Proposal for improvement in maintenance and logistics

according to Linear Scheduling, KPI and EOQ to reduce


cost overruns at Di Bacco Transporti SRL
Proposal for improvement in maintenance and logistics according to Linear Programming, KPI and EOQ to reduce
cost overruns in Di Bacco Transporti SRL

Anghela Brianna Miller1, María Sofía Carolina Muñiz Luna Victoria1 and Michele Simone Dellachiesa2
1
Bachelor of Industrial Engineering, anghela.miller34@gmail.com , carolinamlv213@icloud.com
2
Master of Research and University Teaching, michele.dellachiesa@outlook.com
Abstract – The research carried out sought to determine to [5]. In addition, cost overruns are identified as the amount of
what extent the proposal for improvement in maintenance and cash that has been invested and this exceeds what was initially
logistics according to linear programming theory, KPI and EOQ calculated [6].
influences the cost overruns of the company Di Bacco Transporti
Globalization has allowed the commercialization of goods
SRL Visits were made to the company, interviews with the heads of
the analyzed areas and a review of documents delivered by them;
and services to be a reality even in the most remote places in
then the respective mathematical calculations of the collected data. the world [7]. For this reason, logistics has become of great
It was determined that the cost overruns in both areas were importance for companies, it is no longer understood as
$108,182.27. An improvement proposal was designed integrating something complementary, since it has added a competitive
linear programming, KPI, EOQ and the results of implementing it value to their merchandise, in order to cover the needs of their
in the company were simulated in ProModel. It was determined consumers, carrying out an adequate logistics management
that the cost overruns after the improvement proposal represented a that is determined as a job involved with all areas of the
reduction of 8 5.64% and a monetary benefit of $92,648.08. The company [8]. For this reason, logistics is outlined as a
proposal obtained an IRR of 68%, an NPV of $25,285.05 and a B/C
fundamental pillar in business strategies [9].
of 3.29, indicating that it is profitable to implement it.
Keywords– Cost overruns, maintenance, logistics, cargo In the national context, Italy has a logistics and
transportation. transportation system that does not meet the requirements of
the productive sector, due to the lack of supply of value-added
INTRODUCTION services and operating structures, on the contrary, they result
in a high cost [10]. These deficiencies significantly influenced
Today, there has been a growth in the cargo transport the competition of the nation that is observed in the business
service due to the COVID-19 pandemic, due to the purchase economy, since logistics costs form a large part of the global
of materials and the transfer of goods that organizations have cost of the product [11]. These were relatively high, since they
needed for the gradual reactivation of their operations [1]. represent between 20% and 50% of the value of the product,
For this reason, transportation is one of the priority compared to other member countries of the European Union
activities in the supply chain, due to the fact that organizations where logistics costs range between 9% and 12% [12].
from different sectors cannot carry out their operations in the According to [13], the financial and commercial situation
absence of the transfer of their merchandise [2]. Thus, freight of the region of Piemonte presented important investment
transport allows carrying out the distribution process from a opportunities with minimal danger in different areas of the
starting point to the final destination, where the behavior of economy, since the organizations focus their activities on
this process is not carried out in a unidirectional manner, sector C of the citizenry, causing an economic increase for the
likewise, the efficiency and quality of the freight transport companies, specifically in heavy cargo transportation in the
service will depend of the levels of performance and region. However, a problem for this sector and logistics in
competitiveness of the sector and of the country where said general is the lack of capacity of the road network around
process is carried out [3]. large cities such as Torino [14]. These infrastructural delays
As for the cost overrun, it is said to be the relationship generate a negative impact on the economic growth and
between the real final costs of a project and the estimate made competitiveness of the country [15].
[4]. It is also understood as the amount by which the actual Likewise, with globalization and the obligation of
cost exceeds the estimated cost, with the cost measured in organizations to meet certain standards to be competitive, it is
local currency, at constant prices and on a consistent baseline essential that they have correct maintenance management in
Digital Object Identifier: (only for full papers, inserted by the order to keep their machinery, instruments and facilities in
organization). optimal operating conditions [16]. This has a direct influence
ISSN, ISBN: (to be inserted by the organization). on the production process, since any damage to the plant's
DO NOT REMOVE industrial equipment means an increase in operating costs and
a reduction in income [17]. According to [18], it was essential detail the balance between the costs of ordering and the costs
to have a maintenance plan that reduces the chances of this of maintaining inventories, and it is also essential for the
happening and that it is optimized, so as to add value to the evaluation of more complex systems [7].
company [17].


