BIDDING DOCUMENT
for the
1
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Preface
These Philippine Bidding Documents (PBDs) for the procurement of
Infrastructure Projects (hereinafter referred to also as the “Works”) through
Competitive Bidding have been prepared by the Government of the Philippines for
use by all branches, agencies, departments, bureaus, offices, or instrumentalities of
the government, including government-owned and/or -controlled corporations,
government financial institutions, state universities and colleges, local government
units, and autonomous regional government. The procedures and practices
presented in this document have been developed through broad experience, and are
for mandatory use in projects that are financed in whole or in part by the Government
of the Philippines or any foreign government/foreign or international financing
institution in accordance with the provisions of the 2016 revised Implementing Rules
and Regulations (IRR) of Republic Act (RA) No. 9184.
The PBDs are intended as a model for admeasurements (unit prices or unit
rates in a bill of quantities) types of contract, which are the most common in Works
contracting.
The Bidding Documents shall clearly and adequately define, among others: (i)
the objectives, scope, and expected outputs and/or results of the proposed contract;
(ii) the eligibility requirements of Bidders; (iii) the expected contract duration; and (iv)
the obligations, duties, and/or functions of the winning Bidder.
Care should be taken to check the relevance of the provisions of the PBDs
against the requirements of the specific Works to be procured. If duplication of a
subject is inevitable in other sections of the document prepared by the Procuring
Entity, care must be exercised to avoid contradictions between clauses dealing with
the same matter.
a. All the documents listed in the Table of Contents are normally required
for the procurement of Infrastructure Projects. However, they should be
adapted as necessary to the circumstances of the particular Project.
Page 2
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 3
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
TABLE OF CONTENTS
Page 4
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
7. Warranty......................................................................................................26
8. Liability of the Contractor............................................................................26
9. Termination for Other Causes.....................................................................26
10. Dayworks.....................................................................................................27
11. Program of Work.........................................................................................27
12. Instructions, Inspections and Audits...........................................................27
13. Advance Payment.......................................................................................27
14. Progress Payments.....................................................................................27
15. Operating and Maintenance Manuals.........................................................28
Section V. Special Conditions of Contract........................................29
Section VI. Specifications...................................................................32
Section VII. Drawings..........................................................................33
Section VIII. Bill of Quantities...........................................................111
Section IX. Checklist of Technical and Financial Documents.......112
Page 5
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Glossary of
Terms, Abbreviations, and Acronyms
ABC –Approved Budget for the Contract.
ARCC – Allowable Range of Contract Cost.
BAC – Bids and Awards Committee.
Bid – A signed offer or proposal to undertake a contract submitted by a bidder in
response to and in consonance with the requirements of the bidding documents.
Also referred to as Proposal and Tender.(2016 revised IRR, Section 5[c])
Bidder – Refers to a contractor, manufacturer, supplier, distributor and/or consultant
who submits a bid in response to the requirements of the Bidding Documents. (2016
revised IRR, Section 5[d])
Bidding Documents – The documents issued by the Procuring Entity as the bases
for bids, furnishing all information necessary for a prospective bidder to prepare a bid
for the Goods, Infrastructure Projects, and/or Consulting Services required by the
Procuring Entity. (2016 revised IRR, Section 5[e])
BIR – Bureau of Internal Revenue.
BSP – Bangko Sentral ng Pilipinas.
CDA – Cooperative Development Authority.
Consulting Services – Refer to services for Infrastructure Projects and other types
of projects or activities of the GOP requiring adequate external technical and
professional expertise that are beyond the capability and/or capacity (1-Lot) of the
GOP to undertake such as, but not limited to: (i) advisory and review services; (ii)
pre-investment or feasibility studies; (iii) design; (iv) construction supervision; (v)
management and related services; and (vi) other technical services or special
studies. (2016 revised IRR, Section 5[i])
Contract – Refers to the agreement entered into between the Procuring Entity and
the Supplier or Manufacturer or Distributor or Service Provider for procurement of
Goods and Services; Contractor for Procurement of Infrastructure Projects; or
Consultant or Consulting Firm for Procurement of Consulting Services; as the case
may be, as recorded in the Contract Form signed by the parties, including all
attachments and appendices thereto and all documents incorporated by reference
therein.
Contractor – is a natural or juridical entity whose proposal was accepted by the
Procuring Entity and to whom the Contract to execute the Work was awarded.
Contractor as used in these Bidding Documents may likewise refer to a supplier,
distributor, manufacturer, or consultant.
CPI – Consumer Price Index.
DOLE – Department of Labor and Employment.
DTI – Department of Trade and Industry.
Page 6
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 7
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Apart from the essential items listed in the Bidding Documents, the IB should also
indicate the following:
a. The date of availability of the Bidding Documents, which shall be from the
time the IB is first advertised/posted until the deadline for the submission
and receipt of bids;
b. The place where the Bidding Documents may be acquired or the website
where it may be downloaded;
Page 8
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
HEADQUARTERS
PHILIPPINE ARMY
Fort Andres Bonifacio, Metro Manila
2. The Philippine Army now invites bids for the above Procurement Project.
Completion of work requires Two Hundred Forty (240) Calendar days
reckoned from the date of receipt of Notice to Proceed (NTP) or Notice of Site
Possession whichever comes later. Bidders should have completed a contract
similar to the Project. The description of an eligible bidder is contained in the
Bidding Documents, particularly, in Section II (Instructions to Bidders).
4. Interested bidders may obtain further information from Philippine Army and
inspect the Bidding Documents at the address given below from 8:00 am to
5:00 pm during office hours.
Page 9
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
8. All bids must be accompanied by a bid security in any of the acceptable forms
and in the amount stated in ITB Clause 16.
Page 10
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
10. The Philippine Army reserves the right to reject any and all bids, declare a
failure of bidding, or not award the contract at any time prior to contract award
in accordance with Sections 35.6 and 41 of the 2016 revised Implementing
Rules and Regulations (IRR) of RA No. 9184, without thereby incurring any
liability to the affected bidder or bidders.
Page 11
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 12
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
1. Scope of Bid
The Procuring Entity, Philippine Army invite bids for the Construction of
Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot) with Project Identification Number ENG’G
PABAC3 008-22 (3rd Rebid).
2. Funding Information
2.1. The GOP through the source of funding as indicated below for
Calendar Year 2022 in the amount of Forty-Two Million Seven
Hundred Eighty-Six Thousand One Hundred Thirty-Eight Pesos and
88/100 (PhP42,786,138.88).
3. Bidding Requirements
The Bidding for the Project shall be governed by all the provisions of RA No.
9184 and its 2016 revised IRR, including its Generic Procurement Manual and
associated policies, rules and regulations as the primary source thereof, while
the herein clauses shall serve as the secondary source thereof.
Any amendments made to the IRR and other GPPB issuances shall be
applicable only to the ongoing posting, advertisement, or invitation to bid by
the BAC through the issuance of a supplemental or bid bulletin.
The Bidder, by the act of submitting its Bid, shall be deemed to have
inspected the site, determined the general characteristics of the contracted
Works and the conditions for this Project, such as the location and the nature
of the work; (b) climatic conditions; (c) transportation facilities; (c) nature and
condition of the terrain, geological conditions at the site communication
facilities, requirements, location and availability of construction aggregates
and other materials, labor, water, electric power and access roads; and (d)
other factors that may affect the cost, duration and execution or
implementation of the contract, project, or work and examine all instructions,
forms, terms, and project requirements in the Bidding Documents.
The Procuring Entity, as well as the Bidders and Contractors, shall observe
the highest standard of ethics during the procurement and execution of the
contract. They or through an agent shall not engage in corrupt, fraudulent,
collusive, coercive, and obstructive practices defined under Annex “I” of the
Page 13
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
2016 revised IRR of RA No. 9184 or other integrity violations in competing for
the Project.
5. Eligible Bidders
5.3. For Foreign-funded Procurement, the Procuring Entity and the foreign
government/foreign or international financing institution may agree on
another track record requirement, as specified in the Bidding Document
prepared for this purpose.
5.4. The Bidders shall comply with the eligibility criteria under Section
23.4.2 of the 2016 IRR of RA No. 9184.
7. Sub-contracts
7.1. The Bidder may subcontract portions of the Project to the extent
allowed by the Procuring Entity as stated herein, but in no case more
than fifty percent (50%) of the Project. However, the Procuring Entity
has prescribed that Sub-contracting is not allowed.
