Subject : Ultra-sonic Pulse Velocity (UPV) Testing of TG Deck at Senegal Power Plant – Amendment to our

Test Report No. Report No.SCP/2016-17/018

Reference : Your Work Order Ref. SENEGAL-SCP/CVL/WO/NSR/D-1038 Dt. 12-11-2016

Following are the sketches showing the details of doubtful quality of concrete as observed from the UPV Testing

Fig.1 Turbine Deck Outer Face b/w Columns C2-C6


Fig.2 Turbine Deck Outer Face b/w Columns C1-C2 (Towards Columns C1)
Fig.3 Turbine Deck Outer Face b/w Columns C1-C2 (Towards Columns C2)
Fig.4 Turbine Deck Outer Face b/w Columns C1-C2 (Central Portion b/w Columns C1-C2)
Fig.5 Turbine Deck Inner Face b/w Columns C1-C3
Fig.6 Turbine Deck Inner Face b/w Columns C2-C4
Fig.7 Turbine Deck Inner Face b/w Columns C1-C3 (+9.100 Level) Beam
Fig.8 Centre of Turbine bearing #2 Above +7.900(H.P.TURBINE) Side Wall
Fig.9 Centre of Turbine bearing #2 Above +7.900(L.P.TURBINE) Side Wall
Fig.10 Centre of Turbine bearing #3 Above +7.900(L.P.TURBINE) Side Wall
Fig.11 Centre of Generator bearing #4 and #5 Deck O/S
Fig.12 Turbine Deck Inner Face b/w Columns C3-C5
Fig.13 Exciter Deck Outer Face b/w Columns C11-C12