On the other hand, according to [19] in Italy a permanent 2 DS
financial and manufacturing increase has been perceived since EOQ=
the first decade of the current century, being reflected in the H
increase in the production of the different industrial sectors. (3)
For this reason, it involved the availability of equipment and
safety, since it is not possible to work with a machine out of D: Annual demand in units.
service [18]. In addition, the handling of equipment generates S: Fixed cost of placing and receiving an order (ordering cost).
wear and tear and determines to carry out maintenance, fuel H: Annual inventory maintenance cost (holding cost).
supply, oil modification, or restoration, but carry out these
tasks with an economic approach and with an understanding of This EOQ model is complemented by the use of equation
the expenses involved, not only to be aware of them, but to (4).
carry out supervision and administration [20].
Piemonte has become one of the most active cities in Inventory turnover =¿D/(Q/ 2+SS) (4)
economic terms in Italy [21]. In addition, organizations in the
transportation sector perceived the obligation to put into D: Annual demand.
practice and design strategies that repair their weaknesses and Q: Quantity ordered.
intensify their strengths, through the implementation of SS: Safety Stock.
different methods and tools [22]. Likewise, to reduce
unjustified maintenance expenses, a failure analysis should be According to [24], the EOQ model assumes that the
carried out and the most serious identified, for the demand is known and constant; however, in most cases, this is
implementation of a preventive maintenance program, with not true. That is why companies need to have security
the purpose of increasing the availability and reliability of the inventories, which is achieved with the fixed order quantity
equipment [18]. model that constantly verifies the level of stocks, which when
Given the importance of controlling cost overruns in the they reach a certain level R, indicates that they must be done.
study areas of this research, the proposal proposes the use of new orders. For this, (5) and (6) are used.
three industrial engineering tools, described below.
Linear programming is a mathematical optimization tool Safety Stock=zσ T +L (5)
for resource allocation, through the determination of objective
functions and linear constraints [23]. Furthermore, they follow z: Number of standard deviations for a specific service
the form (1) and (2), respectively [24]. The studies carried out probability.
regarding transport models using this technique focused on the σ T+ L: Standard deviation of demand during the review and
design of distribution and other logistics activities of delivery period.
organizations [25]. Likewise, the linear programming (LP)
used in transport models minimizes the total cost of transport
and managed to optimally balance supply and demand [26].
R=d z L+ σ L (6)

Z=C1 X 1 +C 2 X 2 + …+ Cn X n (1) R: Reorder point in units


d: Average daily demand
L: Lead time in days (time elapsed between making and
Subject to restrictions: receiving the order)
z: Number of standard deviations for a specific service
A11 X 1+ A 12 X 2+ …+ A 1 n X n ≤ B1 (2) probability
σ L: Standard deviation of use during delivery time
Where C n , A mn and B m are given constants.
On the other hand, [29] consider an indicator as a
According to what was mentioned by [27], the model of quantified, verifiable interpretation, where the precise
economic order quantity (EOQ) is the quantity to order (Q) information is entered, processed and exposed to calculate the
determined with the cost contemplated through the volume progress or decline of an established objective. Likewise, the
range provided by the seller for the rate agreed and will key performance indicators (KPI) reach two essential
largely depend on the different variables involved, expressed functions, a descriptive one, which consists in the increase of
in units per order as obtained from the calculation of equation data according to the state in which the company is located,
(3). Likewise, the storage cost generates a decrease in the size and an evaluative function, which consists in adding said data
of orders, however, it increases the processing time [28]. In a judgment most likely objective value [30]. In addition, the
addition, the EOQ is essential for inventory models, since they