7.2. Sub-contracting of any portion of the Project does not relieve the
Contractor of any liability or obligation under the Contract. The
Supplier will be responsible for the acts, defaults, and negligence of
any sub-contractor, its agents, servants, or workmen as fully as if these
were the Contractor’s own acts, defaults, or negligence, or those of its
agents, servants, or workmen.
8. Pre-Bid Conference
The Procuring Entity will hold a pre-bid conference for this Project on the
specified date and time and either at its physical address Office of the PA
Bids and Awards Committee 3 (PABAC3) and/or through
Page 14
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
10.1. The first envelope shall contain the eligibility and technical documents
of the Bid as specified in Section IX. Checklist of Technical and
Financial Documents.
10.2. If the eligibility requirements or statements, the bids, and all other
documents for submission to the BAC are in foreign language other
than English, it must be accompanied by a translation in English, which
shall be authenticated by the appropriate Philippine foreign service
establishment, post, or the equivalent office having jurisdiction over the
foreign bidder’s affairs in the Philippines. For Contracting Parties to the
Apostille Convention, only the translated documents shall be
authenticated through an apostille pursuant to GPPB Resolution No.
13-2019 dated 23 May 2019. The English translation shall govern, for
purposes of interpretation of the bid.
10.3. A valid PCAB License is required, and in case of joint ventures, a valid
special PCAB License, and registration for the type and cost of the
contract for this Project. Any additional type of Contractor license or
permit shall be indicated in the BDS.
10.5. A List of Contractor’s major equipment units, which are owned, leased,
and/or under purchase agreements, supported by proof of ownership,
certification of availability of equipment from the equipment
lessor/vendor for the duration of the project, as the case may be, must
meet the minimum requirements for the contract set in the BDS.
11.1. The second bid envelope shall contain the financial documents for the
Bid as specified in Section IX. Checklist of Technical and Financial
Documents.
Page 15
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
11.2. Any bid exceeding the ABC indicated in paragraph 1 of the IB shall not
be accepted.
Bidders shall submit offers that comply with the requirements of the Bidding
Documents, including the basic technical design as indicated in the drawings
and specifications. Unless there is a value engineering clause in the BDS,
alternative Bids shall not be accepted.
All bid prices for the given scope of work in the Project as awarded shall be
considered as fixed prices, and therefore not subject to price escalation during
contract implementation, except under extraordinary circumstances as
determined by the NEDA and approved by the GPPB pursuant to the revised
Guidelines for Contract Price Escalation guidelines.
14.1. Bid prices may be quoted in the local currency or tradeable currency
accepted by the BSP at the discretion of the Bidder. However, for
purposes of bid evaluation, Bids denominated in foreign currencies
shall be converted to Philippine currency based on the exchange rate
as published in the BSP reference rate bulletin on the day of the bid
opening.
15.1. The Bidder shall submit a Bid Securing Declaration or any form of Bid
Security in the amount indicated in the BDS, which shall be not less
than the percentage of the ABC in accordance with the schedule in the
BDS.
15.2. The Bid and bid security shall be valid until 120 calendar days from
date of the Opening of Bids. Any bid not accompanied by an
acceptable bid security shall be rejected by the Procuring Entity as
non-responsive.
Each Bidder shall submit one copy of the first and second components of its
Bid.
Page 16
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
The Procuring Entity may request additional hard copies and/or electronic
copies of the Bid. However, failure of the Bidders to comply with the said
request shall not be a ground for disqualification.
18.1. The BAC shall open the Bids in public at the time, on the date, and at
the place specified in paragraph 9 of the IB. The Bidders’
representatives who are present shall sign a register evidencing their
attendance. In case videoconferencing, webcasting or other similar
technologies will be used, attendance of participants shall likewise be
recorded by the BAC Secretariat.
19.2. If the Project allows partial bids, all Bids and combinations of Bids as
indicated in the BDS shall be received by the same deadline and
opened and evaluated simultaneously so as to determine the Bid or
combination of Bids offering the lowest calculated cost to the Procuring
Entity. Bid Security as required by ITB Clause 16 shall be submitted
for each contract (lot) separately.
19.3. In all cases, the NFCC computation pursuant to Section 23.4.2.6 of the
2016 revised IRR of RA No. 9184 must be sufficient for the total of the
ABCs for all the lots participated in by the prospective Bidder.
Page 17
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Within a non-extendible period of five (5) calendar days from receipt by the
Bidder of the notice from the BAC that it submitted the Lowest Calculated Bid,
the Bidder shall submit its latest income and business tax returns filed and
paid through the BIR Electronic Filing and Payment System (eFPS), and other
appropriate licenses and permits required by law and stated in the BDS.
The documents required in Section 37.2 of the 2016 revised IRR of RA No.
9184 shall form part of the Contract. Additional Contract documents are
indicated in the BDS.
Page 18
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
This Section is intended to assist the Procuring Entity in providing the specific
information in relation to corresponding clauses in the ITB and has to be prepared
for each specific procurement.
The Procuring Entity should specify in the BDS information and requirements
specific to the circumstances of the Procuring Entity, the processing of the
procurement, and the bid evaluation criteria that will apply to the Bids. In
preparing the BDS, the following aspects should be checked:
Page 19
Construction of Operational Support Facilities for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
General
Key Personnel Relevant Experience
Experience
Project In-Charge (Licensed Minimum (5)
Minimum three (3) Years
Civil Engineer) Years
Registered Electrical Minimum (5)
10.4 Minimum three (3) Years
Engineer Years
Minimum (5)
Master Plumber Minimum three (3) Years
Years
Minimum (5)
Safety Officer Minimum three (3) Years
Years
Minimum (5)
Materials Engineer Minimum three (3) Years
Years
Minimum (5)
Construction Foreman Minimum three (3) Years
Years
The minimum major equipment requirements are the following:
12 No further instructions
15.1 The bid security shall be in the form of a Bid Securing Declaration or any
of the following forms and amounts:
Page 20
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 21
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
(In case of Joint Venture, partners must present/ submit above document.)
Page 22
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 23
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 24
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
1. Scope of Contract
This Contract shall include all such items, although not specifically mentioned,
that can be reasonably inferred as being required for its completion as if such
items were expressly mentioned herein. All the provisions of RA No. 9184 and
its 2016 revised IRR, including the Generic Procurement Manual, and
associated issuances, constitute the primary source for the terms and
conditions of the Contract, and thus, applicable in contract implementation.
Herein clauses shall serve as the secondary source for the terms and
conditions of the Contract.
This is without prejudice to Sections 74.1 and 74.2 of the 2016 revised IRR of
RA No. 9184 allowing the GPPB to amend the IRR, which shall be applied to
all procurement activities, the advertisement, posting, or invitation of which
were issued after the effectivity of the said amendment.
3. Possession of Site
4.1. The Procuring Entity shall give possession of all or parts of the Site to
the Contractor based on the schedule of delivery indicated in the SCC,
which corresponds to the execution of the Works. If the Contractor
suffers delay or incurs cost from failure on the part of the Procuring
Entity to give possession in accordance with the terms of this clause,
the Procuring Entity’s Representative shall give the Contractor a
Contract Time Extension and certify such sum as fair to cover the cost
incurred, which sum shall be paid by Procuring Entity.
4.2. If possession of a portion is not given by the above date, the Procuring
Entity will be deemed to have delayed the start of the relevant activities.
The resulting adjustments in contract time to address such delay may
be addressed through contract extension provided under Annex “E” of
the 2016 revised IRR of RA No. 9184.
The Contractor shall employ the key personnel named in the Schedule of Key
Personnel indicating their designation, in accordance with ITB Clause 10.3
and specified in the BDS, to carry out the supervision of the Works.
The Procuring Entity will approve any proposed replacement of key personnel
only if their relevant qualifications and abilities are equal to or better than
those of the personnel listed in the Schedule.
Page 25
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
5. Performance Security
5.1. Within ten (10) calendar days from receipt of the Notice of Award from
the Procuring Entity but in no case later than the signing of the contract
by both parties, the successful Bidder shall furnish the performance
security in any of the forms prescribed in Section 39 of the 2016
revised IRR.
