Kingdom of Saudi Arabia

Client:

National Guard Health Affairs

PROJECT NAME:
1 2 4 5 6 7 8 9 10
NATIONAL GUARD HEALTH AFFAIRS
SPECIALIZED HOSPITALS IN REGIONS

Consultants :

TOILET

007
TOILET
12 kg MULTIPURPOSE DRY
005
CHEMICAL FIRE N 2369600

SAND
EXTINGUISHER TOILET KEY PLAN
CONTAINER(INSIDE THE 006 N 2369400

VAULT)
SAND CORRIDOR
CONTAINER(INSIDE THE
VAULT) 001 N 2369200

ELEC. ROOM
B 003
FE-2 N 2369000

?
N 2368800

N 2368600

FOAM STATION, CONTRACTER TO PROVIDE FE-2


ALL NECESSARY SHELTERS REQUIRED TO
PROTECT FOAM TANK. N 2368400

OFFICE

E 648600

E 648800

E 649000

E 649200

E 649400

E 649600

E 649800

E 650000

E 650200

E 650400
002

SITE ORIENTATION
FE-1
C
NORTH
FOR CONTINUATION
QIBLA
REFER TO EXTERNAL
sand container & FE-1 are inside vault NETWORK
nearby underground tank

LEGEND

HYDRANT CABINET, FOR CONTINUATION, REFER


TO EXTRNAL NETWORK

SAND CONTAINER
AFE-1 AFE-1

FE-5

12 kg MULTIPURPOSE DRY CHEMICAL NOTES


FIRE EXTINGUISHER

1. THE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL


OTHER ARCHITECTURE, STRUCTURE, ELECTRICAL AND ENVIRONMENT
DRAWINGS.
2. FOR GENERAL NOTES, LEGEND AND SYMBOLS REFER TO SYMBOL &
LEGENDS DRAWINGS.
3. FOR SITE PLANS REFER TO SITE PLAN DRAWINGS.
4. FOR MISCELLANEOUS DETAILS REFER TO MISCELLANEOUS
DRAWINGS SET.
5. FOR BUILDING MANAGEMENT SYSTEM DRAWINGS REFER TO
BUILDING MANAGEMENT SYSTEM DRAWINGS SET.
6. CYLINDER SIZES, CAPACITY OF NOVEC & NUMBER OF NOZZLES ARE
TO BE CALCULATED BY MANUFACTURER BASED ON FINAL ROOM
DIMENSIONS / VOLUME AND SUBMITTED FOR APPROVAL AS A
SAND
PRE-ENGINEERED SYSTEM.
CONTAINER(INSIDE THE
7. NOVEC HYDRAULIC CALCULATIONS TO BE PART OF SUBMISSION TO
VAULT)
CONSULTANT FOR APPROVAL PRIOR TO INSTALLATION.
HYDRANT CABINET, FOR CONTINUATION, REFER 8. PIPE SIZES SHOWN ARE NOMINAL PIPE DIAMETER.
TO EXTRNAL NETWORK 9. FOR EXTENDED WALLS IN THE FALSE CEILING, SLEEVES &
OPENINGS ARE TO BE COORDINATED WITH ELECTRICAL AND
MECHANICAL UTILITIES.
10. PROVIDE BUTTONS, TABS & MARKERS TO IDENTIFY LOCATION OF
SAND CONCEALED VALVES & EQUIPMENT FOR ACCESSIBILITY.
SAND CONTAINER CONTAINER(OUTSIDE THE 11. ALL FIREFIGHTING ISOLATION VALVES TO BE MONITORED
AFE-1
VAULT) THROUGH MAIN FIRE ALARM PANEL.
12. FIRE STOPPING MATERIAL SHALL BE PROVIDED FOR PIPE
FE-5 PENETRATION AT FIRE RATED WALLS OR BUILDING SLABS.
12 kg MULTIPURPOSE DRY
13. EXECUTION OF WORK ON SITE SHOULD BE BASED ON FINAL
CHEMICAL FIRE
DESIGN / SHOP DRAWINGS.
EXTINGUISHER

12 kg MULTIPURPOSE DRY CHEMICAL


FIRE EXTINGUISHER

FOR CONSTRUCTION
G sand container & FE-1 are SEPTEMBER 2014
inside vault
nearby underground tank

0 30-09-2014 APPROVED ISSUE J.A.A


Rev Date Description Approved
Revisions
Date 30-09-2014
Job No. S14061-0100D
Scale 1/100
Drawn A.K.
Designed S.Y.
Checked J.A.A.
Approved N.E.
Title

Sheet No.

Building Type
Project No.

Serial No.
Drawing
Phase

Trade

Rev.
Site
MF-GROUND FLOOR PLAN