You are on page 1of 1

NOTES

ALL DIMENSIONS TO BE CHECKED ON SITE AND ANY DISCREPANCIES TO BE


ADVISED PRIOR TO CONSTRUCTION.

ALL DEMOLITIONS + CONSTRUCTION TO BE CARRIED OUT IN ACCORDANCE WITH


RELEVANT CODE OF PRACTICE & METHOD STATEMENT BY MAIN CONTRACTOR.

ANY ALTERATIONS TO EXISTING ELECTRICAL LAYOUTS/SYSTEMS TO BE AGREED


UPON WITH; + CARRIED OUT BY ELECTRICAL CONTRACTOR.

ANY NEW HEATING OR LIGHTING SYSTEMS TO COMPLY WITH SECTION 2 OF THE


TECHNICAL BOOKLET PART F.

CONTRACTOR/MANUFACTURER/CONSULTANT TO CHECK ALL DIMENSIONS FROM


DRAWINGS + NOTIFY THE DESIGNER OF ANY DISCREPANCIES PRIOR TO
FABRICATION TO ALLOW FOR MODIFICATIONS. DISCREPANCIES NOT BROUGHT TO
ATTENTION OF THE DESIGNER WILL BE THE RESPONSIBILITY OF THE RELEVANT
CONTRACTOR/MANUFACTURER/CONSULTANT.

THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH ANY OTHER RELEVANT


DESIGN/ENGINEER/SPECIALIST DRAWINGS AND/OR SPECIFICATIONS.

CONTRACTOR/MANUFACTURER/CONSULTANT MUST ADVISE ON ALL DETAILS TO


1 ENSURE SUITABILITY + STABILITY OF ALL CONSTRUCTION MATERIALS AS
-0
TB APPROPRIATE.

-0
1 CH-06 A ANY CONSTRUCTION WORK DESCRIBED OR SPECIFIED ON THIS DRAWING SHALL BE
TB UNDERTAKEN IN ACCORDANCE WITH CURRENT HEALTH & SAFETY REGULATIONS.

CH-06 A PROPOSED ALTERATIONS TO BE APPROVED BY LANDLORD PRIOR TO


1
-0 COMMENCEMENT OF WORKS.
BQ 1
-0
TB ALL ELECTRICAL INSTALLATIONS TO COMPLY WITH CURRENT RECI REGULATIONS.

1 ALL WORK TO BE IN ACCORDANCE WITH THE APPROPRIATE BUILDING


-0 CH-06 A
TB REGULATIONS AND THE FIRE SAFETY CERTIFICATE AS APPROVED BY THE
RELEVANT LOCAL AUTHORITY.
CH-06 A

1
-0
TB

1 CH-06 A
-0
TB
CG
-0
5 6
CH-06 A -0
BQ
CG
-0 CG
4
CH-07

-05
TB A
-0 2 CG

B
AC-10 -05

-05
A

CG
CG CG
-0 -05
4 A
TB

B
-14 BQ CG

-05
-02 -05
70-HC CH B

CG
-06 CG CG
B TB -05
-14 -04 B
CH-09 A CH-09 A
CH-06 C CH-06 A CG
AC -05
-1 CH -08 B
3

1 -06 CG
-0

CH -05
TB-15
TB

B
4

B
-1

CH
CH-06 A
TB

-06 -08 CG
AC

B TB CH -05
B
-0

-14
CH-09 A
1

CH-06 C -08 CG
7 CG CH -05
A

DATE
CH -0
-06 CH CH - 02
CH-06 A -08 CG
AC

B -05
A
-0

REV Notes Initial


1

CH CG
-0
7
-08 -05
TB CH A
- 01
CH
AC

-08
-0

CG-0
TB
1

CH -0 -07
1 CH
-0

5
7

B
8
CH-0
-07
CH

CG-0
TB CH 8
-0 -01
CH CH-0
7 -07

5B
8
CH-0
TB

7
- 01 CG

H-0
CH -02
-07

C
CG-0
AC -02 CH-0 4
-1 TB 8
1 CH CH-0 CG-0
CH-06D 4
-07 8
1
-1

CH-0 CG-0
CH

BQ-0
-01

CH-09 A 8 2 4
TB

4 -0
3

BQ
-0

AC
-0
TB

TB

-0 BQ TB-1
1 CH-06 D -04 4
TB-1
CH
-07
4
1

CH-09 A
-1
CH

AC
- 01 CH-06 C TB-1
AC TB 4

-07
CH-09 B -0 CH-06 A
-1 2
1

CH
-14
3
-0

CH
CH-06 A
TB

TB

CH-06 D -02 C
AC

-0
TB H

70
CH-09 A -0

7
-0 CH-06 C 7

-H
1 CH-09 B CH-06 A
-01
0

C
-1

3
3

CH

-0

TB

-07
-0

TB

CH
TB

CH-06 D -04
BQ

TB
AC CH-09 A CH-06 D
AC
0

-1
0

-1

-0
-1

5
-1
CH

1 7
CH

1 CH-0
-01
TB

7
3

AC-12 CH-0
-0

CH-06 D 7

C
TB

AC -0
0

H
-1

-0
-0 H
C
CH

7
7
TB-0 CH-0
1 7
CH-09 B CH-0
3
-0

TB-0
TB

AC 1
1
-0
1 CH-1 CH-06 D
TB-0

1
1

TB-0
-11

CH-09 B CH-0 CH-06 B


7 TB-0 CH-06 B
CH

1
TB

AC CH-06 D CH-0
-0 7
-0

1
3

CH-06 D
CH-0

TB
AC-12 1
7

-1
TB-0

AC CH-0

5
AC - 7
-01 11 CH-06 D

CG-03 & AC-03


CH

AC
-10
CH
CH-06 C
CH-06 B
CH-06 B PROJECT DATE

4
-01 -10

TB-1
CH-11

DTX2819 26.05.22
CH-09 A

AC-12 CH-06 C
TB

AC
-0

-01
AC
3
CH-09 A

-11
TB

-03 CH-06 D

1
-03

TB

TB-0
1
CH-1
CH CH-06 D
-0
CH-09 A

9B
1 -1

CH
CH
CH
TB

-09 -1
B 1
-03

AC-12

DRAWING TITLE DRAWING NO.

TB-14
CH-09 A CH-06 C

3
-0

CG-12
TB CH-06 C
AC
AC -11
-01 CH-09 A

AC CH-09 A RESTAURANT DTX2819-002

03
-01

-
CH-09

TB
AC
-01
AC-1
1
CH-09 A
FF&E PLAN
A
CH-09

-03
TB
AC-1
1
CH-09
A

CH-09 B
-0
TB

AC-11
SCALE
A

AC-1 AC-10
0

1
-1
CH

AC-0 AC-1
1

0
1

-1

3
CH
3

-0
-0

CH-09B

TB
AC-0
1:100 @ A3
TB

1
0

CH-09 A CH-09 A
-1

AC-0 CH-09 B
CH

1
0

03

3
-1

-0
CH

AC-0
-
TB
TB

TB
CH-11

CH-11
1 -0
AC-0 3
1 CH-09 B
AC-0 CH-09 A
1
AC-0
1
AC-01 AC-01 AC-01
AC-01 AC-01 AC-01 INITIAL REVISION
JB *

You might also like