
LENGTH 18,467 M
HDPE PIPE 90 & 110 MM DIA
DI PIPE 200, 300 & 350 MM DIA

AIR VALVE 80 MM DIA-14 NOS


50 MM DIA -16
SCOUR VALVE 100 MM DIA -7 NOS
65 MM DIA 2 NOS
SLUICE VALVE 350 MM DIA -5 NOS
300 MM DIA - 3 NOS
100 MM DIA - 1NOS
90 MM DIA - 1 NOS
LEGEND
AIR VALUE
SLUICE VALUE
scv
SCOUR VALUE
GROUND LEVEL L SECTION OF FROM SHEVGAON MBR-1 TO GADEWADI ESR
PROPOSED
PIPE LINE

DETAILS
LENGTH 18,467 M
HDPE PIPE 90 & 110 MM DIA
DI PIPE 200, 300 & 350 MM DIA

AIR VALVE 80 MM DIA-14 NOS


50 MM DIA -16
SCOUR VALVE 100 MM DIA -7 NOS
65 MM DIA 2 NOS
SLUICE VALVE 350 MM DIA -5 NOS
300 MM DIA - 3 NOS
100 MM DIA - 1NOS
90 MM DIA - 1 NOS
LEGEND
AIR VALUE

SLUICE VALUE
scv
SCOUR VALUE

GROUND LEVEL

PROPOSED PIPE
DETAILS
LENGTH 4579 M

DI PIPE 200 MM DIA DI K9

HDPE PIPE 110 MM & 90 MM DIA


AIR VALVE 50 MM DIA -9 NOS

SLUICE VALVE 200 MM DIA- 2 NOS


90 MM DIA -1 NOS

Z:\WaterSupply\48 Villages Amrapur MH\R1\Compony LOGO.jpeg


(m)
(m)

(m)

DI PIPE
Chainage

PIPE DIA
Datum: 485.0

LENGTH
PIPE LINE

AIR VALVE
AIR VALUE

HDPE PIPE
PROPOSED
Existing Ground Level
481
487
489
491
493
495
497
499
501
503
505
507
509
511
513
515
517
519
521
523
525
527
FSL-530.225 m 529

483
485
0.000

LEGEND
498.332

DETAILS

SCOUR VALVE
SLUICE VALVE
SCOUR VALUE
SLUICE VALUE

GROUND LEVEL
MBR-3 AT AMRAPUR
20.000 497.971

-
SCALE :- HOR 1:2000,VER. 1:200
40.000 497.478

60.000 496.750

80.000 496.503

LSL-525.76 m

GL 499.309
FSL-509.62 m

2853 M
LSL-525.757 m
100.000 496.187

SV-1
120.000 495.527

90 MM DIA
140.000 494.846

00
.0
0
160.000 494.303

0
180.000 493.852

49
8.
200.000 494.020

50 MM DIA - 6 NOS

50 MM DIA - 2 NOS
90 MM DIA - 2 NOS
33
2
220.000 494.208

240.000 493.824

260.000 493.439

280.000 493.150

300.000 492.869

320.000 492.856

340.000 492.993

360.000 493.118

MBR-3 AT AMRAPUR
380.000 493.164

400.000 493.210

420.000 493.368

440.000 493.510

PWGM-28 FROM AMRAPUR MBR-3 TO SULTANPUR.KH ESR


AV-1
460.000 493.403

480.000 493.374

500.000 493.250

520.000 493.108
L=1

540.000 492.967
D=9
,

560.000 492.783
0
4
.

