OFFICE OF THE PRINCIPAL

GOVERNMENT POLYTECHNIC SURAJPUR


(Consultancy Cell- Department of Civil Engineering)
No………………/GPS/Civil Cosnl./Test/2022 Surajpur,
Date…………………
Concrete Cube Test
Report No/Bill No:- Date of Report:
Vendor Name: Singh Brother Sample Received date: 05 Days Post construction
Site Name Mentioned with Site ID Date of Casting: Mentioned
Site Detail GBP Age Of Cube: 07 days
Sample Cubes 03 per Site GOC M20

Raft+ column 
Description
S.No Identification of specimen Compressive Average Compressive
of site Date of Casting
strength(N/sq.mm) Strength(N/sq.mm)

1 I-MP-PLGN-ENB-9037/1 12.9
GBP 15-07-21 13.77(07 days)
2 I-MP-PLGN-ENB-9037/2 14.8
3 I-MP-PLGN-ENB-9037/3 13.6

I/c LAB I/c HOD Principal


Govt. Polytechnic Civil Engg. Department Govt. Polytechnic
Surajpur Surajpur
OFFICE OF THE PRINCIPAL
GOVERNMENT POLYTECHNIC SURAJPUR
(Consultancy Cell- Department of Civil Engineering)
No………………/GPS/Civil Cosnl./Test/2022 Surajpur,
Date…………………
Concrete Cube Test
Report No/Bill No:- Date of Report:
Vendor Name: Singh Brother Sample Received date: 05 Days Post construction
Site Name Mentioned with Site ID Date of Casting: Mentioned
Site Detail GBP Age Of Cube: 28 days
Sample Cubes 03 per Site GOC M20

Raft+ column 
Description
S.No Identification of specimen Compressive Average Compressive
of site Date of Casting
strength(N/sq.mm) Strength(N/sq.mm)

1 I-MP-PLGN-ENB-9037/1 21.3
GBP 15-07-21 21.66(28 days)
2 I-MP-PLGN-ENB-9037/2 22.6
3 I-MP-PLGN-ENB-9037/3 21.1

I/c LAB I/c HOD Principal


Govt. Polytechnic Civil Engg. Department Govt. Polytechnic
Surajpur Surajpur
OFFICE OF THE PRINCIPAL
GOVERNMENT POLYTECHNIC SURAJPUR
(Consultancy Cell- Department of Civil Engineering)
No………………/GPS/Civil Cosnl./Test/2022 Surajpur,
Date…………………
Concrete Cube Test
Report No/Bill No:- Date of Report:
Vendor Name: Singh Brother Sample Received date: 05 Days Post construction
Site Name Mentioned with Site ID Date of Casting: Mentioned
Site Detail GBP Age Of Cube: 14 days
Sample Cubes 03 per Site GOC M20

Raft+ column 
Description
S.No Identification of specimen Compressive Average Compressive
of site Date of Casting
strength(N/sq.mm) Strength(N/sq.mm)

1 I-MP-PLGN-ENB-9037/1 16.9
GBP 15-07-21 18.10(14 days)
2 I-MP-PLGN-ENB-9037/2 18.7
3 I-MP-PLGN-ENB-9037/3 18.7

I/c LAB I/c HOD Principal


Govt. Polytechnic Civil Engg. Department Govt. Polytechnic
Surajpur Surajpur