1. Understand the concept of how footing and column made in the construction;
2. Determine how to estimate the concrete, formworks, and reinforcement bars of footing and
column;
3. Apply the prices or costing based on the result of estimates; and
4. Use this knowledge in civil engineering field.
• By Volume Method
combined
FORMWORKS
• By Area Method
estimates are:
Splicing Location
2. Lateral Ties
3. Tie Wire
4. Formworks