This document is a safety tools inventory list for a project that includes the name of the project, month/year, and safety officer. It contains a table that tracks the stock levels of various safety tools and equipment from the previous month to the current month, and notes their condition as either good or no good. Some of the safety tools and equipment listed include safety belts, helmets, safety glasses, welding gear, boots, scaffolding parts, ladders, additional scaffolding pipes, clamps, and adjustable bases. The document is to be reviewed by both the site manager and safety officer.
This document is a safety tools inventory list for a project that includes the name of the project, month/year, and safety officer. It contains a table that tracks the stock levels of various safety tools and equipment from the previous month to the current month, and notes their condition as either good or no good. Some of the safety tools and equipment listed include safety belts, helmets, safety glasses, welding gear, boots, scaffolding parts, ladders, additional scaffolding pipes, clamps, and adjustable bases. The document is to be reviewed by both the site manager and safety officer.
This document is a safety tools inventory list for a project that includes the name of the project, month/year, and safety officer. It contains a table that tracks the stock levels of various safety tools and equipment from the previous month to the current month, and notes their condition as either good or no good. Some of the safety tools and equipment listed include safety belts, helmets, safety glasses, welding gear, boots, scaffolding parts, ladders, additional scaffolding pipes, clamps, and adjustable bases. The document is to be reviewed by both the site manager and safety officer.
Bulan / Tahun : ________________________ Safety Officer : ________________________
STOCK STOCK CONDITION
NO NAME SAFETY TOOLS In Out REMARKS Bln lalu Bln ini Good No Good 1 SAFETY BELT 2 SAFETY BELT DOUBLE HOOK 3 SAFETY BODY HARNESS 4 HELMET a. WARNA PUTIH b . WARNA MERAH C. WARNA ABU-ABU 5 KACAMATA SAFETY 6 KEDOK LAS 7 SARUNG TANGAN LAS 8 JAKET LAS 9 SEPATU BOOTH 10 APAR 1 Kg 1,5 Kg 2 Kg 2,5 Kg 3 Kg 3,5 Kg 4 Kg 4,5 Kg 5 Kg 5,5 Kg 6 Kg 11 SCAFOLDING : 1 a .Main Frame b Cross Brace c Arm Lock d. Join Pin 2 a End Frame b Cross Brace C Arm lock d Handrail e Toe Board 3 Catwalk 4 Horizontal Frame Ladder a Ladder ( s/d 1,5 stage) b Stair Frame ( 2 stage keatas ) c pipe handri ( 3 stage keatas ) 6 Custer c/w stoper, Bolt&nut 7 Additional pipe a Additional pipe 1,5 m b Additional pipe 2 m c Additional pipe 3 m d Additional pipe 4 m e Additional pipe 6 m 8 Clame a Fixe Clame b Swivel Clame 9 Adjustable Base / jack Base