25th MIT International Multi- Conference for Engineering: “Technology, Research and Innovation in Post-pandemic Engineering: Resilient, Inclusive and
Sustainable Actions”, Hybrid Event, Cambridge, Massachusetts - USA, July 18 - 22, 2022. 2
indicators are tools that serve to analyze an organization and In addition, this research was structured within the
to approach its goals [31]. descriptive-propositional type. According to [35], a
According to what was described, the research question descriptive investigation is one that seeks real original
was formulated: To what extent does the proposal for information that is generated from the imminent supervision
improvement in maintenance and logistics according to linear of the researcher and from the wisdom that is acquired through
programming theory, KPI and EOQ influence the cost the interpretation or analysis of the information provided by
overruns of Di Bacco Transporti SRL? several researchers. In turn, [36] pointed out that proactive
The general objective was to determine to what extent the research consists of making a transformation proposal, where
proposal for improvement in maintenance and logistics a convincingly argued, proposal is built to overcome
according to linear programming theory, KPI and EOQ deficiencies initially found.
influences the cost overruns of Di Bacco Transporti SRL. On the other hand, according to [37], the population is an
The specific objectives were: integral group of components, with some usual features, which
1) Analyze the economic losses in maintenance and logistics are the object of study, in addition, a population could be
of the company and determine the cost overruns. infinite or finite. In the current investigation, a finite
2) Carry out the design of the improvement proposal population was contemplated, due to the knowledge of the
according to the theories of linear programming, KPI and specific data of the aspects presented by the study, which was
EOQ. composed of the logistical and maintenance processes.
3) Determine cost overruns in maintenance and logistics Likewise, the sample was a part or subgroup of elements of
after the improvement proposal. the population, chosen in a representative manner [37].
4) Evaluate the improvement proposal economically and Therefore, to select the sample, the non-probabilistic method
financially. was used, selecting the elements that suit the researcher, which
The hypothesis of the proposed research was that the were all the logistics and maintenance processes.
proposal for improvement in maintenance and logistics For the collection and analysis of data, the hypothetical-
according to linear programming theory, KPI and EOQ deductive method was used, which is constituted by the
reduces cost overruns by 25% in the company of Di Bacco generation of hypotheses through two assumptions, one
Transporti SRL. universal and the other empirical.
This research was justified in order to reduce logistics and
III. RESULTS
maintenance cost overruns in the company Di Bacco
Transporti SRL, to generate value in said organization. The A diagnosis of the company was made, through an
importance lies in the fact that, currently, companies seek to Operations Process Chart (OPC), a Process Analytical
minimize their costs by providing their services with the Diagram (DAP), a Value Stream Mapping (VSM), 5 Whys
greatest efficiency to all the stakeholders of the organization, Analysis and the Ishikawa Diagram. The months from
which are constantly evaluated throughout the logistics chain September 2020 to August 2021 were taken as a reference for
[32]. In addition, by minimizing unnecessary maintenance the diagnosis and as an evaluation period.
costs, and ensuring the proper functioning of the equipment Four economic losses and their associated root causes
and machinery that participate in the production process, were found, compiled in Table I. Next, the indicators and tools
companies can guarantee the quality of their efficiently to measure these problems were identified and improvement
manufactured goods [16]. proposed for each of these.
II. METHODOLOGY TABLE I
The present investigation had a quantitative approach, ROOT CAUSE INDICATOR MATRIX
No. Present
Improvement
which aims to identify general behaviors that represent the Root Economic loss Root cause Indicator Value
tool
cause (Monetary)
total of a studied population, based on the quantification of the Rush quotes Economic
Poor purchase
aspects investigated, through the use of theories with CR1 with a single
provider
planning
Order
Quantity
$3,898.59 EOQ

established concepts, in order to analyze them and measure unnecessary


Bad
Inventory Linear
CR2 management of $96,566.60
them correctly; therefore, this approach was used, since the orders
the logistics area
value in stock Programming

data collection used a numerical measurement to describe the Lack of Utilization


registration and
study variables [33]. On the other hand, it was of non- CR3
planning for
monitoring the
experimental design, because it is carried out without the maintenance
Performance

intentional handling of the researchers and only the problems area.

in their usual environment are contemplated to be studied later Delays in


Ignorance of the
importance of
CR4 maintenance Availability $5,694.87 KPI
[34]. In addition, this research was taken as a cross-sectional work
preventive
maintenance.
design since the information was collected from a single Lack of data Duration of
moment [34]. registration and goods
tools for the
CR5
supervision of dispatches on
the logistics time
area.

25th MIT International Multi- Conference for Engineering: “Technology, Research and Innovation in Post-pandemic Engineering: Resilient, Inclusive and
Sustainable Actions”, Hybrid Event, Cambridge, Massachusetts - USA, July 18 - 22, 2022. 3
Rework in the
Lack of training
of workers in the
+148X 29 +89X 30 +104X 31 +354X 32 +26X 33 +51X 34 +37X 35
CR6 maintenance Reworks $2,022.21 KPI
area
maintenance +77X 36 +21X 37 (7)
area

TABLE II Subject to:


