You are on page 1of 1
Amec Cc WORK ORDER Together bud tomorrow GIAY GIAO NHIEM VU Issued Dept/ Don vj ban hanh: PM WO Nol Sé :PM-F0172-01 Date/ Ngay: 13/06/2022 1. Project information/ Théng tin die én Contract No / Hop déng s6:V0014637 Item/Hang mue: Pipe Support Client’ Khdch hang: Vogt Power Project Name/ Tén die An: Batangas CCPP ie atOneL Project Assigned No: Sé die An: F0172 2. Project scope of work/ Pham vu céng viée : - Cung cdp véit tu, gia cng ché tao. - Son hoa thign - Dong ki¢n & Déng container - Giao hang FAS 3. Project Weight:/ Khdi luong cong viée: 54 tdn. 4, Project schedule/ Tién d6 yéu edu ctia dee din: Theo bang tién dé chi tiét dinh kém. 5. Assigned Work schedule As following / Tién d6 céng viée dirge phan giao nhue sau No? ‘Scope of work! Dept in Charge Schedue bt Pham vi cone vige Bon viphu mach Tién dp 1 [Engineering / Thit ké thi cong DE 13/6/2022 - 02/7/2022 (Quality Documents Submission / Hodn thi , 7 2) |eraurack in OA Dep't 13/6/2022 - 25/6/2024 3. [Material Delivery Mua sim vat ue PLBs 171612022 - 02/7/2022 4 |cuttings / Pha oft CUTING CENTER arma orev iP alee wlHar 5 |Fabrication / Gia cng ché tg0 FACI s7/2022 - o1/sr2027 Che — b 6 Pointing & Pocking/Somvadéoghitn | PaivrinGcenTeR | 25/7/2022 19882022] Dug? |} Prepared By/ Chua bi Reviewed By/ Xem xét Approved By/ Phé duyét (Project Engineer) (PM Manager) (Vice Presedent) bo re : ‘ yl WV. . F-PU-002-3 Rev.1 (12-Nov-18) BM_016.02

You might also like