5.2. The Contractor, by entering into the Contract with the Procuring Entity,
acknowledges the right of the Procuring Entity to institute action
pursuant to RA No. 3688 against any subcontractor be they an
individual, firm, partnership, corporation, or association supplying the
Contractor with labor, materials and/or equipment for the performance
of this Contract.
The Contractor, in preparing the Bid, shall rely on any Site Investigation
Reports referred to in the SCC supplemented by any information obtained by
the Contractor.
7. Warranty
7.1. In case the Contractor fails to undertake the repair works under Section
62.2.2 of the 2016 revised IRR, the Procuring Entity shall forfeit its
performance security, subject its property(ies) to attachment or
garnishment proceedings, and perpetually disqualify it from
participating in any public bidding. All payables of the GOP in his favor
shall be offset to recover the costs.
Subject to additional provisions, if any, set forth in the SCC, the Contractor’s
liability under this Contract shall be as provided by the laws of the Republic of
the Philippines.
If the Contractor is a joint venture, all partners to the joint venture shall be
jointly and severally liable to the Procuring Entity.
Page 26
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
10. Dayworks
Subject to the guidelines on Variation Order in Annex “E” of the 2016 revised
IRR of RA No. 9184, and if applicable as indicated in the SCC, the Dayworks
rates in the Contractor’s Bid shall be used for small additional amounts of
work only when the Procuring Entity’s Representative has given written
instructions in advance for additional work to be paid for in that way.
11.1. The Contractor shall submit to the Procuring Entity’s Representative for
approval the said Program of Work showing the general methods,
arrangements, order, and timing for all the activities in the Works. The
submissions of the Program of Work are indicated in the SCC.
11.2. The Contractor shall submit to the Procuring Entity’s Representative for
approval an updated Program of Work at intervals no longer than the
period stated in the SCC. If the Contractor does not submit an updated
Program of Work within this period, the Procuring Entity’s
Representative may withhold the amount stated in the SCC from the
next payment certificate and continue to withhold this amount until the
next payment after the date on which the overdue Program of Work has
been submitted.
The Contractor shall permit the GOP or the Procuring Entity to inspect the
Contractor’s accounts and records relating to the performance of the
Contractor and to have them audited by auditors of the GOP or the Procuring
Entity, as may be required.
The Procuring Entity shall, upon a written request of the Contractor which
shall be submitted as a Contract document, make an advance payment to the
Contractor in an amount not exceeding fifteen percent (15%) of the total
contract price, to be made in lump sum, or at the most two installments
according to a schedule specified in the SCC, subject to the requirements in
Annex “E” of the 2016 revised IRR of RA No. 9184.
The Contractor may submit a request for payment for Work accomplished.
Such requests for payment shall be verified and certified by the Procuring
Entity’s Representative/Project Engineer. Except as otherwise stipulated in
Page 27
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
the SCC, materials and equipment delivered on the site but not completely put
in place shall not be included for payment.
15.1. If required, the Contractor will provide “as built” Drawings and/or
operating and maintenance manuals as specified in the SCC.
15.2. If the Contractor does not provide the Drawings and/or manuals by the
dates stated above, or they do not receive the Procuring Entity’s
Representative’s approval, the Procuring Entity’s Representative may
withhold the amount stated in the SCC from payments due to the
Contractor.
Page 28
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
However, no special condition which defeats or negates the general intent and
purpose of the provisions of the GCC should be incorporated herein.
Page 29
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Project Duration
Project
(No. of Calendar days)
Within Two Hundred Forty
2
Construction of Operational Support (240) Calendar days upon
Facilities Phase II for 103IBde, 1ID, PA receipt of Notice to Proceed or
at Kampo Ranao, Marawi City (1-Lot) Notice of Site Possession
whichever comes later
The Start Date of construction is within Seven (7) Calendar Days upon receipt
of the Notice to Proceed (NTP) by the winning bidder provided that Notice of
4.1 Site Possession is issued within the same period. Notice of Site Possession
will be issued by Commander 103IBde, 1ID, PA or his duly authorized
representative
Performance Security
Amount of Performance
Security
Form of Performance Security (Not less than the required
percentage of the Total
Contract Price)
a. Cash or casher’s/manager’s check issued
by a Universal or Commercial Bank
5
b. Bank draft/guarantee or irrevocable letter
Ten percent (10%) of the
of credit issued by Universal or Commercial
Total Contract Price
Bank. However, provided that it shall be
confirmed or authenticated by a Universal or
Commercial Bank, if issued by a foreign bank.
c. Surety bond callable upon demand issued
by a surety or insurance company duly certified Thirty percent (30%) of the
by the Insurance Commission as authorized to Total Contract Price
issue such security.
6 Site Investigation Reports are not applicable.
The warranty against Structural Defects/Failures, except those occasioned-on
7.2 force majeure, shall cover the period of Fifteen (15) Years reckoned from the
date of issuance of the Certificate of Final Acceptance by the Procuring Entity.
Liquidated Damages:
Page 30
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
The Contractor shall submit the Program of Works and Project Management
11.1 Tools to the Procuring Entity’s Representative within seven (7) calendar days
from receipt of the Notice of Award.
11.2 No further instructions.
The amount of the advance payment is 15% of the Contract Price which
shall be given to the contractor not later than 15 calendar days from receipt by
the Procuring Entity of the contractor’s request and the submission by the
contractor of an irrevocable standby letter of credit of equivalent value from a
commercial bank, a bank guarantee or a surety bond callable on demand,
13 issued by a surety or insurance company duly licensed by the Insurance
Commission and confirmed by the Procuring Entity together with duly received
Notice of Site Possession.
The letter request for release of 15% advance payment shall also be
accompanied with a list of construction materials to be procured using the
advance payment.
The terms of payment shall be progress payment in four (4) installments.
Page 31
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 32
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 33
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 34
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 35
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 36
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 37
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 38
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 39
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 40
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 41
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 42
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 43
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 44
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 45
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 46
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 47
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 48
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 49
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 50
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 51
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 52
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 53
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 54
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 55
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 56
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 57
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 58
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 59
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 60
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 61
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 62
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 63
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 64
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 65
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 66
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 67
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 68
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 69
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 70