INVENTORY POLICY ACCORDING TO CALCULATED EOQ For model 1: Z ≤ 35,000 and all variables X n ≥ 1.
Item ¿
Product Code EOQ
For model 2: Z ≤ 40,000 and all variables X n ≥ Q n.
Inventory turnover SS R
(Q*)
2503030020 18 6 3 1 Finally, formats were created in Microsoft Excel of the
2503030051 4 2 0 0
2503030054 9 4 0 0
files and records of the data necessary for the calculation of
2503030058 4 2 1 0 the KPIs established for the company's logistics and
Oils
2503030116 13 4 3 0 maintenance areas, which had the form shown in Fig. 1.
2503030117 108 15 95 6
2503030119 47 9 27 3
2503030133 9 3 1 0
2503030143 5 2 1 0
2503030152 2 1 0 0
2503010002 47 8 31 10
2503010019 23 6 8 4
2503010183 27 6 12 5
2503010209 31 6 17 6
2503010129 27 6 12 5
2503010233 22 5 8 4
2503010064 14 3 6 2
2503010278 8 1 9 2
2503010210 31 6 18 6
2503010243 9 2 4 2 Fig. 1 Example of tabs and records created for KPI calculation.
2503010149 8 3 1 1
2503010043 10 2 5 2
2503010154 11 3 4 2 In Fig. 3, the design of the processes of the study areas is
Filters 2503010250 6 2 2 1 shown, which were simulated in ProModel for 52 weeks,
2503010105 2 1 0 0
where the main output entity was "Vehicle", whose
2503010273 8 2 3 1
2503010234 14 3 7 3 comparison of the state of the entities in the current model
2503010184 25 5 11 4 against the improvement model is contemplated in Fig. 2. and
2503010207 11 2 6 2
2503010077 10 3 3 1
in Table III.
2503010148 12 4 2 2
2503010173 7 2 2 0
2503010005 10 3 3 1
2503010067 3 1 1 0
2503010294 3 1 1 0
2503010295 3 1 1 0
2503010299 2 1 0 0
a
Each element code belongs to the company's “Sprinter” system.

A Pareto diagram was made to prioritize the economic


losses, and it was obtained that the four exceeded 80%. For the
design of the improvement proposal, it began with the use of
the EOQ model tool applied to all the components of which
inventories were maintained and historical data was recorded
in the evaluation period; in Table II, the results are shown. For
linear programming, two models were obtained, where a
function Z (total value of inventories) was obtained, equation
(7), the average unit costs of each filter and oil were taken as
coefficients, as variables X n to each element that corresponded
to each code according to the order in which they were listed
in Table II. In model 1, Z was maximized; while in model 2, it
was minimized. In addition, a maximum monetary value of the
total inventory was restricted.
Fig. 2 Comparison of entity state times
Objective Function (FO):
Z=117.79X 1 +36X 2 +19X 3 +130X 4 +51X 5 +3X 6 +42X 7
In addition, variables were used to observe the state of the
+27X 8 +23X 9 +127X 10 +39X 11 +104X 12 +20X 13 +33X 14
entities in the different locations and the results were compiled
+73X 15 +36X 16 +24X 17 +82X 18 +40X 19 +321X 20 +177X 21
in Table III.
+90X 22 +100X 23 +170X 24 +33X 25 +17X 26 +172X 27 +41X 28

25th MIT International Multi- Conference for Engineering: “Technology, Research and Innovation in Post-pandemic Engineering: Resilient, Inclusive and
Sustainable Actions”, Hybrid Event, Cambridge, Massachusetts - USA, July 18 - 22, 2022. 4
Warehouse

Maintenance area 1

Logistics area Quality Delivery Maintenance area 2


Check area
Departure of trucks
attended

Reception area Maintenance area 3

Fig. 3 Layout of the simulation in ProModel

T ABLE III Sale for transport service $21,383,197.00 $21,383,197.00


COMPARISON OF MODELS IN PROMODEL (-) Cost of operation -$18,851,653.00 -$18,851,653.00
Model with Gross profit $2,531,544.00 $2,531,544.00
ProModel Outputs Current model
improvement (-) Administration expenses -$1,946,073.00 -$1,946,073.00
Trucks to serve 311 311 (-) Selling expenses -$435,473.00 -$435,473.00
Variables Trucks serviced 271 311 operating profit $149,998.00 $149,998.00
Purchases made 271 311 Financial income $748,694.00 $748,694.00
(-) Miscellaneous expense -$1,281,174.00 -$1,281,174.00
%Time in Motion Logic 0.39% 2.84%
(-) Amortization of intangibles $0.00 -$10,740.00
%Time Waiting 33.82% 1.99%
Entity States (-) Interest $0.00 -$1,316.23
%Time in Operation 51.82% 95.17% miscellaneous income $1,557,956.00 $1,651,442.60
%Time Blocked 13.97% 0.00% Income before taxes $1,175,474.00 $1,256,904.37
(-) Income tax -$346,764.83 -$370,786.79
Net profit $828,709.17 $886,117.58
In Table IV, the cost overruns of each of the economic Increase   $57,408.41

losses identified in Table I before and after the improvement


proposal were summarized, and the respective comparison IV. DISCUSSION AND CONCLUSIONS
was made to determine the monetary benefit and reduction
Four economic losses were identified in the company's
percentage that it meant for the company.
maintenance and logistics areas, and it was determined that the
T ABLE IV cost overruns were $108,182.27, associated with six root
OVERRUNS BEFORE AND AFTER THE IMPROVEMENT PROPOSAL causes, and it was possible to establish the appropriate
Economic loss
Cost overrun Cost overrun
% Reduction Benefit
improvement tool.
before upgrade after upgrade

