STUDY OF THEODOLITE IN DETAIL PRACTICE FOR MEASUREMET OF HORIZONTAL AND 2 2 TO 6 VERTICAL ANGLES MEASUREMENT OF HORIZONTAL ANGLES BY THE METHOD OF REPETITION AND 3 REITERATION 7 TO 11 4 MEASUREMENT OF HORIZONTAL ANGLES BY REITERATION 12 TO 13 5 CURVE SETTING DIFFERENT METHODS 14 TO 17 6 SETTING OUT WORK FOR BUILDING AND PIPE LINES 18 TO 19 7 SETTING OUT WORK FOR BUILDING AND PIPE LINES 20 TO 22 8 DETERMINATION OF AREA USING TOTAL STATION 23 TO 25 9 TRAVERSING USING TOTAL STATION 26 TO 28 10 CONTOURING USING TOTAL STATION 29 TO 30 11 DETERMINATION OF REMOTE HEIGHT USING TOTAL STATION 31 TO 32 12 STAKE OUT USING TOTAL STATION 33 TO 34 DISTANCE, GRADIENT, DIFF, HEIGHT BETWEEN TWO INACCESSIBLE POINTS USING TOTAL 13 35 STATION