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 71
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 72
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 73
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 74
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 75
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 76
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 77
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 78
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 79
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 80
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 81
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 82
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 83
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 84
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 85
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 86
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 87
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 88
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 89
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 90
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 91
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 92
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 93
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 94
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 95
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 96
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 97
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 98
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 99
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 100
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 101
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 102
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 103
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 104
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 105
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 106
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 107
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 108
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 109
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 110
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 111
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 01/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
I. Earthworks
excavation 35 cu.m
backfill and compaction 26 cu.m
Sub-Total
II. Concrete Works
p cement 165 bags
sand 9 cu.m
gravel 18 cu.m
12mmØ RSB 172 pcs
10mmØ RSB 237 pcs
GI tie wire #16 35 kgs
Sub-Total
III. Masonry Works
p cement 200 bags
sand 23 cu.m
CHB 4" THK 2,750 pcs
10mmØ RSB 138 pcs
GI tie wire #16 12 kgs
Sub-Total
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 112
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 02/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
IV. Forms & Scaffoldings
form lumber, coco 1,200 bdft
ord plywood 1/4" THK 15 pcs
CW nails (asstd) 40 kls
concrete nails (asstd) 12 kls
Sub-Total
V. Carpentry Works
hadilite ceiling 40 pcs
metal furring 1"x2"x10' joist & hangers 120 pcs
accessories (clip, tox, screw etc) 1 lot
air vent 4 units
kitchen counter / cabinet 1.50 cu.m
Sub-Total
VI. Doors and Windows
D1-0.9m x 2.10m panel door type duco finish w/ 2"x5"
1 set
wood jamb
D2-0.8m x 2.10m panel door type duco finish w/ 2"x5"
2 sets
wood jamb
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 113
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 03/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
D3-0.8m x 2.10m flush door type ord plywood bothside
3 sets
semi duco finish w/ 2"x5" wood jamb
D4-0.60m x 2.10m PVC swing door 1 set
W1-1.20m x 2.40m sliding glass window on alum frame
3 set
analok type w/ alum screen
W2-1.20m x 1.40m sliding glass window on alum frame
4 sets
analok type w/ alum screen
W3-0.90m x 1.40m sliding glass window on alum frame
1 set
analok type w/ alum screen
W4-0.60m x 2.40m awning type glass window on alum
1 set
frame analok type w/ alum screen
W5-0.60m x 0.60m awning type glass window on alum
1 set
frame analok type w/ alum screen
3"x4" door hinges 12 pairs
door lockset 6 sets
heavy duty lever type door lock (main entrance) 1 set
Sub-Total
VII. Roofing Works
pre-painted longspan rib type .5mm 110 sq.m
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 114
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 04/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
pre-painted ridge roll #26 x 8' 12 pcs
texscrew 995 pcs
welding rod 47.5 kls
polycarbonate roofing on tubular steel 10 sq.m
1.2mm x 2"x4"x6m tubular steel 7 pcs
1.0mm x 2"x6" c-bar fascia 14 pcs
1.0mm x 2"x4" c-purlins 30 pcs
1.0mm x 2"x3" c-purlins 8 pcs
3/16"x2"x2" angular bar 34 pcs
sealant 4 tubes
Sub-Total
VIII. Painting Works
concrete neutralizer 6 gals
flat latex white 10 gals
semi-gloss latex white 10 gals
acri color 8 qrts
flat wall enamel 6 gals
qd enamel paint 6 gals
paint thinner 6 gals
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 115
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 05/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
zinc chromate primer 4 gals
patching compound 15 kls
roller brush w/ tray 9" 5 sets
paint brush 3" 4 pcs
sand paper 8 lnm
Sub-Total
IX. Plumbing Works
water closet w/ tank ftngs & accs. 1 unit
PVC pipe 4"Ø x 3m 5 pcs
PVC pipe 2"Ø x 3m 4 pcs
floor drain strainer 2 pcs
PVC wye 4"x4" 4 pcs
4"Ø PVC elbow 45 deg 2 pcs
4"Ø PVC elbow 90 deg 2 pcs
PVC clean out 4" 2 pcs
PVC tee 4"x2" 2 pcs
PVC wye 4"x2" 6 pcs
2"Ø PVC elbow 90 deg 3 pcs
2"Ø PVC elbow 45 deg 3 pcs
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 116
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 06/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
PVC p-trap 2"x2" 2 pcs
lavatory 1 unit
stainless lavatory 1 unit
tissue holder 2 pcs
soap holder 2 pcs
shower assy (telephone type) 2 set
faucet 1/2"Ø 4 pcs
mirror 1 pcs
curtain rod 1 pc
PVC blue pipe 1/2"Ø 6 pcs
PVC blue elbow 90 deg 1/2"Ø 4 pcs
PVC tee 1/2"Ø w/ thread 2 pcs
PVC tee 1/2"Ø 3 pcs
PVC elbow w/ thread 1/2"Ø 6 pcs
1/2" male adaptor 4 pcs
shower valve 1/2"Ø 2 pcs
coupling w/ thread 1/2"Ø 2 pcs
gate valve 1/2"Ø 2 pcs
check valve 1/2"Ø 1 pc
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 117
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 07/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
water meter 1 pc
cement solvent s-blue 2 ltrs
solvent white 1 ltr
teplon tape 3 pcs
Sub-Total
X. Electrical Works
circular lamp led 32W w/ powder coated glass 40"Ø 3 sets
led 10W globe type w/ receptacle 4"Ø 4 sets
led t5 1x18W flourescent box type 2 sets
single gang switch w/ plate & cover 4 sets
two gang switch w/ plate & cover 1 set
three gang switch w/ plate & cover 2 set
3.5mm² THHN wire 2 box
5.5mm² THHN wire 2 box
8.0mm² thwn wire 60 mts
telephone jacketed wire #22/4c 30 mts
coaxial cable wire RG6 1 box
20mmØ PVC pipe 90 pcs
32mmØ PVC pipe 5 pcs
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 118
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 08/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
32mmØ PVC male adapter w/ locknut 2 pcs
convenience 2-outlet, universal prong 12 set
ACU outlet universal prong 2 set
cable outlet w/ plate & cover 2 set
telephone outlet w/ plate & cover 1 set
panel board w 60AT CB, 230V, 60hz plug-in type w/
branches 15AT CB - 1set, 20AT CB - 2set, 30AT CB - 1 set
2set
junction box PVC w/ cover 15 pcs
utility box PVC 6 pcs
GI tie wire #16 6 kilo
electrical tape big 4 pcs
secondary rack 2-spool 1 set
kilowatt hour meter 1 set
PVC solvent 400cc 1 can
Sub-Total
XI. Tile Works
16"x16" floor tiles 300 pcs
8"x8" floor tiles 200 pcs
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 119
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 09/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
8"x8" wall tiles 500 pcs
p cement 10 bags
tile adhesive (25 kg) 10 bags
ABC grout 40 kls
Sub-Total
XII. Septic Tank (1.4m x 2.4m x2.0m)
p cement 15 bags
sand 1.5 cu.m
gravel 2 cu.m
CHB 4" 200 pcs
10mmØ RSB 18 pcs
4"Ø PVC pipe 1 pc
4"Ø PVC tee 3 pcs
4"Ø PVC clean out 3 pcs
#16 GI tie wire 3 kls
form lumber, coco 240 bdft
ord plywood 1/4" THK 1.5 pcs
CW nails (asstd) 3 kls
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 120
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 10/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
sahara cement 6 kls
Sub-Total
XIII. Amenities
refrigerator 1 unit
gas range 1 unit
tv set 40" (flat screen LED) w/ rack 1 set
sala set 1 set
dining sets (table & chairs) 1 set
king size bed 3 units
cabinet / closet 3 units
Sub-Total
Total
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 121
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 11/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Sub-Total
II. Concrete Works
III. Masonry Works
IV. Forms & Scaffoldings
V. Carpentry Works
VI. Doors and Windows
VII. Roofing Works
VIII. Painting Works
IX. Plumbing Works
X. Electrical Works
XI. Tile Works
XII. Septic Tank (1.4m x 2.4m x2.0m)
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the
