PROJECT / OFFICE: GGC BERTAM DESCRIPTION OF JOB: LIFTING WORK PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0
LOCATION: LEGAL AND OTHER REQUIREMENTS: 1. The Factories & Machinery Act APPROVED BY: GOOI KIAN SHEUN PAGE 1 of 4
BERTAM, KEPALA BATAS 1967 2. The Factories & Machinery (Building Operations & Works of
Engineering Construction) (Safety) Regulations 1986 3. The Occupational
Safety And Health Act 1994 4. The Occupational Safety And Health
(Safety and Health Officer) Regulations 1997 5. The Occupational Safety
And Health (Safety and Health Officer) Order 1997 6. The Occupational
Safety And Health (Safety and Health Committee) Regulations 1996 7.
Safety, Health and Welfare on Construction Sites A Training Manual,
International Labour Office
NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level
- Comply to legal
1. Mobile Crane PMA R Legal Requirement 2 4 8 4 requirement as per FMA PM,HS
1967. ES,SS
(Medium)
- Checklist crane for
safe operation
2. Check Stability of R Crane Topple Fatality - SWMS & SWP 2 4 8 4 -Check for hydraulic oil PM,HS
level and for leakage.
Ground ES,SS
- Crane Valid PMA (Medium) -No sign of bend or
crack sign on the out
- Competent Operator rigger.
3. Ensure outriggers R Crane Topple Major injury - Crane inspection checklist. 2 3 6 3 PM,HS
are fully extended - Check for hydraulic oil ES,SS
Loss of Load - Inspection on lifting appliances. (Medium)
level and for leakage.
HSE-P03-02
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)
PROJECT / OFFICE: GGC BERTAM DESCRIPTION OF JOB: LIFTING WORK PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0
LOCATION: LEGAL AND OTHER REQUIREMENTS: 1. The Factories & Machinery Act APPROVED BY: GOOI KIAN SHEUN PAGE 2 of 4
BERTAM, KEPALA BATAS 1967 2. The Factories & Machinery (Building Operations & Works of
Engineering Construction) (Safety) Regulations 1986 3. The Occupational
Safety And Health Act 1994 4. The Occupational Safety And Health
(Safety and Health Officer) Regulations 1997 5. The Occupational Safety
And Health (Safety and Health Officer) Order 1997 6. The Occupational
Safety And Health (Safety and Health Committee) Regulations 1996 7.
Safety, Health and Welfare on Construction Sites A Training Manual,
International Labour Office
NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level
6. Check supporting R Loss of Load Major injury -Barrication / signages. -Check wire rope,limit SS,HS
2 3 6 3 switch, hooks and
devices (Medium) ES
latches.
-Proper PPEs
HSE-P03-02
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)
PROJECT / OFFICE: GGC BERTAM DESCRIPTION OF JOB: LIFTING WORK PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0
LOCATION: LEGAL AND OTHER REQUIREMENTS: 1. The Factories & Machinery Act APPROVED BY: GOOI KIAN SHEUN PAGE 3 of 4
BERTAM, KEPALA BATAS 1967 2. The Factories & Machinery (Building Operations & Works of
Engineering Construction) (Safety) Regulations 1986 3. The Occupational
Safety And Health Act 1994 4. The Occupational Safety And Health
(Safety and Health Officer) Regulations 1997 5. The Occupational Safety
And Health (Safety and Health Officer) Order 1997 6. The Occupational
Safety And Health (Safety and Health Committee) Regulations 1996 7.
Safety, Health and Welfare on Construction Sites A Training Manual,
International Labour Office
NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level
for signalling.
-PPEs : safety
Helmet ,safety
shoes,Rigger Gloves.
Description
R ROUTINE
NR NON-ROUTINE
AB ABNORMAL
HSE-P03-02