Professional Documents
Culture Documents
Statue N
Sheraton Hotel
To Brigade Gateway/
FENCING
HT PNL
front
MTR
HT
TRANSFORMER -1
0
2
6
2000KVA OLTC
RMU
front
HT YARD
LT BR
front
FENCING
FENCING
ON TW
I
CT BM:100.00 ENTRY
5.80
1-7 No's
U 8-12 No's
19.45
43-47 No's
5 & 11
27.00
10
an Strip
0.50m Pedestri
LEGEND
an Strip
0.50m Pedestri
6.00
57.89 INTERNAL BARRICADE
an Strip
0.50m Pedestri 4.7
18.75
0
8
2.3
an Strip
CONE BARRICADE
0.50m Pedestri
4.7 18.17
0 33.76
0
4.7 BUILDING LINE
2.5
0
4.30
Surface Drain
7
Service Road
MOVABLE BARRICADE
18.41
2.70
5.80
48-52 No's
LEGEND
RICADE
3.95 TERNAL BAR
Parking Lot IN L&W STAFF OFFICE
1 (TEMPORARY)
3.50
3 TOILET
9.89m
36.14
SAFETY INDUCTION ROOM
4 (FIRST FLOOR)
6.00
rking
5 WORKER TOILET
58-62 No's
trian Strip
trian Strip
Building
6 STORE ROOM (GROUND FLOOR)
1.25m Pedes
for Two-wheeler
9 DG YARD
10 CONTROL PANEL
R KING AREA
EXISTING PA
73-77 No's
13.52 CLIENT :
21.87
RRICADE
78-82 No's
INTERNAL BA
STRUCTURE DESIGN & MEP CONSULTANTS :
Parijatha G
24.51
DESIGN AND BUILD CIVIL & STRUCTURAL CONTRACTOR :
83-87 No's
.0
0
1.25m Pedes
4
88-92 No's
&
1.25m Pedes
OFFICE AREA
(254.68m2)
ateway Hot
93-97 No's
PROJECT TITLE :
15.30
COMMERCIAL TOWER
20.38
&
2.64
2
98-102 No's
one Area
6.00
i r c as e 4 .0 m W id e P e d estrian Z
Sta
3
5.89
4.00
y
Zone Are a
en nce
tra
PHASE -1
R/shutter
CONSTRUCTION OF
el
4.71
Emergency
3.50
Exit
trip
1.72
EA
Bollards
S
1.5m Pedestrian
1-5 No's
LOADING AR
15.00
6-10 No's
Sree Parijat
Emergency
y
6.00m wide Drivewa
Exit
Metro Flyover
I n d ia P v t . L td.
Carry
TROLLEY AREA
as h &
16.11
M et r o C
(80.99m2)
EA
ha Tiles
Strip
Emergency
LOADING AR
4.81
10.15m
1.5m Pedestrian
Exit
45.00
y
6.00m wide Drivewa
TROLLEY AREA
Ra
(144.30m2)
mp
29.40
t oM
Ka
etr
rab
STP
oS
tat
5.00
ion
ST
4.98
P
door
DG
5.00
y
6.00m wide Drivewa
TROLLEY AREA
Staircase
16.36
17.92
(91.10m2)
Loading Bay
DG
1.62
4.84
6.7X2.13
TAURUS
m
EX
Transformer
.2
24
6.7X2.13
IT
TAURUS
24m
TW
EX
IT
DRAWING TITLE :
Park Transformer
DEALT : SUNIL CHECKED : SUNIL
REVISION NO : R1