Project Name

CHECK SHEET FOR:


ACRYLIC RUBBER FILLED COATING – SP2 Form No. :

SUBCONTRACTOR CONTRACTOR Rev. No. : 00


 Page : 1 of 1

Section of Work: CIVIL – SITE WORKS Location:


Level:

Checked by Checked by
STAGE ITEM DATE
CONSULTAN
S/C CONT.
T

Sub-Contractor/ - Sub-Contractor / Supplier approval.


Sup Approval

Material Approval - Approved materials are being used.

Incoming material - Material is handled and stored as per manufacturer


inspection recommendations.
- Check access permission, equipment and
Preliminary
scaffolding permission.
activities
Surface preparation - Substrate is sound, dry, clean, smooth & free of
moisture, dirt and grease.
- Existing coating, cleaned, smoothened to receive
the primer.

In process - Materials are being verified before application


Inspection / (MVR).
Execution - Materials are being thoroughly mixed before
application.
- Application is done under adequate light.
- Temperature and humidity ranges should be as per
manufacturer recommendations
- Each coat is being dried before following coat is
applied.
- Individual coat is being applied in strict accordance
with manufacturer’s instructions.
- Check each coat free of imperfections such as runs,
patchiness, pinholes, misses etc.
- Color to be homogeneous and no visible patches.
- Check drying time

For S/C: Date: For CONTRACTOR QA/QC: Date For CONSULTANT Rep. Date:

Name: Sign: Name: Sign Name Sign: