The vision of the project is to develop a web based software system which provides

a platform to conduct and offer various online mock examination relating to fields
such as academic, recruitment, & certification exams etc, on the system to the end
users like students for purchase as well as related learning courses for those
exams which will be offered by the partnered institutes and their instructors on
the same system. The students would also be able to purchase study materials
available like eBooks, pre-recorded instructional videos, previous year papers with
solution etc, on the system for the tests subjects & their topics in order to fully
understand the concepts of the subjects.

The reasoning behind developing such a system was the conventional way of exam
preparation is very time consuming, as the institutional staff has to prepare bunch
of exam questionnaire and that includes too much paperwork. The students must also
prepare things like stationeries etc and other necessities that are needed in
taking the exam. The manual way of taking the mock examination is inefficient and
not convenient for both parties

To address the aforementioned problems, the aim is to design and develop a platform
for fast and efficient way to prepare for, conduct mock tests and access to study
materials. The proposed solution is to have computer-assisted mock tests & various
course enrollment options for the users. The mock tests will be web based; the
staff in-charge will not prepare a lot of examination papers anymore. The students
also will not need to prepare things like pens and other. They will only utilize
the system to take their mock examination based on their courses & purchased items.
If the students also are still undecided as to what course they would enroll in,
they can also use the system to browse for course recommendation. This system will
improve the conventional way of conducting mock tests and its preparation.

This document is intended to give a detailed technical overview of the online


practice software project. It does not, however, explain the project standard
itself, or the rationale behind the implementation or standard
PROJECT OVERVIEW

The purpose of this project is to design, develop, and deliver a training that is
to be completed by customer service supervisors and operators prior to an upcoming
catalog mailing. This face-to-face training program will replace a prior
instructor-led training program, which was designed and delivered by one of the
individuals who will serve as a subject matter expert for this project. A $400,000
budget has been set for the project, with an end goal of increasing sales. PJE
goals include a net profit increase of $2 million that will require aggressive
growth, primarily through a focus on work environment, staff development, and
customer service. Phase one of this project was an extensive front-end analysis
that incorporated qualitative and quantitative research. Training has been deemed
to be an appropriate solution to some of the needs assessed; therefore, ID
Solutions will work with appropriate stakeholders, including SMEs, to develop,
design, and implement a training program. Following implementation, ID Solutions
will evaluate the training solution, seek client feedback, re-assess needs and
revise as appropriate. ID Solutions will create a training module template for the
launch of new products and catalogs to assist TOs in becoming better-informed about
products and quicker response the telephone orders. The template will be
customizable, allowing PJE to update the template as products are discontinued and
new products are introduced
We are engaged in a procurement process for a new practice management system (PM
system) for our clinics and health centers. The new system will replace the
current PM system. This system has served us well but has several significant
limitations. It has been recently concluded that further investment in the current
PM system should cease and an integrated PM system from an established vendor be
procured to replace it. We have also identified a need to develop the internal
IS/IT resources required to manage and operate the new system.
The goals set for this project are to have a signed contract for new PM system on a
tightly controlled time line, and to have begun the process of building the
internal capacity to successfully implement, manage, and operate the system into
the future. We have engaged consultants to design and participate in a project to
select PM system and contract with a vendor in this time frame. To accomplish
these goals, the project will require:
• Commitment from project stakeholders including organizational management,
clinic management, project team, and technology staff

Considering the need for continuity and to rein in the losses of the utilities,
need was felt to continue
the initiative of APDRP in 11th plan as well. On review of the status and benefits
achieved of APDRP,
it was felt that to have sustainable distribution business, it is essential to give
impetus to IT enabling of
the sector on an integrated platform. The IT platform shall assist in capturing and
validating the
energy and revenue model to gather in a transparent manner with accuracy.
Considering the difficulties of domain expertise in IT area of the utilities and
the experiences the
utilities had, it was considered necessary to prepare SRS template, which shall
provide the IT
infrastructure for drawing the baseline data while addressing the need of IT back
bone in the area of
distribution business process to capture the benefits of the investments on
sustainable basis.
2 INTENT OF SPECIFICATION
The vision of the project is to develop a web based software system which provides
a platform to conduct and offer various online mock examination relating to fields
such as academic, recruitment, & certification exams etc, on the system to the end
users like students for purchase as well as related learning courses for those
exams which will be offered by the partnered institutes and their instructors on
the same system. The students would also be able to purchase study materials
available like eBooks, pre-recorded instructional videos, previous year papers with
solution etc, on the system for the tests subjects & their topics in order to fully
understand the concepts of the subjects.

The purpose of this project is to design, develop, and deliver a training that is
to be completed by customer service supervisors and operators prior to an upcoming
catalog mailing. This face-to-face training program will replace a prior
instructor-led training program, which was designed and delivered by one of the
individuals who will serve as a subject matter expert for this project. A $400,000
budget has been set for the project, with an end goal of increasing sales. PJE
goals include a net profit increase of $2 million that will require aggressive
growth, primarily through a focus on work environment, staff development, and
customer service. Phase one of this project was an extensive front-end analysis
that incorporated qualitative and quantitative research. Training has been deemed
to be an appropriate solution to some of the needs assessed; therefore, ID
Solutions will work with appropriate stakeholders, including SMEs, to develop,
design, and implement a training program. Following implementation, ID Solutions
will evaluate the training solution, seek client feedback, re-assess needs and
revise as appropriate. ID Solutions will create a training module template for the
launch of new products and catalogs to assist TOs in becoming better-informed about
products and quicker response the telephone orders. The template will be
customizable, allowing PJE to update the template as products are discontinued and
new products are introduced
The reasoning behind developing such a system was the conventional way of exam
preparation is very time consuming, as the institutional staff has to prepare bunch
of exam questionnaire and that includes too much paperwork. The students must also
prepare things like stationeries etc and other necessities that are needed in
taking the exam. The manual way of taking the mock examination is inefficient and
not convenient for both parties

To address the aforementioned problems, the aim is to design and develop a platform
for fast and efficient way to prepare for, conduct mock tests and access to study
materials. The proposed solution is to have computer-assisted mock tests & various
course enrollment options for the users. The mock tests will be web based; the
staff in-charge will not prepare a lot of examination papers anymore. The students
also will not need to prepare things like pens and other. They will only utilize
the system to take their mock examination based on their courses & purchased items.
If the students also are still undecided as to what course they would enroll in,
they can also use the system to browse for course recommendation. This system will
improve the conventional way of conducting mock tests and its preparation.

This document is intended to give a detailed technical overview of the online


practice software project. It does not, however, explain the project standard
itself, or the rationale behind the implementation or standard
PROJECT OVERVIEW

We are engaged in a procurement process for a new practice management system (PM
system) for our clinics and health centers. The new system will replace the
current PM system. This system has served us well but has several significant
limitations. It has been recently concluded that further investment in the current
PM system should cease and an integrated PM system from an established vendor be
procured to replace it. We have also identified a need to develop the internal
IS/IT resources required to manage and operate the new system.

The goals set for this project are to have a signed contract for new PM system on a
tightly controlled time line, and to have begun the process of building the
internal capacity to successfully implement, manage, and operate the system into
the future. We have engaged consultants to design and participate in a project to
select PM system and contract with a vendor in this time frame. To accomplish
these goals, the project will require:
• Commitment from project stakeholders including organizational management,
clinic management, project team, and technology staff

The end user system will initially need to present a user interface where they can
select the factory they are working at, the checkpoint they are inspecting at, and
the type
of car being inspected. This information is stored on the server alongside the
defect data
that the user inputs later.
Second, another menu will allow users to indicate the location, severity, and type
of defects. This menu will display a wireframe for the selected model of car, that
allows
users to place the defect in the appropriate location on the vehicle.
Lastly, end users will be able to run three types of reports over previously stored
defect data. The first type of report is a QA report, which summarizes vehicle
inspections
over a specific time range, which is chosen by the user when running the report. It
contains all the data stored for the defects over that period, the total number of
cars
inspected, and the defects per unit. It also contains several tables that show an
aggregated
car diagram with locations of all recorded defects, and a pie chart that displays
the ratios
of all defect types over this period.
The end user system will initially need to present a user interface where they can
select the factory they are working at, the checkpoint they are inspecting at, and
the type
of car being inspected. This information is stored on the server alongside the
defect data
that the user inputs later.
The vision of the project is to develop a web based software system which provides
a platform to conduct and offer various online mock examination relating to fields
such as academic, recruitment, & certification exams etc, on the system to the end
users like students for purchase as well as related learning courses for those
exams which will be offered by the partnered institutes and their instructors on
the same system. The students would also be able to purchase study materials
available like eBooks, pre-recorded instructional videos, previous year papers with
solution etc, on the system for the tests subjects & their topics in order to fully
understand the concepts of the subjects.