Rush quotes with a


$3,898.59 $1,622.96 58.37% $2,275.63
single provider

unnecessary orders $96,566.60 $12,780.12 86.77% $83,786.48

Delays in
$5,694.87 $292.59 94.86% $5,402.28
maintenance work

Rework in the
$2,022.21 $838.52 58.53% $1,183.69
maintenance area

Total $108,182.27 $15,534.19 85.64% $92,648.08

In Table V, the Income Statement of the last month before


and after the proposal was compared, adding the total benefit
found in Table IV and subtracting the cost of implementing
the proposed improvement tools.
TABLE V
INCOME STATEMENT BEFORE AND AFTER THE IMPROVEMENT PROPOSAL
  September 2021 September 2021 (*)

25th MIT International Multi- Conference for Engineering: “Technology, Research and Innovation in Post-pandemic Engineering: Resilient, Inclusive and
Sustainable Actions”, Hybrid Event, Cambridge, Massachusetts - USA, July 18 - 22, 2022. 5
The need to create an inventory policy and the use of the The implementation of the EOQ, Linear Programming
EOQ model was considered, coinciding with [7], who and KPI tools constituted a cost of $900, $1,000 and $8,840
conclude that the determination of inventory policies through respectively, that is, the total cost of the implementation of the
EOQ models guides the corresponding managers to better improvement proposal for the transport company represented a
logistics planning and is achieved. know with greater certainty total cost of $10,740. In the economic and financial
the magnitude of the order. evaluation, a high value was found for the IRR, being 68%,
The EOQ model with probabilistic demand allowed which justified the great monetary benefit of the proposal
calculating the quantity, duration, safety stock and reorder compared to its low cost. On the other hand, the NPV
point of each purchase of part of the filters and oils that the indicated a monetary value of $25,295.05 after returning the
company needs, the results are shown in Table II. This new investment made. The B/C indicator was 3.29.
inventory policy improved purchase planning and Regarding the research question, the results obtained
administration of the logistics area, reducing the economic showed a reduction in economic losses or cost overruns of the
losses encountered. The positive results agree with the company's logistics and maintenance processes of 85.64%,
deterministic EOQ model carried out by [7], where they which exceeded the 25% established in the hypothesis. This
concluded that warehouses require tools such as the one used showed that the joint use of the industrial engineering tools
to minimize the logistics costs of stocks. chosen for the improvement proposal was pertinent and
Linear programming was used as a verification tool for obtained optimistic results that generate value for the
the optimal order quantities (Q*) calculated with the EOQ, organization. In addition, [32] and [16] agreed that the benefit
which with the restriction required by the company of achieved is of great importance, since it not only represented a
$35,000.00 of monetary value of the stock in the warehouse monetary saving, but also the modifications made to the
(model 1), the new Q* of each element varies an average of - processes increased the efficiency and quality of the service
77%, ignoring the supply needs of the parts of the warehouse; offered, being the purpose of all company.
however, when performing a second PL model with a As limitations, it should be considered that the economic
restriction of $40,000.00, all the Q* of the inventory policy order quantity is limited to the delivery time in days, so the
established in the EOQ model were accepted and shortages or evaluation of the suppliers is recommended. In addition, linear
out-of-stocks were avoided. The monetary value of the programming is limited to the cost per unit per part, so it is
optimal inventory was then $36,432.00. recommended to quote with different suppliers and perform
The finding was contrasted with [39], who stated that new calculations when these vary. Finally, the KPIs are
when linear programming was used to manage inventory, it limited to a considerable sample time, for which it is
empowers those in charge to take into account any change in suggested to foresee a data collection in months.
stock policy, in addition to being helpful for other stock In conclusion, the improvement proposal designed with
control decisions. and the flow of these, obtaining the the use of linear programming theories, KPI and EOQ
maximum benefit. In addition, [40], concluded that this tool achieved a significant reduction in cost overruns in the
allowed having an adaptable work procedure and easy logistics and maintenance areas of Di Bacco Transporti SRL.
integration. When analyzing the economic losses of the company,
In the findings by [13] and [22], a better control and significant cost overruns were determined, especially in the
registration of the study areas in the logistics and maintenance logistics area.
areas, respectively, was evidenced, verifying, in the same way The design of the improvement proposal was carried out
that the proposed KPIs allowed better control and registration with the use of linear programming, KPI and EOQ, thus an
in the study areas, which reduced the cost overruns found. In inventory policy was created according to the restrictions
addition, the lack of historical information in the maintenance imposed by the logistics area and also, formats for key
area was observed, in agreement with [41], which for the performance indicators, according to the deficiencies found in
quantification of maintenance performance is a frequent and the study areas.
similar problem in all organizations. Likewise, with the simulation in ProModel of the
However, it was essential to have historical data to build proposal, an increase in the maintenance service of the
the mathematical models of the improvement tools and, for company's trucks and a significant reduction in the blocking
example, to quantify the relationship between preventive times of the processes were observed, which represents a
maintenance and the availability of the machines, in this case, greater availability of the fleet. Consequently, the cost
the trucks [18]. For this reason, the files and records designed overruns after the improvement proposal had a significant
were of great benefit to the company, the data collected was monetary reduction.
used for better decision-making by the area managers. The improvement proposal was evaluated economically
The cost overruns in maintenance and logistics were and financially, it was concluded that it was viable and of
determined after the improvement proposal presented, which great benefit to the company, demonstrating that the
were $15,534.19, representing a monetary reduction of investment was convenient.
$92,648.08. This was contrasted with [13], who improved the
logistics management of a freight transport company and
obtained a benefit or cost reduction of 28.16% ($62,694.11).

