Site EHS Report India - South-CNS-Kurnool-July 2011
Site EHS Report India - South-CNS-Kurnool-July 2011
South 4 Employee 2
KURNOOL 2
Month
JULY-2011 0
Third Party
0 0 0 0
0 1 0 0
Please provide a brief summary of each incident reported. Only include incidents for the reporting period
Note: to add extra rows to the grid below, select the bottom row and from the toolbar at the top click on Table > Insert > Rows Below)
No Date 1 20.07.2011
Incident Type CS440 Cone crusher CCLP panel inclined towards one side
Brief Description Kmc Construction Ltd, Tammarajupalli Site: CS440 CCLP Panel found inclined towards one side after heavy rain. Inspection done & found that no concreting was done in the legs of the CCLP panel. in order to avoid future damage we levelled the area & placed a heavy plate below the legs & properly installed the legs of panel & also given support to the panel
Comments:
Observations
Observations by Managers / Supervisors using Planned Task Observation or General Observation forms.
Workplace Inspections
At least 1 inspection per month is required. Your inspection checklist must include all equipment and conditions on your site which could cause injury, illness, damage or environmental Incidents.
Environmental Data
Data to be provided by sites where Sandvik bears cost of these environmental indicators. Ensure date of reading and meter reading and/or consumption are completed for all necessary fields. Indicators not used on a particular site should be marked not used on site as needed.
Indicator
Electricity - Office Electricity Guest House1 Electricity Guest House2 Water Service Vehicle1 Fuel consu.
Type (Unit)
Total Purchased (kWh) Total Purchased (kWh) Total Purchased (kWh) Total Purchased (KL) Kms/ Fuel Consumed(HSD)
Date of ReadingFrom
612(01.06.2011)
Date of Reading-To
824(31.06.2011)
Total Consumption
212 NIL
01.07.2010
31.07.2010
Page 1
Page 2