Bill of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable,
hereby OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained
in the bid documents, including the posting of the required performance security within ten (10) calendar days
from receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 122
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Unit Transient Officer’s Quarters
DO NOT RETYPE or ALTER (Page 12/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Sub-Total
Total Material Cost
Labor Cost
I. Earthworks
XIII. Amenities
VAT (Labor)
Overhead/Miscellaneous
Contractor’s Profit
Total
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the
Bill of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable,
hereby OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained
in the bid documents, including the posting of the required performance security within ten (10) calendar days
from receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 123
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of (One) Unit Married Officer’s Quarters
DO NOT RETYPE or ALTER (Page 13/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
I. Earthworks
excavation 228 cum
backfill 192 cum
compaction 192 cum
Sub-Total
II. Concrete Works
cement 2,335 bags
sand 129 cum
gravel 258 cum
gravel bed 53 cum
rsb 20mmØ x 6m 282 pcs
rsb 16mmØ x 6m 984 pcs
rsb 12mmØ x 6m 229 pcs
rsb 10mmØ x 6m 3,900 pcs
gi tie wire #16 520 kls
Sub-Total
III. Forms and Scaffolds
form lumber 6,000 bdft
form plywood 1/2" 70 pcs
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 124
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of (One) Unit Married Officer’s Quarters
DO NOT RETYPE or ALTER (Page 14/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
cw nail (asstd) 150 kls
concrete nails (asstd) 45 kls
Sub-Total
IV. Masonry Works
cement 3,570 bags
sand 395 cum
chb 6" thk 26,800 pcs
chb 4" thk 13,593 pcs
rsb 10mmØ x 6m 1,920 pcs
gi tie wire #16 176 kls
water proofing 146 sqm
Sub-Total
V. Carpentry Works (Ceiling, Eaves & Cabinets)
ordinary plywood 1/4" thk 175 pcs
marine plywood 1/4" thk 42 pcs
660-2"x2"x12' ceiling joist 2,640 bdft
cw nails (asstd) 148 kls
fin nails (asstd) 40 kls
concrete nails (asstd) 64 kls
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 125
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of (One) Unit Married Officer’s Quarters
DO NOT RETYPE or ALTER (Page 15/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
wood stair 10 units
mc bolts 400 pcs
handrail and steel railings 10 units
kitchen cabinets 10 units
Sub-Total
VI. Doors and Windows
panel door w/jamb (.90mx2.10m) 10 units
marine plywood flushdoor w/ 20 units
jamb (.80m x 2.10m)
marine plywood flushdoor w/ 30 units
jamb (.85m x 2.10m)
pvc door (.60m x 2.10m) 20 units
aluminum analok sliding windows 202.2 sqm
door lockset 80 sets
door hinges 120 prs
Sub-Total
VII. Roofing Works
(Pre-painted Long Span, Rib Type Roof)
0.50mm long span rib type roof w/ access 824 sqm
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 126
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of (One) Unit Married Officer’s Quarters
DO NOT RETYPE or ALTER (Page 16/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
spanish gutter 63 pcs
flashing 40 pcs
ridge roll 47 pcs
pvc downspout 3"Ø 50 pcs
angular bar, c-purlins roof framing & access 824 sqm
Sub-Total
VIII. Tile Works
ceramic cr floor tiles 8"x8" 1,600 pcs
ceramic cr wall tiles 8"x8" 5,900 pcs
ceramic floor tiles 12"x12" 9,220 pcs
vinyl tiles 12"x12"(maid room) 520 pcs
p cement 135 bags
sand 15 cum
tile grout 90 kls
vinyl adhessive 4 gals
Sub-Total
IX. Painting Works
flat latex paint white 45 tins
latex paint white semi-gloss 45 tins
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 127
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of (One) Unit Married Officer’s Quarters
DO NOT RETYPE or ALTER (Page 17/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
flatwall enamel paint 25 tins
qd enamel paint 25 gals
concrete neutralizer 10 gals
paint thinner 20 gals
acri-color (asstd) 40 qrts
t-ting color (asstd) 35 qrts
roller paint brush w/ tray 30 sets
paint brush (asstd) 50 pcs
rugs (stufa) 20 kls
Sub-Total
X. Electrical Works
wall lamp w/ fixtures 10 sets
compact flourescent lamp 20W 170 sets
receptacle 4" 170 pcs
1-gang switch 110 sets
2-gang switch 20 sets
3-gang switch 40 sets
convenience outlet duplex 150 sets
weather proof outlet 10 sets
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 128
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of (One) Unit Married Officer’s Quarters
DO NOT RETYPE or ALTER (Page 18/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
telephone outlet 10 sets
catv outlet 10 sets
2.0 sqmm thhn wire 9 rlls
3.5 sqmm thhn wire 22 rlls
5.5 sqmm thhn wire 20 rlls
60 sqmm thhn wire 40 mtrs
125 sqmm thhn wire 80 mtrs
telephone wire jacketed #22/4C 270 mtrs
coaxial wire 270 mtrs
utility box 360 pcs
junction box 180 pcs
electrical tape 60 rlls
mica tube 60 mtrs
20mmØ x 3m pvc pipe w/ coupling 900 pcs
25mmØ x 3m pvc pipe w/ coupling 119 pcs
25mmØ rsc pipe 12 pcs
65mmØ rsc pipe 4 pcs
65mmØ rsc coupling 2 pcs
65mmØ rsc elbow 2 pcs
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 129
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of (One) Unit Married Officer’s Quarters
DO NOT RETYPE or ALTER (Page 19/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
65mmØ entrance cap 2 pcs
tie wire #16 10 kls
pvc cement 10 cans
25mmØ entrance cap 2 pcs
circuit breaker, 60AT, 2PST, 10 sets
220V, 60HZ w/ ff. branches:
3- 20AT, 2P
3- 30AT, 2P
wire gutter w/cover verify size 1 unit
tel/catv terminal box w/ cover 2 pcs
acu outlet 10 sets
meter base 10 units
ground rod 1 pc
ground rod connector 1 pc
20mmØ pvc adaptor 689 pcs
20mmØ L & B 689 pcs
bare cu wire, 60sqmm 5 mtrs
Sub-Total
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 130
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of (One) Unit Married Officer’s Quarters
DO NOT RETYPE or ALTER (Page 20/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
XI. Plumbing Works
a) Fixtures and Septic Tank
water closet w/tank, fittings & accs 20 sets
lavatory w/ faucet,complete fittings & accs 20 sets
kitchen sink stainless w/ faucet 10 units
shower assembly w/ faucet 20 sets
floor drain 4"x4" 20 pcs
hose bibb 1/2"Ø 10 pc
septic tank 10 units
b) Rough - Ins (DWV)
4"pvc pipe series 600 80 pcs
4" pvc p-trap 40 pcs
4" pvc elbow 40 pcs
4" pvc wye 60 pcs
4" clean out w/ plug 20 pcs
4" pvc tee 40 pcs
2"pvc pipe series 600 30 pcs
2"x4"Ø pvc wye red 60 pcs
2" pvc p-trap 120 pcs
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 131
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of (One) Unit Married Officer’s Quarters
DO NOT RETYPE or ALTER (Page 21/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
2" pvc elbow 60 pcs
2" pvc tee 60 pcs
2" pvc cross tee connection 60 pcs
pvc solvent cement 5 qrt
6"pvc pipe series 600 10 pc
2"pvc pipe series 600 40 pcs
c) Cold Water Line
3/4"Ø ppr pipe 500 mtrs
3/4"Ø fittings 1 lot
1/2"Ø ppr pipe 500 mtrs
1/2"Ø fittings 1 lot
pvc solvent cement 5 qrt
3/4" gate valve 10 pc
3/4" check valve 10 pc
Sub-Total
Total
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 132
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of (One) Unit Married Officer’s Quarters
DO NOT RETYPE or ALTER (Page 22/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Sub-Total
II. Concrete Works
III. Forms and Scaffolds
IV. Masonry Works
V. Carpentry Works
VI. Doors and Windows
VII. Roofing Works
VIII. Tile Works
IX. Painting Works
X. Electrical Works
XI. Plumbing Works
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the
Bill of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable,
hereby OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained
in the bid documents, including the posting of the required performance security within ten (10) calendar days
from receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 133
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of (One) Unit Married Officer’s Quarters
DO NOT RETYPE or ALTER (Page 23/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Sub-Total
Total Material Cost
Labor Cost
I. Earthworks
VAT (Labor)
Overhead/Miscellaneous
Contractor’s Profit
Total
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the
Bill of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable,
hereby OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained
in the bid documents, including the posting of the required performance security within ten (10) calendar days
from receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 134
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 24/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
I. Earthworks
excavation 163 m³
backfill 127 m³
compaction 127 m³
site clearing/cleaning 897 sqm
Sub-Total
II. Filling Materials
Volume = 103.00 cum
earthfill 80 m³
gravel fill 23 m³
Sub-Total
III. Concrete Works
Volume = 226.00 cum
p cement 2,258 bags
sand 114 m³
gravel 226 m³
20mmØ x 6.0m rebars(grade 40) 259 pcs
16mmØ x 6.0m rebars(grade 33) 1,106 pcs
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 135
