Date Work done

Training on floor, Study of component using PPTs on mobile


22 Aug- 9 Sep We had meeting (Tillon
9 sept I don’t
project Vidhaget, my pc or
In that laptop)
I got my scope of
think
(PMSM,MCU , Charger, Dymola, Solid state battery , Library). I
9-Sep started workingprinciple
Study Working on theseof topic.
PMSM, Advantage of PMSM ,Why
we
10-Sep are using PMSM ?
11-Sep Study on Torque and power
Construction calculation
of PMSM (Sailentofpole
motor (derivation)
or Cylindrical
pole),
12-Sep Induced emf Torque speed characterstics
13-Sep LV wiring harness( Coupler) comperision between UP and DMRC
Made the list of all Hv connectors with images, Basic study on
14-16Sep solid state battery
19-Sep HV component list with part number for sticker development
Study of traction force acting on a vehicle (Rolling force,Gradient
20-Sep force and aerodynamic drag force)
Calcultation of rolling force ,Gradient force, Aerodynamic drag
for
our bus according to it power calculation, Motor Test report
21-Sep study
Study of MCU & understanding connection of mcu on floor,
22-Sep verification of DMRC part number from Store
Control Technology of Motor (FOC), For library searched some
23-Sep books
24-Sep Study on Chargers(GB/T, CCS2, cademo, Chaoji, BES)
Dymola training, Revision of Training, verification of remening
26-Sep DMRC part number from Store
27-Sep Dymola Training, Study on PPt which is provided by Dymola
28-Sep Understanding concept
Study on Passanger of battery cooling
Ac (Compersion b/w oldusing dymola
JTEC, ppt
new JTEC),
Fuse
29-Sep Distribution box Compersion
Practice on Dymola, making the component list chnge from
30-Sep china