You are on page 1of 1

Program Module:

Phase - I

Sr. No. Class room Instructional Module


1 Introduction and basic concepts contractor, Supervisor,Wireman
2 How to apply for Supervisor and contractor license.
3 Laws and regulations
4 Load Calculation on site
5 Electrical Wiring
6 Electrical Drawing
7 Illumination Scheme Design
8 Basic low - voltage System
9 Bill of material (BOM) and tender filling procedure
10 Demo of Various equipment’s and measurements
Phase – II
Sr.No On site activities
A Supervise the overall activities on site
B Preparing the site for activities
C Supervising slab conduit laying
D Supervising wall conduit laying
E Insertion of wires in conduit
F Fixing of switch – Boards and accessories
G Installation of Distribution Boxes
H Testing and Connecting
I Assist the material acquisition activity
J Assist for distribution of materials
K Installation of electric pumps and other Machinery
L Installation of service Mains
O safety
P Earthing for HT/LT

You might also like