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 25/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
10mmØ x 6.0m rebars(grade 33) 4,475 pcs
#16 gi tie wire 580 kgs
Sub-Total
IV. Masonry Works
RC wall = 25.49 cum
Area(6"CHB) = 342.00 sqm
Area(4"CHB) = 367.00 sqm
6" chb(non-load) 4,268 pcs
4" chb(non-load) 4,584 pcs
p cement 912 bags
sand 73 m³
gravel 26 m³
10mmØ x 6.0m rebars 492 pcs
#16 gi tie wire 49 kgs
plastering(A=1,920 sqm)
p cement 636 bags
sand 72 m³
screen(bistay) 6 lnm
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 136
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 26/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
Sub-Total
V. Form & Scaffolds
Area = 704.00 sqm
form lumber coco 3,000 bd f
scaffolds coco 4,200 bd f
1/2" plywood 160 pcs
cw nails 120 kgs
Sub-Total
VI. Soil & wood Treatment
soil poison( A=235 sqm) 5 gals
wood treatment 6 gals
Sub-Total
VII. Metal Works
Area = 396.00 sqm
angle bar trusses,steel purlin
and access 396 sqm
ficem board facia 1/2x12x8' 36 pcs
stair balluster & railings 36 sqm
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 137
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 27/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
Sub-Total
VIII. Roofing Works
Area = 396.00 sqm
0.5mm prepainted gi shts 396 lnm
0.5mm prepainted gi gutter 36 pcs
0.5mm prepainted ridge roll 31 pcs
0.5mm prepainted gi valley gutter 10 pcs
5mm double sidded insulation 8 rls
tekscrew 3,168 pcs
blind rivets 1,200 pcs
3"Ø pvc down spout 50 pcs
3"Ø pvc elbow 28 pcs
pvc solvent 400cc 2 can
3"Ø stainless strainer 14 pcs
gi clamp & screw 112 pcs
sealant 20 tubes
touch up paint 1 ltr
Sub-Total
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 138
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 28/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
IX. Ceiling Works
Area = 749.00 sqm
metal furring, wall angle, carrying channel w/ access 749 sq.m
ficem board 1/4" thk 260 pcs
air vent(10"x8') 4 pcs
aluminum screen(1.20m) 1 ln.m
blind rivets 3,640 pcs
Sub-Total
X. Doors & Windows
a. doors & windows w/ installation
D1 2.10x2.45m alumn glass door with fixed transom &
1 set
jamb
W1 1.40x2.35m alumn powder coated fixed glass 1 set
W2 2.40x1.20m alumn powder coated sliding w/ fixed
12 set
glass & screen
W3 3.60x1.20m alumn powder coated sliding w/ screen 3 set
W4 1.20x1.20m alumn powder coated sliding w/ screen 13 set
W5 2.40x0.60m alumn powder coated awning w/ screen 6 sets
W6 1.20x0.60m alumn powder coated awning w/ screen 11 set
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 139
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 29/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
W7 0.60x0.60m alumn powder coated awning w/ screen 8 set
0.60x1.60 alumn swing door w/ closer 18 sets
b. doors
D2 1.00 x 2.10 panel door w/2x6 wood jamb 3 sets
D3 0.90x2.10 ordinary flush door w/2x5 jamb 12 set
D4 1.00x2.10 steel door w/ jamb, hinges & lockset 6 sets
D5 0.70x2.10 marine flush door w/ 2x5 jamb 6 set
door lockset w/ key 15 sets
3x3 lp hinges 32 pairs
door lockset w/o key 6 sets
Sub-Total
XI. Plumbing Works
water closet w/ tank, Angle valve 15 sets
wall hang lavatory, angle valve, p-trap 12 sets
urinal w/ flush 12 sets
shower assbly w/ faucet 15 sets
lavatory faucet 12 pcs
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 140
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 30/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
4 x 4 floor drain 45 pcs
urinal partition 15 sets
mirror w/ glass shelve 6 sets
towel bar 6 pcs
shower curtain w/ bar 6 sets
water line ppr pipe w/ fittings 125 sqm
plumbing line pvc pipe w/ fittings 125 sqm
Sub-Total
XII. Electrical Works
circular led lamp 15W surfaced mounted w/ prismatic
6 sets
plastic cover
led bulb 10W w/ plastic receptacle 4"Ø 65 sets
t8 led fluorescent 1x18W surface type 18 sets
ceiling fan 18"Ø orbital type w/ selector switch 20 sets
ceiling fan 1.20mØ industrial type w/ selector switch 3 sets
emergency light 2-led blub 6 sets
exhaust fan 30cm x 30cm ceiling/wall type w/ pipe 6 sets
single gang switch w/ plate & cover 16 sets
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 141
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 31/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
two gang switch w/ plate & cover 6 sets
three gang switch w/ plate & cover 10 sets
three way switch w/ plate & cover 16 sets
convenience outlet 2-gang, 3-universal prong 57 sets
convenience outlet 2-gang, 3-universal prong, weather
8 sets
proof
acu outlet, universal 3-prong 6 sets
cable tv outlet w/ plate & cover 3 set
telephone outlet w/ plate & cover 30 sets
junction box pvc w/ cover 128 pcs
utility box pvc 124 pcs
square box pvc 4"x4" 3 pcs
telephone terminal box w/ connectors 1 set
2.0mm² thhn copper wire 6 box
3.5mm² thhn copper wire 21 box
8.0mm² thhn copper wire 2 box
38mm² thhn copper wire 10 mts
coaxial cable tv wire RG6 w/ connectors 45 mts
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 142
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 32/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
telephone jacketed wire cat5e w/ connectors 600 mts
gi tie wire #16, 1kilo 25 kilo
electrical tape big 15 pcs
rubber tape big 1 pc
panel board PB1 & PB2 60AT/100AF main cb, 230v,
60hz, bolt-on type, w/ branches; 15AT cb - 1 set, bolt-on
2 set
miniture type cb, 20AT cb - 5 set, bolt-on miniture type
cb, 30AT cb - 2 set, bolt-on miniture type cb
panel board PB3 60AT/100AF main cb, 230v, 60hz, bolt-
on type, w/ branches; 15AT cb - 2 set, bolt-on miniture
1 set
type cb, 20AT cb - 6 set, bolt-on miniture type cb, 30AT
cb - 2 set, bolt-on miniture type cb
nema 4x enclocure mccb 150AT/225AF, cb, 230v,
1 set
60hz ,single phase
20mmØ pvc pipe 605 pcs
20mmØ pvc long elbow 300 pcs
32mmØ pvc pipe 20 pcs
32mmØ pvc long elbow 6 pcs
32mmØ rsc locknut 6 pcs
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 143
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 33/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
32mmØ service entrance cap for telephone 1 set
32mmØ metal clamp w/ 2-holes for bolt screw 8 pcs
40mmØ pvc pipe 2 pcs
40mmØ pvc long elbow 2 pcs
40mmØ rsc pipe, 3m 1 pc
40mmØ rsc locknut 4 pcs
40mmØ service entrance cap for power 1 set
40mmØ metal clamp w/ 2-holes for bolt screw 8 pcs
pvc solvent 400cc 15 cans
concrete pedestal (6m x 25cm x 25cm) complete
1 set
installation
kilo-watt hour meter, single phase digital type, 230v, 60hz 1 set
ground rod w/ clamp, telephone, and power 2 sets
Sub-Total
XIII. Tile Works
Entrance Area = 42.00 sqm
40 x 40 nonskid flr tiles 130 pcs
stone cladding 22 sqm
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 144
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 34/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
foyer/sun room Area = 58.00 sqm
60 x 60 ceramic flr tiles 164 pcs
quarters Area = 402.00 sqm
60 x 60 floor tiles 1,120 pcs
stair & landing Area = 84.00 sqm
30 x 30 ceramic tiles 935 pcs
toilet & bath Area = 125.00 sqm
30 x 30 ceramic flr tiles 1,390 pcs
30 x 30 ceramic wall tiles 2,040 pcs
roof deck Area = 207.00 sqm
60 x 60 ceramic tiles 574 pcs
water proofing(deck & toilet) Area = 306.00 sqm
membrain water proof 306 sqm
floor topping/grout/adhessive Area = 918.00 sqm
p cement 590 bags
sand 67 m³
tile grout 90 kls
tile adhessive 280 bags
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 145
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 35/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
screen(bistay) 10 lnm
Sub-Total
XIV. Painting Works
Area(masonry) = 2,840.00 sqm
Area(wood/metal) = 120.00 sqm
nuetralizer 15 gals
latex flat 81 tins
latex semi gloos 48 tins
acri color 24 pints
enamel flat 6 tins
qd enamel 18 gals
duco paint 27 gals
tin tin color 6 pints
lacquer thinner 3 gals
paint thinner 7 gals
pollytuff 10 gals
lacquer primer 12 gals
wood putty 6 gals
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 146
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 36/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
sand paper 12 lnm
skim coat 285 bags
rug 18 kls
paint brush 20 pcs
roller w/ tray 8 sets
Sub-Total
XV. Septic Tank(2-units-2.15x3.70x1.80m) Volume =
28.64 cum
6" chb 720 pcs
p cement 84 bags
sahara cement 14 bags
sand 10 m³
gravel 4 m³
10mmØ x 6.0m rebars 88 pcs
#16 gi tie wire 8 kgs
4"Ø pvc pipe 8 pcs
4"Ø pvc tee 8 pcs
4"Ø pvc clean out 8 pcs
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 147
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 37/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
pvc solvent 2 ltr
Sub-Total
XVI. Drainage System Length = 63.00 lnm
p cement 12 bags
sand 2 m³
gravel 1 m³
4" CHB 180 pcs
10mmØ x 6.0m rebars 16 pcs
#16 gi tie wire 1 kgs
4"Ø PVC pipe 6 pcs
6"Ø PVC pipe 4 pcs
8"Ø concrete pipe 28 pcs
Sub-Total
XVII. Perimeter Landscaping & Pathwalk(L= 65.00m,
W= 1.20m)
4" chb(non-load) 323 pcs
p cement 77 bags
sand 5 m³
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 148
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 38/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
gravel 8 m³
10mmØ x 6.0m rebars 80 pcs
#16 gi tie wire 8 kgs
