1 M² Plesteran Beton 1 Pc : 2 Ps, tebal 15 mm

Bahan
Semen Portland 9.300 Kg x Rp. 1,180 = Rp.
Pasir pasang 0.018 M³ x Rp. 108,333 = Rp.
Jumlah (1) = Rp.
Tenaga
Pekerja 0.260 Oh x Rp. 90,000 = Rp.
Tukang batu 0.200 Oh x Rp. 110,000 = Rp.
Kepala tukang 0.020 Oh x Rp. 120,000 = Rp.
Mandor 0.013 Oh x Rp. 130,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) + (2) = Rp.
profit + overhead (maks. 15%) 10% = Rp.
Jumlah (1) + (2) = Rp.

1 M² Plesteran 1 Pc : 3 Ps, tebal 30 mm (screed)


Bahan
Semen Portland 14.150 Kg x Rp. 1,180 = Rp.
Pasir pasang 0.039 M³ x Rp. 108,333 = Rp.
Jumlah (1) = Rp.
Tenaga
Pekerja 0.320 Oh x Rp. 90,000 = Rp.
Tukang batu 0.250 Oh x Rp. 110,000 = Rp.
Kepala tukang 0.025 Oh x Rp. 120,000 = Rp.
Mandor 0.015 Oh x Rp. 130,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) + (2) = Rp.
Profit + overhead (maks. 15%) 10% = Rp.
Total = Rp.

1 m2 Pekerjaan water proofing (coating)


Bahan
curbing sudut 0.4 m' x Rp. - = Rp.
bahan waterproofting coating 2.5 kg x Rp. 16,856 = Rp.
sewa mixer 0.02 bh x Rp. 50,000 = Rp.
kuas 0.2 unit x Rp. 15,000 = Rp.

tenaga
tukang batu 0.2 org/h x Rp. 90,000 = Rp.
kepala tukang batu 0.02 org/h x Rp. 110,000 = Rp.
pekerja 0.1 org/h x Rp. 120,000 = Rp.
mandor 0.01 org/h x Rp. 130,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) + (2) = Rp.
10% = Rp.
Total = Rp.

1 M2 Langit-langit Gypsum Board 9 mm + Rangka besi hollow 2/4 galvanis


Bahan
Besi hollow galvanis 2/4 1.500 Btg x Rp. 9,000 = Rp.
Cornes 0.300 Kg x Rp. 6,500 = Rp.
Textile Tape 0.025 roll x Rp. 15,000 = Rp.
Paku Sekrup 0.110 Kg x Rp. 55,000 = Rp.
Paku Biasa 2" - 5" 0.060 Kg x Rp. = Rp.
Paku Gypsum 0.040 Kg x Rp. 0 = Rp.
Gypsum Board x 9 mm 0.364 Lbr x Rp. 75,000 = Rp.
Jumlah (1) = Rp.
Tenaga
Pekerja 0.260 Oh x Rp. 90,000 = Rp.
Tukang Kayu 0.400 Oh x Rp. 110,000 = Rp.
Kepala Tukang 0.040 Oh x Rp. 120,000 = Rp.
Mandor 0.0130 Oh x Rp. 130,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) + (2) = Rp.
profit + overhead (maks. 15%) 10% = Rp.
total = Rp.

10 M2 Bongkaran Plafond + Rangka


Tenaga
Tukang 0.600 Oh x Rp 110,000 = Rp
Kepala Tukang 0.060 Oh x Rp 120,000 = Rp
Pekerja 2.000 Oh x Rp 90,000 = Rp
Jumlah (1) = Rp
overhead + profit (maks. 15%) = Rp
Total = Rp
untuk 1 m2 = Rp
update 5/12/19
10,974
1,950
12,924

23,400
22,000
2,400
1,690
49,490
62,414
6,241
68,655 68,700

update 5/12/19
16,697
4,225
20,922

28,800
27,500
3,000
1,950
61,250
82,172
8,217
90,389 90,500

0
42,141
1,000
3,000
46,141

18,000
2,200
12,000
1,300
33,500
36,500
3,650
40,150 40,200 (3x kuas) 120,600

13,500.00
1,950.00
375.00
6,050.00
0.00
0.00
27,300.00
49,175.00

23,400.00
44,000.00
4,800.00
1,690.00
73,890.00 bongkaran 1/2 harga 36945
123,065.00
12,306.50
135,371.50 135,400

update 26/6/19
66,000
7,200
180,000
253,200
37,980
291,180 291,200
29,118 29,200