This document summarizes the workload of biomedical equipment at RSUD Pandan Arang Hospital in Boyolali Regency, Central Java, Indonesia in 2016. It lists 29 types of equipment, the number of each type, and the estimated workload in hours for safety testing, preventative testing, performance testing, and calibration testing on a yearly basis. The total estimated workload across all equipment and testing categories was over 5,000 hours for the year.
This document summarizes the workload of biomedical equipment at RSUD Pandan Arang Hospital in Boyolali Regency, Central Java, Indonesia in 2016. It lists 29 types of equipment, the number of each type, and the estimated workload in hours for safety testing, preventative testing, performance testing, and calibration testing on a yearly basis. The total estimated workload across all equipment and testing categories was over 5,000 hours for the year.
This document summarizes the workload of biomedical equipment at RSUD Pandan Arang Hospital in Boyolali Regency, Central Java, Indonesia in 2016. It lists 29 types of equipment, the number of each type, and the estimated workload in hours for safety testing, preventative testing, performance testing, and calibration testing on a yearly basis. The total estimated workload across all equipment and testing categories was over 5,000 hours for the year.
Preventive test : 0.712983380149813 Performance test : 0.712983380149813 Calibration test : 0.712983380149813 Total kebutuhan : 3 Boyolali , 16 Mei 2016 Kepala IPSRS
Danang Adi Prabowo
DATA PERHITUNGAN BEBAN KERJA RSUD PANDAN ARANG KABUPATEN BOYOLALI TAHUN 2016
Local Water Utilities Administration Binalonan Water District KFW Project Binalonan, Pangasinan Implementation Schedule Item Work Item Total Amount WT (In %) For Release Month 1