Professional Documents
Culture Documents
GIRDER LINE-1
H H
GIRDER LINE-2
2.5% SLOPE
General Comments:
G G
GIRDER LINE-3
ED-1
GR-6 GR-7 GR-8 GR-9 GR-10
2.5% SLOPE
ED-1
ED-1
D D
ED-1
GR-11 GR-12 GR-13 GR-14 GR-15
C C
B B
PRE-CAMBERING DETAIL
CLIENT: AUTHORITY ENGINEER CONTRACTOR: DRAWN BY: PROJECT:
GAWAR CONSTRUCTION LTD.
DEVELOPMENT OF THE SECTION OF RING
P.W.D. GOVT. OF DELHI EXECUTIVE ENGINEER, PWD SF-01, JMD GALLERIA, SECTOR-48, SOHNA ROAD, DESIGNED BY:
ROAD AT SARAI KALE KHAN T-JUNCTION
GURGAON-122002 (HR.) INDIA ALONGSIDE THE EXISTING HALF FLYOVER
TEL.: +91-124-4854001 FAX.:+91-124-4854001/02 CHECKED BY: BETWEEN CHAINAGE 1000M TO 2000M IN THE
E-mail :gcl@gawar.in STATE OF DELHI.
APPROVED BY:
12 11 10 9 8 7 6 5 4 3 2 1