The reasoning behind developing such a system was the conventional way of exam
preparation is very time consuming, as the institutional staff has to prepare bunch
of exam questionnaire and that includes too much paperwork. The students must also
prepare things like stationeries etc and other necessities that are needed in
taking the exam. The manual way of taking the mock examination is inefficient and
not convenient for both parties

To address the aforementioned problems, the aim is to design and develop a platform
for fast and efficient way to prepare for, conduct mock tests and access to study
materials. The proposed solution is to have computer-assisted mock tests & various
course enrollment options for the users. The mock tests will be web based; the
staff in-charge will not prepare a lot of examination papers anymore. The students
also will not need to prepare things like pens and other. They will only utilize
the system to take their mock examination based on their courses & purchased items.
If the students also are still undecided as to what course they would enroll in,
they can also use the system to browse for course recommendation. This system will
improve the conventional way of conducting mock tests and its preparation.

This document is intended to give a detailed technical overview of the online


practice software project. It does not, however, explain the project standard
itself, or the rationale behind the implementation or standard
PROJECT OVERVIEW

We are engaged in a procurement process for a new practice management system (PM
system) for our clinics and health centers. The new system will replace the
current PM system. This system has served us well but has several significant
limitations. It has been recently concluded that further investment in the current
PM system should cease and an integrated PM system from an established vendor be
procured to replace it. We have also identified a need to develop the internal
IS/IT resources required to manage and operate the new system.

The goals set for this project are to have a signed contract for new PM system on a
tightly controlled time line, and to have begun the process of building the
internal capacity to successfully implement, manage, and operate the system into
the future. We have engaged consultants to design and participate in a project to
select PM system and contract with a vendor in this time frame. To accomplish
these goals, the project will require:
• Commitment from project stakeholders including organizational management,
clinic management, project team, and technology staff

Second, another menu will allow users to indicate the location, severity, and type
of defects. This menu will display a wireframe for the selected model of car, that
allows
users to place the defect in the appropriate location on the vehicle.
Lastly, end users will be able to run three types of reports over previously stored
defect data. The first type of report is a QA report, which summarizes vehicle
inspections
over a specific time range, which is chosen by the user when running the report. It
contains all the data stored for the defects over that period, the total number of
cars
inspected, and the defects per unit. It also contains several tables that show an
aggregated
car diagram with locations of all recorded defects, and a pie chart that displays
the ratios
of all defect types over this period.
The second report is a Summary of Analysis report, which is a numeric summary
of defects over a given period that were entered by a specific analyst. The user
running
the report is able to specify the date range to run the report on. This report
contains the
shift the analyst was on, the check point being inspected, and a summary of the
number
of defects, number of units, and number of defects per unit.
The end user system will initially need to present a user interface where they can
select the factory they are working at, the checkpoint they are inspecting at, and
the type
of car being inspected. This information is stored on the server alongside the
defect data
that the user inputs later.
Second, another menu will allow users to indicate the location, severity, and type
of defects. This menu will display a wireframe for the selected model of car, that
allows
users to place the defect in the appropriate location on the vehicle.
Lastly, end users will be able to run three types of reports over previously stored
defect data. The first type of report is a QA report, which summarizes vehicle
inspections
over a specific time range, which is chosen by the user when running the report. It
contains all the data stored for the defects over that period, the total number of
cars
inspected, and the defects per unit. It also contains several tables that show an
aggregated
car diagram with locations of all recorded defects, and a pie chart that displays
the ratios
of all defect types over this period.
The second report is a Summary of Analysis report, which is a numeric summary
of defects over a given period that were entered by a specific analyst. The user
running
the report is able to specify the date range to run the report on. This report
contains the
shift the analyst was on, the check point being inspected, and a summary of the
number
of defects, number of units, and number of defects per unit.