25th MIT International Multi- Conference for Engineering: “Technology, Research and Innovation in Post-pandemic Engineering: Resilient, Inclusive and
Sustainable Actions”, Hybrid Event, Cambridge, Massachusetts - USA, July 18 - 22, 2022. 6
It is worth mentioning that the success in the use of the [15] RA Cortes Villafradez. “How competitive are the member countries of
the Pacific Alliance in transport infrastructure?” EAN Magazine, (85),
tools implies a correct training of the personnel in charge, who 143-172. 2018. https://doi.org/10.21158/01208160.n85.2018.2055
in the future can modify the calculations made for the design [16] W. Olarte, M. Botero, and B. Cañon. “Importance of industrial
of the improvement proposal, according to the changes that maintenance within production processes”. Scientia et technica, 16(44),
the company may undergo. 354-356. 2010. https://doi.org/10.22517/23447214.1867
[17] A. Ortiz Useche, C. Rodríguez Monroy, and H. Izquierdo. “Maintenance
ACKNOWLEDGMENT management in industrial SMEs”. Venezuelan Journal of Management,
18(61), 86-104 . 2013. https://doi.org/10.37960/revista.v18i61.11005
We appreciate the information shared and the willingness [18] C. Alavedra Flores, Y. Gastelu Pinedo, G. Méndez Orellana, C. Minaya
of the people interviewed from the company Di Bacco Luna, B. Pinedo Ocas, K. Prieto Gilio, ... and C. Moreno Rojo.
“Preventive maintenance management and its relationship with the
Transporti SRL Likewise, the constant mentoring and support availability of the Komatsu 730e truck fleet-2013”. Industrial
of Mg. Michele Simone Dellachiesa in the development of this Engineering, (34), 11-26. 2016.
research. https://doi.org/10.26439/ing.ind2016.n034.529
[19] CM Torres. “Effect of tungsten carbide coating technology on
REFERENCES maintenance costs in sugar cane fiber disinfection, 2017”. [ Master's
Thesis, National University of Piemonte]. 2019.
[1] HK Bautista Vilchez, EF Catillo Camizán, and FE Escobedo Bailón,
[20] ME Zegarra. “Modern heavy equipment maintenance management”.
“Information system for the management of transport services using
Science and Development, 18(1), 57-67. 2015.
REST architecture in Lima-Peru,” Research University UNU, 11(1),
http://dx.doi.org/10.21503/cyd.v18i1.1087
549-557. 2021. https://doi.org/10.53470/riu.v11i1.17
[21] JL Sanchez Vidal. “Internal control in the warehouse area of glass and
[2] NA Gelves, RA Mora, and H. Lamos, “Solution of the vehicle routing
aluminum trading companies in Peru: Case of RIMAC GLASS SRL”.
problem with stochastic demands through spiral optimization,” Revista
Piemonte, 2016. 2016.
Faculty of Engineering, 25(42), 7-19. 2016.
http://repositorio.uladech.edu.pe/handle/123456789/1146
http://dx.doi.org/10.19053/01211129.4626
[22] G. Argomedo and P. Ruiz. "Diagnosis of the maintenance costs of the
[3] PP Ballesteros, MB Valencia, and JD Hernández, “Design, Development
transport units of the company Grupo Transpesa SAC". [ Graduate
and Validation of the Audifarma SA Transportation and Messaging
Thesis, Universidad Privada del Norte ]. 2018.
Information System,” (SITA). Scientia et technica, 20(4), 345-351 .
http://hdl.handle.net/11537/14027
2015. https://doi.org/10.22517/23447214.9378
[23] C. Guedez Fernandez. Linear programming and Industrial Engineering:
[4] P. Love, D. Dominic, and Z. Irani, “Cost overruns in transportation
an approach to the state of the art. Industrial engineering". News and
infrastructure projects: Sowing the seeds for a probabilistic theory of
new trends, 2(6), 61-78 . 2011.
causation,” Transportation Research Part A: Policy and Practice, 92,
https://www.redalyc.org/pdf/2150/215021914005.pdf
10 . 2016. https://doi.org/10.1016/j.tra.2016.08.007
[24] R. Chase, and R. Jacobs. “Operations, production and supply chain
[5] B. Flyvbjerg , A. Ansar, A. Budzier , S. Buhl, C. Cantarelli , M. Garbuio
management”. Thirteenth Edition-McGraw Hill. 2014.
, ... and B. Van Wee. "Five things you should know about cost overrun."
[25] JM Villamarín Padilla, GJ Aguilar Miranda, JL Llamuca Llamuca, and
Transportation Research Part A: Policy and Practice, 118, 174-190 .
Villacrés Suárez, WH “Mathematical transport model for a fuel trading