580.000 492.512
2
0

600.000 492.352
2

620.000 492.450

640.000 492.548
m

660.000 492.646
mm

680.000 492.743

700.000 492.840
H

720.000 493.158

740.000 493.124
D

760.000 493.090

D=90.0 mm HDPE

Location: Maharashtra-MH
780.000 493.007

Date: 2022.05.22 15:11:38 IST


800.000 492.842
PE

Signature Not Verified


820.000 492.677

840.000 492.511

860.000 492.384

880.000 492.256

AV-2
900.000 491.919

920.000 491.509

940.000 491.197

Digitally signed by AJIT SHARADRAO SHAHANE


960.000 491.101

980.000 491.005

hf=2.393 m/km
1000.000 490.909
Q=1.979 Lit/sec
1020.000 490.813

1040.000 490.797

1060.000 490.817

1080.000 490.838

1100.000 490.789

1120.000 490.633

1140.000 490.477

1160.000 490.313

1180.000 490.145

1200.000 489.978

1220.000 489.726

1240.000 489.405

1260.000 489.085
14
20

1280.000 488.765
.0

GL-488.32 m

1300.000 488.444
00

1320.000 488.123
48

1340.000 487.887
D

8.
32
=9

1360.000 487.662
8
0.0

1380.000 487.809
TO
m

1400.000 488.257
m

HGL-522.35 m
SH

1420.000 488.328
A
H

GL-488.32 m
H
D

1440.000 489.048
AJ

AV-3
PE

1460.000 488.659
A

1480.000 488.270
PU
R

1500.000 487.881
ES

1520.000 488.258
SCV-1
R

1540.000 488.759

1560.000 489.260

1580.000 489.685

1600.000 489.930

1620.000 490.174

1640.000 490.419

1660.000 491.002

1680.000 491.539

1700.000 491.695

1720.000 491.857

1740.000 492.052

1760.000 492.109
AV-4

1780.000 491.905
L=1,431

1800.000 491.695

1820.000 491.519

1840.000 491.399
D=90.0 m

1860.000 491.279

1880.000 491.160

1900.000 491.040
mm HD

1920.000 490.921
L SECTION FROM AMRAPUR MBR-3 TO SULTANPUR KH ESR

1940.000 490.756

1960.000 490.548
PE

1980.000 490.340

2000.000 490.132

2020.000 490.012

2040.000 489.899

2060.000 489.832

2080.000 489.796

2100.000 489.760
SV-2

2120.000 489.632

2140.000 489.429

2160.000 489.226

2180.000 489.023
D=90.0 mm HDPE

2200.000 488.837

2220.000 488.683

2240.000 488.529

2260.000 488.375

2280.000 488.505
SCV-2

2300.000 488.853
28

2320.000 489.202
54
.9

AV-5
1

2340.000 489.271
5

hf=0.775 m/km

2360.000 489.141
Q=1.076 Lit/sec
48

2380.000 489.003
2.
FSL-496.69 m
00

2400.000 488.897
1

2420.000 488.887

2440.000 488.878

2460.000 488.868
SULTANPUR ESR

2480.000 488.859
SCALE:
CLIENT:

2500.000 488.767

2520.000 488.601

2540.000 488.435

2560.000 488.501
GL 482.00

2580.000 488.724

2600.000 488.883
CHECKED BY :- ENGINEER
SECTIONAL

2620.000 488.857

2640.000 488.831

2660.000 488.747

2680.000 487.583
TAL:- SHEVGAON

2700.000 487.420
ENGINEER
SUB DIVISION

2720.000 487.257
AV-6

2740.000 486.155

2760.000 485.078

2780.000 484.002
DRAWN BY: SRUSHTI.A DATE:07-04-2022

2800.000 484.636
ENGINEER
EXECUTIVE

2820.000 483.265
MAHARASHTRA JEEVAN PRADHIKARAN

2840.000 483.895
HGL-521.24 m

2854.915 482.001
DIST:-AHMEDNAGAR
REGIONAL RURAL WATER SUPPLY SCHEME

DWG NO:

ENGINEER
AMRAPUR-MALI BABHULGAON & OTHER 49 VILLAGES
FSL-496.69 m

DRAWING TITLE : L SECTION FOR MBR-3 TO SULTANPUR KH ESR


GL 482.00