You are on page 1of 1

Bill of Quantities

1 Provisional Sum
Procument Item Details

SL.
Item Description Unit Quantity Unit Rate(NPR) Amount(NPR)
No

1 Insurance Premium for work & materials as per PS 1.0 30000.0 30,000.00
requirement & intructions os Site Engineer
2 Provisional sum for Unforseen works as instructed by PS 1.0 200000.0 200,000.00
the Engineer.
3 Provisional sum for Carrying out Various Material PS 1.0 20000.0 20,000.00
Testing works out side and inside the construction site
testing for quality control of works as per instructed by
the Engineer.
4 Providing of Project Information Sign Board ( Size PS 1.0 2000.0 2,000.00
3'*4') including all project informations and Regulatory
Sign boards as per requirements all complete.
2 Construction work
2.1 Road Construction Work

2.1.1 Structures (Retaining Wall Structure Side Drains Cross Drainage Structure including Protection Work

Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Retaining Wall :
Roadway excavation in all types of
soil as per drawing and technical
1 specification, including removal of Cum. 138.59
stumps and other deleterious matter,
with all lifts and lead as drawing and
instruction of engineer. (DoR SS 905)
Providing, laying, spreading and
compacting embankment with borrow
2 Cum. 558.0
material as per Drawing and Technical
Specifications.(DoR SS 909, 910)
Filling by stones in the foundation and
3 levelling including haulage distance Cum. 15.31
upto 30m.
Providing and laying Plum concrete (
Boulder mixed concrete) as per
4 Drawing and Specifications 60% M Cum. 423.34
15 concrete and 40% boulders/stones .
(DoR SS 2421)
Providing , Preparing and Installing
form work including necessary
supports and removing after
5 Sqm. 612.5
completion for foundation and
footings.(Class F1 Finish) Using
timber (soft wood )
Total of Procument Items
Total Item Price

VAT

Grand Total