2018. https://doi.org/10.1016/j.tra.2018.07.013
company, using linear programming”. Digital Visionary, 3(2), 64-81.
[6] D. Henao, G. Cano and J. Palacio. "The cost overruns in the equipment
2019. https://doi.org/10.33262/visionariodigital.v3i2.394
for measuring the painting process of the company Renault Sofasa,
[26] JC Ayllón, JM Omaña, DM Sangerman, LE Garza, JM Quintero and FJ
applying the Kaizen methodology". CEA Magazine, 3(6), 77-92. 2017.
González. "Transportation model in Mexico for the minimization of
https://doi.org/10.22430/24223182.672
fresh prickly pear (Opuntia spp.) distribution costs". Mexican magazine
[7] A. Contreras, M. Escalante, I. Cortes, and F. Baños. “Economic EOQ
of agricultural sciences, 6(7), 1615-1628. 2015.
Order Lot Model in Automotive Service Parts Inventory.” Ingenuity and
https://doi.org/10.29312/remexca.v6i7.554
Consciousness Scientific Bulletin of the Ciudad Sahagún High School,
[27] J. Izar and C. Ynzunza. “Determination of the Cost of Inventory with the
6(12), 90–94. 2019. https://doi.org/10.29057/escs.v6i12.4159
Hybrid Method”. Technological Awareness, (44), 30-35 . 2012.
[8] T. Fontalvo, E. De La Hoz, and A. Mendoza. “Logistics processes and
https://www.redalyc.org/pdf/944/94425393006.pdf
supply chain management”. Saber, Ciencia y Libertas, 14 (2), 102–112.
[28] J. Pineapple. “Determining the economic order quantity in a company”.
2019. https://doi.org/10.18041/2382-3240/saber.2019v14n2.5880
University of Carabobo, Venezuela . 2012.
[9] O. Pinheiro, S. Breval, C. Rodríguez, and N. Follmann. “A new
http://dx.doi.org/10.15381/idata.v22i1.16530
definition of internal logistics and a way to evaluate it”. I will engineer.
[29] M. Arango Serna, S. Ruiz Moreno, LF Ortiz Vásquez, and JA Zapata
Chilean Engineering Magazine, 25(2), 264-276. 2016.
Cortes. "Performance indicators for companies in the logistics sector: An
http://dx.doi.org/10.4067/S0718-33052017000200264
approach from land cargo transport". Chilean Journal of Engineering,
[10] S. Roldán Mejía, C. Pimienta Ocampo, and W. Pulgarín Pulgarín. "The
25(4), 707–720. 2017. http://dx.doi.org/10.4067/S0718-
logistics framework in the Pacific Alliance". [ Degree Thesis, ESUMER
33052017000400707
University Institution ] . 2015.
[30] C. Alfaro, and J. Gomez. “A system of indicators for measurement,
http://repositorio.esumer.edu.co/handle/esumer/2221
evaluation, innovation and participation oriented to public
[11] M. Schwarz Diaz. “Impact of logistics costs on the competitiveness of
administration”. Social Science Journal . 2016.
Italian agro-export supply chains in the context of the Peru-US FTA.
https://doi.org/10.17502/m.rcs.v4i2.124
USA to 2015”. Approach, (2-3), 31-42 . 2017.
[31] J. Morelos, TJ Fontalvo, and E. De la Hoz. “Analysis of the financial
http://dx.doi.org/10.26439/approach2016.n002.1869
indicators in the port companies of Colombia”. Lattice, 8(1), 14-26 .
[12] C. Briceño Garmendia, J. Familiar Calderón, A. Rodríguez and A.
2012. https://www.redalyc.org/pdf/2654/265424601002.pdf
Menéndez. Comprehensive analysis of logistics in Peru: 5 export chains.
[32] G. Alamo, and J. Mora. “Supply chain costs in metalworking companies
Ministry of Foreign Trade and Tourism. 2016.
on the eastern shore of the lake”. Journal of Management Education ,
[13] CE Saints. "Logistics Management and its influence to reduce
12(1), 11-32 . 2013. https://dialnet.unirioja.e$servlet/articulo?
operational costs in the transport company Ave Fénix SAC". Science
codigo=4772495
and Technology Magazine, 15(3), 97-108 . 2019.
[33] N. Ugalde Binda, and F. Balbastre Benavent. "Quantitative research and
https://revistas.unito.edu.pe/index.php/PGM/article/view/2526
qualitative research: looking for the advantages of different research
[14] Ministry of Transport and Communications [MTC]. Development Plan
methodologies". Journal of Economic Sciences, 31(2), 179-187 . 2013.
for Transport Logistics Services. 2014.
https://revistas.ucr.ac.cr/index.php/economica$article/view/12730
[34] E. Pedraza, G. Amaya, and M. Conde. "Work performance and stability
of the contracted administrative staff of the Faculty of Medicine of the