landscaping 65 sqm
Sub-Total
XVIII. Amenities
telephone corded handset 9 sets
1/2HP acu window type, inverter type, remote operated 6 units
washing machine(authomatic-9klg) 2 units
single bed (metal) 6 pcs
double deck bed(metal) 36 pcs
matresses 4" thk (single) 78 pcs
bedroom closet(0.60mx2.40mx0.60m) 78 units
leather sala set(2-seat,1-center table 1-side table) 5 sets
office table w/ seat 1 set
temporary facilities(storage,brks,office) 1 lot
Sub-Total
XIX. Water System
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 149
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 39/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Qty Unit P/Unit Amount
stainless water tank 2,000.00 ltrs cap 3 units
1 HP water pump 2 units
pipe & fittings 1 lot
Sub-Total
XX. Concrete Parking Space
concrete pavement 48.00 x 6.00 x 0.20m w/ masonry
curb = 70.00 lnm Volume = 58 cum
sub-base course 62 cum
base course 62 cum
p cement 600 bags
sand 35 cum
gravel 58 cum
6" chb(non-load) 449 pcs
16mmØ x 6.0m rebars(grade 33)-dowels 14 pcs
10mmØ x 6.0m rebars(grade 33) 30 pcs
#16 gi tie wire 4 kgs
Sub-Total
Total
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the Bill
of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable, hereby
OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained in
the bid documents, including the posting of the required performance security within ten (10) calendar days from
receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 150
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 40/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Sub-Total
II. Filling Materials
III. Concrete Works
IV. Masonry Works
V. Form & Scaffolds
VI. Soil & wood Treatment
VII. Metal Works
VIII. Roofing Works
IX. Ceiling Works
XI. Plumbing Works
XII. Electrical Works
XIII. Tile Works
XIV. Painting Works
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the
Bill of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable,
hereby OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained
in the bid documents, including the posting of the required performance security within ten (10) calendar days
from receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 151
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
PLEASE USE THIS BID FORM Construction of One (1) Three Storey EP Quarters
DO NOT RETYPE or ALTER (Page 41/41)
BILL OF QUANTITIES
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at Kampo
Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF ITEM IS
BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM WILL RESULT IN A
RATING OF “FAILED”
Description Sub-Total
XV. Septic Tank(2-units-2.15x3.70x1.80m)
XVI. Drainage System
XVII. Perimeter Landscaping & Pathwalk (L= 65.00m, W= 1.20m)
XIX. Water System
XX. Concrete Parking Space
Total Material Cost
Labor Cost
I. Earthworks
X. Doors & Windows
XVIII. Amenities
Mobil/Demobil
VAT (Labor)
Overhead/Miscellaneous
Contractor’s Profit
Total
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until the goods
have been delivered and installed at the project site and accepted by PA.
The amount in the signed submitted Financial Bid Form (Annex XI) must be equal to the sum indicated in the
Bill of Quantities per Section VIII must not exceed the total ABC
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as applicable,
hereby OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions contained
in the bid documents, including the posting of the required performance security within ten (10) calendar days
from receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
____________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 152
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 153
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
The bidder may make a reservation under oath in a notarized document not to
B disclose the name of its client on the ground of an existing confidentiality
agreement but must disclose the amount, status, and name of the project for
purposes of validating the NFCC, subject to the full disclosure during post-
qualification. In this connection, the bidder may keep the name of the client from
the statement of ongoing contracts.
Statement of Single Largest Completed Contract similar to the contract to be bid
equivalent to at least Fifty (50%) of the total ABC of the project (Annex I-C).
Note: In case of Joint Venture Agreement (JVA), both partners must possess a valid
PCAB license, in addition to the Special PCAB license issued in favor of the JV
E Original copy of Bid Security. If in the form of a Surety Bond, submit also a
certification issued by the Insurance Commission;
or
Original copy of Notarized Bid Securing Declaration (Annex III) in an amount not
less than the required percentage of the ABC in accordance with the following
Page 154
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
schedule:
NFCC = [(Current assets minus current liabilities) (15)] minus the value of all
outstanding or uncompleted portions of the projects under ongoing contracts,
including awarded contracts yet to be started, coinciding with the contract to be
bid.
Notes:
Page 155
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
1. The phrase “the values of the bidder’s current assets and current liabilities”
shall be based on the data submitted to the BIR, which refers to the values of
the current assets and current liabilities reflected in the Annual Income Tax
Return and Audited Financial Statements.
2. The value of all outstanding or uncompleted contracts refers to those listed in
Annex I-A.
3. The detailed computation must be shown using the required formula provided
above.
4. The NFCC computation must at least be equal to the ABC of the project.
In case JVA is not applicable, the bidder must submit a statement stating that JVA is not
applicable in lieu of the foregoing (Annex II-B).
Proof of Authority of the designated representative/s for purposes of this bidding.
Page 156
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Note 1: In case of Joint Venture, each JV partner shall submit the same certificate.
Note 2: Over-due delivery shall mean undelivered or incomplete delivery of items
after the due date of delivery or approved request for extension of delivery period.
ENVELOPE 2: FINANCIAL COMPONENT
Original of duly signed and accomplished Financial Bid Form (Annex XI-A)
A
Original of duly signed Bid Form (Annex XI-B)
B Original of duly signed Bid Prices in the Bill of Quantities (Section VIII)
Page 157
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annexes
TABLE OF CONTENTS
Technical Documents
Annex I-A PhilGEPS Certificate of Registration (Platinum Membership)
Annex I-B Statement of All Ongoing Government and Private Contracts
Annex I-C Statement of Single Largest Completed Contract
Annex II-A Committed Line of Credit
Annex II-B Statement stating that JVA is not Applicable
Annex III Bid-Securing Declaration
Annex IV-A Organizational Chart
Annex IV-B List of Contractors Personnel
Annex IV-C Bio Data
Annex IV-D List of Constructor’s Equipment
Annex IV-E PERT/CPM
Annex IV-F Gantt Chart and S Curve
Annex IV-G Manpower Schedule
Annex IV-H Equipment Utilization Schedule
Refer to Section VI Technical Specifications
Refer to Section
Approved Plans/Drawings
VII
Annex V Scope of Works
Annex VI Affidavit of Undertaking
Annex VII Certificate of Performance Evaluation
Annex VIII Omnibus Sworn Statement
Annex IX NFCC Computation
Certificate from Armed Forces of the Philippines Procurement
Annex X Service (AFPPS) that the Bidder is not Blacklisted and has No
Overdue Delivery.
Financial Component
Annex XI-A Financial Bid Form
Annex XI-B Bid Form
Section VIII Bill of Quantities
Page 158
Construction of Operational Support Facilities Phase II for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City
(1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex I-A
(Sample)
Page 159
Construction of Operational Support Facilities for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 160
Construction of Operational Support Facilities for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex I-A
(Sample)
Page 161
Construction of Operational Support Facilities for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex I-B
(BIDDER’S COMPANY LETTERHEAD)
CERTIFIED CORRECT:
_____________________________________________
Name of Company (in print)
_____________________________________________
Signature of Company Authorized Representative
_____________________________________________
Designation (in print)
_____________________________________________
Date
Page 162
Construction of Operational Support Facilities for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex I-C
(BIDDER’S COMPANY LETTERHEAD)
Contractor’s Role
Date of
Contract (whether sole Date
Total Completio
Name of Duration Owner’s contractor, Contract
Contract n or
the and Name and subcontractor, or or Notice
at Value Estimated
Contract Nature of Address partner in a JV) and to
Award Completio
Work percentage of Proceed
n time
participation
For purposes of this project, similar contracts shall refer to contracts involving Construction
or Repair of Building.
