You are on page 1of 24

PROGRAM OF WORKS

CODE DESCRIPTION
O1 GENERAL JANUAR
W1 W2
1 2 3 4 5 6 1 2 3
TEMPORARY FACILITIES
Temporay storage
Temporary CL fencing, 1.50m H
Temporary Power
Electricity
Water
Temporary Plumbing/toilet
O2 SITE WORK
SITE PREPARATIONS
Clearing, Layout & Staking
EARTHWORK
Excavation work
Filling Materials, Grading, Compaction
Gravel Bedding, boulders
PIPE UTILITY MATERIALS
Catch Basin, PVC sewer pipe, water pipe
TERMITE CONTROL WORKS
Soil poisoning
O3 CONCRETE
FORMWORKS, CONCRETE & REINFORCEMENTS

Foundation
reinforcing steel
concrete
Footing Tiebeam
reinforcing steel
concrete
Columns
formworks
reinforcing steel
concrete
Grade Beams
formworks
reinforcing steel
concrete
Ground Floor Columns
formworks
reinforcing steel
concrete
Second Floor Beams, Girders and Slab
second floor slab
formworks
reinforcing steel
concrete
Second Floor Columns
formworks
reinforcing steel
concrete
Roof Beam
formworks
reinforcing steel
concrete
stairs
formworks
reinforcing steel
concrete
O4 MASONRY
UNIT MASONRY
Standard 4" Concrete Masonry Wall
Standard 6" Comcrete Masonry Wall
Plastering, Plain Cement
O5 METALS
Roof Truss & Roof
fabrication of roof truss
installation of roof insolation
installation of roof
METAL FABRICATIONS (Railings, Stainless)
Handrails, Wall Type, 1-1/2 in Rail
O6 WOOD
FINISH CARPENTRY
Costum Cabinets, Wall, Accessories
O7 THERMAL AND MOISTURE
DAMPPROOFING & WATERPROOFING
ROOF AND DECK
Roof Deck Water proofing, Cr, Balcony
O8 DOORS AND WINDOWS
METAL DOORS, GLASS AND FRAMES
METAL WINDOWS, GLASS, Complete
O9 FINISHES
CEILING & SUPPORT SYSTEMS
Ceiling
WALL FINISHES
Decorative Wall
FLOOR, KITCHEN, WALL FINSHES
PAINTING PREPARATIONS
Wall water Proofing
PAINT INTERIOR
Paint, walls
Paint, ceilings
Paint, cabinets, decorative wall
PAINT EXTERIOR
Paint, walls
FLOOR FINISHES
Ground Floor
Second Floor
Third Floor
Fourth Floor
10 SPECIALTIES
TOILET AND BATH ACCESSORIES
11 PLUMBING

Pipes & Fittings


installation of bathromm fixtures
installation of kitchen fixtures
12 ELECTRICAL
roughing -ins
Circuit breaker
conductors
pvc pipes, boxes
devices
lamps
JANUARY FEBRUARY
W2 W3 W4 W1 W2 W3
4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2
BRUARY MARCH
W3 W4 W1 W2 W3 W4
3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1
MONTHS
APRIL
W4 W1 W2 W3 W4
2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
MONTHS
MAY
W1 W2 W3 W4 W1
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5
JUNE JULY
W1 W2 W3 W4 W1 W2
6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4
JULY AUGUST
W2 W3 W4 W1 W2 W3
5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3
UST
W3 W4
4 5 6 1 2 3 4 5 6

You might also like