The second report is a Summary of Analysis report, which is a numeric summary


of defects over a given period that were entered by a specific analyst. The user
running
the report is able to specify the date range to run the report on. This report
contains the
shift the analyst was on, the check point being inspected, and a summary of the
number
of defects, number of units, and number of defects per unit.
2.1 This specification intends to cover the following activities, services and
works in respect of
successful set up of IT infrastructure for collection of baseline data for energy
and revenue of
the identified scheme areas (town) and setting up of customer care center in the
towns along
with supply, installation, testing and commissioning of all necessary hardware,
software and
managing the facilities created under the scope of work for a period of 5 years
after successful
completion of acceptance test of hardware and software. Detailed scope of work
under this
package is listed at clause 3.0.
Considering the need for continuity and to rein in the losses of the utilities,
need was felt to continue
the initiative of APDRP in 11th plan as well. On review of the status and benefits
achieved of APDRP,
it was felt that to have sustainable distribution business, it is essential to give
impetus to IT enabling of
the sector on an integrated platform. The IT platform shall assist in capturing and
validating the
energy and revenue model to gather in a transparent manner with accuracy.
Considering the difficulties of domain expertise in IT area of the utilities and
the experiences the
utilities had, it was considered necessary to prepare SRS template, which shall
provide the IT
infrastructure for drawing the baseline data while addressing the need of IT back
bone in the area of
distribution business process to capture the benefits of the investments on
sustainable basis.
2 INTENT OF SPECIFICATION
2.1 This specification intends to cover the following activities, services and
works in respect of
successful set up of IT infrastructure for collection of baseline data for energy
and revenue of
the identified scheme areas (town) and setting up of customer care center in the
towns along
with supply, installation, testing and commissioning of all necessary hardware,
software and
managing the facilities created under the scope of work for a period of 5 years
after successful
completion of acceptance test of hardware and software. Detailed scope of work
under this
package is listed at clause 3.0.
Considering the need for continuity and to rein in the losses of the utilities,
need was felt to continue
the initiative of APDRP in 11th plan as well. On review of the status and benefits
achieved of APDRP,
it was felt that to have sustainable distribution business, it is essential to give
impetus to IT enabling of
the sector on an integrated platform. The IT platform shall assist in capturing and
validating the
energy and revenue model to gather in a transparent manner with accuracy.
Considering the difficulties of domain expertise in IT area of the utilities and
the experiences the
utilities had, it was considered necessary to prepare SRS template, which shall
provide the IT
infrastructure for drawing the baseline data while addressing the need of IT back
bone in the area of
distribution business process to capture the benefits of the investments on
sustainable basis.
2 INTENT OF SPECIFICATION
2.1 This specification intends to cover the following activities, services and
works in respect of
successful set up of IT infrastructure for collection of baseline data for energy
and revenue of
the identified scheme areas (town) and setting up of customer care center in the
towns along
with supply, installation, testing and commissioning of all necessary hardware,
software and
managing the facilities created under the scope of work for a period of 5 years
after successful
completion of acceptance test of hardware and software. Detailed scope of work
under this
package is listed at clause 3.0.
Considering the need for continuity and to rein in the losses of the utilities,
need was felt to continue
the initiative of APDRP in 11th plan as well. On review of the status and benefits
achieved of APDRP,
it was felt that to have sustainable distribution business, it is essential to give
impetus to IT enabling of
the sector on an integrated platform. The IT platform shall assist in capturing and
validating the
energy and revenue model to gather in a transparent manner with accuracy.
Considering the difficulties of domain expertise in IT area of the utilities and
the experiences the
utilities had, it was considered necessary to prepare SRS template, which shall
provide the IT
infrastructure for drawing the baseline data while addressing the need of IT back
bone in the area of
distribution business process to capture the benefits of the investments on
sustainable basis.
2 INTENT OF SPECIFICATION
2.1 This specification intends to cover the following activities, services and
works in respect of
successful set up of IT infrastructure for collection of baseline data for energy
and revenue of
the identified scheme areas (town) and setting up of customer care center in the
towns along
with supply, installation, testing and commissioning of all necessary hardware,
software and
managing the facilities created under the scope of work for a period of 5 years
after successful
completion of acceptance test of hardware and software. Detailed scope of work
under this
package is listed at clause 3.0.