REGIONAL OFFICE GUWAHATI
Natlonal Highways & astute Derlopent Cop g
tn ecregetgeee amd, ae
soa raion Ba Tm gunman |
Se tian ms AMEDD
RO-NEIPRILI22IZ07 92 ‘ais: 19.10.2022
te,
Ai cu m6 sot |
Psa Coa |
Sub: Consultancy Services for Autharity’s Engineer for supervision of - Replacement of
Personnel - Reg.
Ref: HO, NHIDCL’s letter No NHIDCL/Manipur/I-J (Pkg 1,2,3) & IrangBridge/AE/2021/1908
ated 17.10.2022 (ccpy enclosed)
lea,
Please refer to HQ, NHIDCL’s letter dated 17.10.2022, elted under reference in the
subject cited matter.
2. Inthis regard, the following has been directed by the HO, NHIDCL, with regards to the
replacement CVs on INFRACON PORTAL:
“The selection ef Key Personnel for replacement should be made from those
personnel who are under Green/Grey category only and the personnel falling under
Red, Amber or those whose verification are pending or yet to be verified should not
bbe considered for replacement to avoid delays”
2.1 Further, a certificate to this effect is to be invariably appended by the Authorized
Signatory of the AE with the replacement proposal, falling which the replacement proposal
‘may not be entertained. The same to be ensured by PMU.
3. me onan Par (aR) eta sien, ereTE] B orphan wert FHA AAT
weal
oa
.
All Authority's Engineer under RO- Guwahati, Assam - for necessary action w.r-t. HQ, NHIDCL
letter dated 17.10.2022,
Floor, PTV Bling & Patiamnent Sree, New Dai-170007casa rorirt ed sree Roar Prem fais
ep eye a a wr OT
ret en ea or ae et
Nationa Highways & Infrastructure Development Corporation Limits
nyt Yep Hons Grn oamre
Fanci batrg Petar Se Nor e100 20616, wean Pasa
‘ne wstonoLz0 eco?
NHIDCL/Manipur/-J (Pkg-1,2,3)BlrangBridge/AE/2021/ 190 8 eate:17.10.2022
195446
To,
Executive Director (P),
2nd Floor, Agnishanti Business Park,
‘Opp. AGP Office, GNB Road, Ambart
‘Guwanati-781001
Sub: Consultancy services for Authority's Engineer for Supervision of - Replacement
of personnel reg.
sir,
The background checks of the Key personnel registered has been initiated by
INFRACON teams and on the basis of these checks the Key personnel have been rated
25 Green, Grey, Amber and Red Category depending on the nature and severity of the
shortfalls in the checks.
2. _ In view of the above, It is requested that all the Authority Engineers may kindly
be requested to ensure “the selection of Key personnel for replacement should be
made from those personnel whe are under Green/Grey category only and the
personnel falling under Red, Amber or those whose verification are pending or yet
{o_be verified’ should not be considered for replacement to avold delays.
3, This i issued with the approval of the Competent Authority.
(ae
Mote
Tao
(Kc. Bhatt)
Dy. General Manager ()