You are on page 1of 1
Amecc Fogether bull tomorrow Issued Dept/ Bon vj ban hanh: PM Date/ Ngdy: /2022 1, Project information/ Thing tin die én Contract No / Hop déng s6:V0014471 Project Name/ Tén due An: Batangas CCPP Project Assigned No: Sé dic An: F0160 WORK ORDER GIAY GIAO NHIEM VU WO Nol Sé :PM-F0160-01 Item/Hang muc: Canopy 2. Project scope of work/ Pham vu céng vige > = Cung cdp vét tu, gia céng ché tao. - Son hoain thién - Dong kién & Dong container - Giao hing FAS 3. Project Weight:/ Khdi licong cdng viée: 108 tdn. Client Khéich hang: Vogt Power International 4. Project schedule/ Tién dé yéu cdu cia dy dn: Theo bang tién dé chi tiét dinh kém. 5. Assigned Work schedule As following / Tién d6 cong vige duoc phan giao nue sau No! Scope of work/ Dept in Charge Schedue Remark sé Pham vi cong viée Dan vi phu irdch Tién a6 Ghi chit 1 [Engineering / Thiét ké thi cong DE 1813/2022 - 31/03/2022| ff VT Hook [Quality Documents Submission / Hoan thign . “| 25 leer nent es OA Dep't 18/3/2022 - 31/03/2022 [Fae rs 3. [Material Delivery / Mua sim vat te PLBs 10/4/2022 - 31/3/2022 4 (aay Lg 4 |Cuttings / Pha edt CUTING CENTER 01/6/2022 - 06/6/202. [yoo Thy Hr 5 _ | Fabrication / Gia céng ché tg0 FACI 02/6/2022 - 11/7/2022) Tolar on) 6 Painting & Packing/Son va déngkign | PAINTING CENTER os/7/2022 - 03/8/2022) [fd Prepared By/ Chuan bj Reviewed By/ Xem xét Approved By/ Phé duyét (Project Engineer) (PM Manager) (Vice Presedent) 9 vo ws i p / BM_016.02 F-PU-002-3 Rev.4 (12-Nov-18)

You might also like