1 Provisional Sum
Procument Item Details
SL.
Item Description Unit Quantity Unit Rate(NPR) Amount(NPR)
No
1 Insurance Premium for work & materials as per PS 1.0 30000.0 30,000.00
requirement & intructions os Site Engineer
2 Provisional sum for Unforseen works as instructed by PS 1.0 200000.0 200,000.00
the Engineer.
3 Provisional sum for Carrying out Various Material PS 1.0 20000.0 20,000.00
Testing works out side and inside the construction site
testing for quality control of works as per instructed by
the Engineer.
4 Providing of Project Information Sign Board ( Size PS 1.0 2000.0 2,000.00
3'*4') including all project informations and Regulatory
Sign boards as per requirements all complete.
2 Construction work
2.1 Road Construction Work
2.1.1 Structures (Retaining Wall Structure Side Drains Cross Drainage Structure including Protection Work
VAT
Grand Total