Date: 13 th Aug 2022

EPC Contractor:

Sinohydro Corporation Limited (SCL)


18th Floor, Grand Tower, King Fahd Road,
P.O. Box: 53337, Riyadh 12363, Kingdom of Saudi Arabia

Powerchina International Group Limited (PIGL)


Room 801, Floor 8, Building 23, Courtyard 17,
Xicui Road, Haidian District, Beijing, People's
Republic of China

Attention: Mr. Yang Choa, Contractor Representative

Project: East West’s Residential Compounds for Pump Stations (PS1, PS3, PS5,
PS6 & PS10) and Pressure Reduction Station 1 (PRS1) in the East West
Pipelines Corridor in the Kingdom of Saudi Arabia

Budget Nos.: 1) BI-10-01810 (PS1, PS5 & PRS1)


2) BI-10-03097 (PS3, PS6 & PS10)

Reference:

Subject: Pos With Out MTA

Dear Sir,

As Per the Approved Procurement Plan Pls. be Informed that the Contractor ( EPC)
shall ensure to get the Material Technical approval from Owner prior to award any
PO or Contract.
Any PO which is Awarded without the Material Technical approval from Owner will
be on the Contractor Risk .
Regards,

Mohammad Assaf

Project Director

Response Required: Yes

Enclosure/s: Annexure 1.0:


1.1 Attachment No.01 Slippage Report for Procurement
1.2 Attachment No.02 Critical Path Activities

Cc: Hussein Saad – SPV – General Manager


Mohammed Zakir Ali – PMC Contracts Specialist
Mojahid Kilani PMC- Planning Engineer