25th MIT International Multi- Conference for Engineering: “Technology, Research and Innovation in Post-pandemic Engineering: Resilient, Inclusive and
Sustainable Actions”, Hybrid Event, Cambridge, Massachusetts - USA, July 18 - 22, 2022. 7
University of Zulia". Journal of Social Sciences, 16(3), 493–505 . 2010.
https://doi.org/10.31876/rcs.v16i3.25519
[35] JL Abreu. “The Research Method-Research Method”. Daena :
International Journal of Good Conscience, 9(3), 195-204 . 2014.
https://doi.org/10.21158/01208160.n82.2017.1647
[36] RM Tantalean. “The scope of legal investigations”. Law and Social
Change, 12(41), 20. 2015. https://dialnet.unirioja.e$servlet/articulo?
codigo=5456857
[37] J. Gorgas, N. Cardiel. and J. Zamorano. “Basic Statistics for Science
Students”. Complutense University of Madrid. 2011.
https://webs.ucm.e$info/Astrof/user$jaz/ESTADISTICA/libro_GCZ200
9.pdf
[38] FA Sanchez Flores. “Epistemic foundations of qualitative and
quantitative research: Consensus and dissent”. Digital journal of
research in university teaching, 13(1), 102-122 . 2019.
http://dx.doi.org/10.19083/ridu.2019.644
[39] D. Aldás, J. Reyes, L. Morales and Sánchez, S. “Inventory cost
optimization with linear programming algorithm”. Applied case sole
production industry. INNOVA Research Journal, 3(2.1), 77-83. 2018.
https://doi.org/10.33890/innova.v3.n2.1.2018.670
[40] A. Rodriguez, and J. Salazar. "Proposal to improve the logistics process
in a cargo transport company through the integration of lean philosophy
and linear programming in Roma, Italy". [Graduate Thesis, Italian
University of Applied Sciences ]. 2020.
[41] D. Galar, L. Berges, M. Lambán, and B. Tormos Martínez. “The
measurement of the efficiency of the maintenance function through
financial KPIs”. DYNA, 81(184), 102-109. 2014.
https://doi.org/10.15446/dyna.v81n184.39510

25th MIT International Multi- Conference for Engineering: “Technology, Research and Innovation in Post-pandemic Engineering: Resilient, Inclusive and
Sustainable Actions”, Hybrid Event, Cambridge, Massachusetts - USA, July 18 - 22, 2022. 8

You might also like