Prosedur Site Accptance Test (Sat) MV Switchgear
Prosedur Site Accptance Test (Sat) MV Switchgear
MV SWITCHGEAR
A. Prosedur SAT (Site Acceptance Procedure) dan Commisioning Kubikel MV
Switchgear
Peralatan :
Prosedur
1. Pemeriksaan Kubikel:
• Lakukan pengujian system mekanis kubikel, switching device, removable parts dan system
interlock mekanik dan elektik masing-masing harus diuji sebanyak 5 siklus open/close atau
rack in/out.
• Setting dan test fungsi power meter
▪ Lakukan setting dan pengujian fungsi Rele proteksi 50/51, 50N/51N, 27 dan 59.
2. Setelah energize pemeriksaan:
Measured Current
Phase definite time Over Current Protection (50) Setting (In sec)
time dial (td)
Label : Curve
Type : Expect Time
8.1.2 Serial No : Inject (In)
Trip time (mS)
Recloser
Measured Current
Measured Current
Measured Current