PROJECT / OFFICE: GGC BERTAM DESCRIPTION OF JOB: SCAFFOLDING PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0
LOCATION: BERTAM, KEPALA LEGAL AND OTHER REQUIREMENTS: 1. The Factories & Machinery Act APPROVED BY: GOOI KIAN SHEUN PAGE 1 of 3
BATAS 1967 2. The Factories & Machinery (Building Operations & Works of
Engineering Construction) (Safety) Regulations 1986 3. The Occupational
Safety And Health Act 1994 4. The Occupational Safety And Health
(Safety and Health Officer) Regulations 1997 5. The Occupational Safety
And Health (Safety and Health Officer) Order 1997 6. The Occupational
Safety And Health (Safety and Health Committee) Regulations 1996 7.
Safety, Health and Welfare on Construction Sites A Training Manual,
International Labour Office
NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level
1. Delivery of material NR Mechanical struck minor injury machine operated by competent 2 2 4 committee
loading and unloading by moving part operator
(L) Refer existing control
material damage to
measure
property / worker stay away from moving
utilities machine
NR Physical falling Serious injury machine must operate by 2 3 6 committee
object-during competent operator
(M) Refer existing control
lifting of material
Damage to measure
machine inspection before work
property
commences
2. Stacking / storing NR Physical slip / fall / Serious injury supervised by designated person 2 3 6 committee
material at site/ store collapse of during stacking of material
(M) Refer existing control
material due to
poor material to ensure stability of material measure
arrangement
3. Construction of R Physical worker Serious injury Proper working platform for 3 3 9 committee
scaffolding slip and fall excavator (M) Refer existing control
measure
HSE-P03-02
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)
PROJECT / OFFICE: GGC BERTAM DESCRIPTION OF JOB: SCAFFOLDING PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0
LOCATION: BERTAM, KEPALA LEGAL AND OTHER REQUIREMENTS: 1. The Factories & Machinery Act APPROVED BY: GOOI KIAN SHEUN PAGE 2 of 3
BATAS 1967 2. The Factories & Machinery (Building Operations & Works of
Engineering Construction) (Safety) Regulations 1986 3. The Occupational
Safety And Health Act 1994 4. The Occupational Safety And Health
(Safety and Health Officer) Regulations 1997 5. The Occupational Safety
And Health (Safety and Health Officer) Order 1997 6. The Occupational
Safety And Health (Safety and Health Committee) Regulations 1996 7.
Safety, Health and Welfare on Construction Sites A Training Manual,
International Labour Office
NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level
4. Stripping of R Physical slip and serious injury to used proper platform / ladder 3 3 9 committee
scaffolding fall of person Refer existing control
skill workers to carry out activity (M)
measure
HSE-P03-02
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)
PROJECT / OFFICE: GGC BERTAM DESCRIPTION OF JOB: SCAFFOLDING PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0
LOCATION: BERTAM, KEPALA LEGAL AND OTHER REQUIREMENTS: 1. The Factories & Machinery Act APPROVED BY: GOOI KIAN SHEUN PAGE 3 of 3
BATAS 1967 2. The Factories & Machinery (Building Operations & Works of
Engineering Construction) (Safety) Regulations 1986 3. The Occupational
Safety And Health Act 1994 4. The Occupational Safety And Health
(Safety and Health Officer) Regulations 1997 5. The Occupational Safety
And Health (Safety and Health Officer) Order 1997 6. The Occupational
Safety And Health (Safety and Health Committee) Regulations 1996 7.
Safety, Health and Welfare on Construction Sites A Training Manual,
International Labour Office
NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level
Likely, Occasionally, 3 Major Injury / Major Ill Health / Serious bodily injury or serious work caused ill M MEDIUM (5-12)
Permanent Disability / Lost Time health.
Injury / Occupational Diseases
Very Likely, Monthly 4 Fatality & Property damage Death. H HIGH (15-25)
Most Likely, Frequently, Daily 5 Catastrophic Numerous fatalities, irrecoverable property H HIGH (15-25)
damage and productivity
Description
R ROUTINE
NR NON-ROUTINE
AB ABNORMAL