Copy of any of the following documents must be attached to this Statement:
CERTIFIED CORRECT:
_____________________________________________
Name of Company (in print)
_____________________________________________
Signature of Company Authorized Representative
_____________________________________________
Designation (in print)
_____________________________________________
Date
Page 163
Construction of Operational Support Facilities for 103IBde, PA, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex II-A
(NAME OF BANK)
COMMITTED LINE OF CREDIT
Date: ________________
CONTRACT/PROJECT :_____________________________________
COMPANY FIRM :_____________________________________
ADDRESS :_____________________________________
BANK/FINANCING INSTITUTION :_____________________________________
ADDRESS :_____________________________________
AMOUNT :_____________________________________
This is to certify that the above Bank/Financing Institution with Business address indicated
above, commits to provide the (Supplier/Distributor/Manufacturer/Contractor), if awarded the above-
mentioned Contract, a credit line in the amount specified above which shall be exclusively used to
finance the performance of the above-mentioned contract subject to the terms, conditions and
requirements.
The credit line which must be effective or available on the date of Bid Submission and such line of credit
shall be maintained until issuance of the Certificate of Acceptance.
This Committed line of credit cannot be terminated or cancelled without the prior written
approval of the Philippine Army.
_________________________________________________
Name and Signature of Authorized Financing Institution Office
_______________________
Official Designation
Concurred by:
_________________________________________________
Name and Signature of Supplier/Distributor/Manufacturer/Contractor authorized representative
_______________________
Official Designation
Page 164
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex II-B
CERTIFIED CORRECT:
__________________________________________________
Name and Signature of Bidder/Authorized Representative
__________________________________________________
Position
__________________________________________________
Date
[JURAT]
Page 165
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex III
(REPUBLIC OF THE PHILIPPINES)
CITY (1-LOT) OF _____________________ ) S.S.
Bid-Securing Declaration
Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at
Kampo Ranao, Marawi City (1-Lot)
Bid Ref. No. ENG’G PABAC3 008-22 (3rd Rebid)
Approved Budget Contract: PhP42,786,138.88
1. I/We understand that, according to your conditions, bids must be supported by a Bid Security,
which may be in the form of a Bid-Securing Declaration.
2. I/We accept that: (a) I/we will be automatically disqualified from bidding for any contract with
any procuring entity for a period of two (2) years upon receipt of your Blacklisting Order; and,
(b) I/we will pay the applicable fine provided under Section 6 of the Guidelines on the Use of
Bid Securing Declaration, within fifteen (15) days from receipt of written demand by the
procuring entity for the commission of acts resulting to the enforcement of the bid securing
declaration under Sections 23.1(b), 34.2, 40.1 and 69.1, except 69.1 (f), of the IRR of RA
9184; without prejudice to other legal action the government may undertake.
3. I/We understand that this Bid-Securing Declaration shall cease to be valid on the following
circumstances:
a. Upon expiration of the bid validity period, or any extension thereof pursuant to your
request;
b. I am/we are declared ineligible or post-disqualified upon receipt of your notice to such
effect, and (i) I/we failed to timely file a request for reconsideration or (ii) I/we filed a
waiver to avail of said right;
c. I am/we are declared as the bidder with the Lowest Calculated Responsive Bid, and I/we
have furnished the performance security and signed the Contract.
IN WITNESS WHEREOF, I/We have hereunto set my/our hand/s this ____ day of [month] [year] at
[place of execution].
Page 166
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex IV-A
(Sample Format)
CERTIFIED CORRECT:
_____________________________________________
Name of Company (in print)
_____________________________________________
Signature of Company Authorized Representative
_____________________________________________
Designation (in print)
_____________________________________________
Date
Page 167
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex IV-B
(Sample Format)
CERTIFIED CORRECT:
_____________________________________________
Name of Company (in print)
_____________________________________________
Signature of Company Authorized Representative
_____________________________________________
Designation (in print)
_____________________________________________
Date
Page 168
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex IV-C
(BIDDER’S COMPANY LETTERHEAD)
BIO DATA
PERSONAL DATA
Name :
_____________________________________________________________
Date of Birth :
_____________________________________________________________
Nationality :
_____________________________________________________________
Marital Status :
_____________________________________________________________
Permanent :
_____________________________________________________________
Address :
_____________________________________________________________
EDUCATIONAL QUALIFICATIONS
INCLUSIVE
EDUCATION SCHOOL/INSTITUTION
DATES
Primary
Secondary
Tertiary
Post Grad.
PROFESSIONAL QUALIFICATIONS
Membership in Professional Institutions:
NAME OF INSTITUTION ADDRESS
NOTE:
For Licensed Architects/Engineers, please attach certified true copy of valid and current
copy of PRC license.
Page 169
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex IV-D
Business Name:
Business Address:
Owned/ CapaCity
Motor Proof of
Leased/ (1-Lot)/
Model/ Plate No./ Ownership/
Description Under Performa Location Condition
Year No. Body Lessor or
Purchase nce/
No. Vendor
Agreement Size
1
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Designation: ____________________
Date: _____________
Page 170
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex IV-E
(Sample Format)
PERT/CPM
Designation: ____________________
Date: _____________
Page 171
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex IV-F
(Sample Format)
Designation: ____________________
Date: _____________
Page 172
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex IV-G
(Sample Format)
Designation: ____________________
Date: _____________
Page 173
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex IV-H
(Sample Format)
Designation: ____________________
Date: _____________
Page 174
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 175
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 176
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 177
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 178
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex VI
Affidavit of Undertaking
1. I/We, ________________, of legal age, after having been duly sworn in accordance with law,
hereby depose and state that:
2. I/We am/are the bidder/s in the Project: Construction of Operational Support Facilities
Phase II for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot).
3. I/We declare that I have read each and every page of the above-stated project’s Scope of
Works for the Construction of Operational Support Facilities Phase II for 103IBde, 1ID, PA at
Kampo Ranao, Marawi City (1-Lot), including its All Plan, which we acknowledge to have received in
hard copy size A3 on _______________.
4. I/We understand that having issued this Affidavit of Undertaking, we conform to the
requirements of the above-stated Project’s Scope of Works for the Construction of Operational
Support Facilities Phase II for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot) and that, in
the event that the contract for the Project is awarded to us, we undertake to complete and accomplish
our obligations in accordance with, among other terms and conditions, the said Scope of Works.
5. I/We evaluated the Bill of Quantities (BOQ), Program of Works, Detailed Architectural and
Engineering Plans, and if there is discrepancy on plans but indicated on the BOQ or lacking quantity
but reflected on the plans, both shall be applied and construed in favor to the government.
6. This Affidavit forms part of our Technical Bid for the above-mentioned Project.
7. I/We are executing this Affidavit to attest to the truth of the foregoing facts.
IN WITNESS WHEREOF, I/We have hereunto set our hand and affix my/our signature/s on this ____
day of [month] [year] at [place of execution].
____________________________________________
Signature
__________________________
Position in the Company
__________________________
Date
SUBSCRIBED AND SWORN to before me this ___ day of ___________at
______________,Philippines, by the affiant/s himself/herself/themselves whom I was able to
personally identify through his/her/their [insert type of government identification card used], which
he/she/they has/have presented to me.
Witness my hand and seal this ___ day of [month] [year].
Page 179
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 180
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex VII
(BIDDER’S CLIENT’S COMPANY LETTERHEAD)
Issued by Bidder’s Completed Single Largest Contract Client as indicated in the submitted
Annex I-A
“Must show rating of at least Satisfactory”
This is to certify that (NAME OF BIDDER), has contracted and performed with our
company/agency the (NAME of CONTRACT/WORKS).
EXCELLENT
VERY SATISFACTORY
SATISFACTORY
POOR
Level of performance throughout the term of the contract based on the following
performance criteria.
This Certification shall from part of the Technical Documentary Requirements in line with
(Name of Bidder) participation in the Construction of Operational Support Facilities
Phase II for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot).
_____________________________ ________________________________
Name of Company (Bidder’s Client) Full Name of Authorized Representative
_____________________________ ________________________________
Address Signature of Authorized Representative
_____________________________ ________________________________
Tel. No. / Fax E-mail Address
Page 181
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex VIII
AFFIDAVIT
Page 182
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
If a sole proprietorship: The owner or sole proprietor is not related to the Head
of the Procuring Entity, members of the Bids and Awards Committee 3 (BAC3), the
Technical Working Group, and the BAC3 Secretariat, the head of the Project
Management Office or the end-user unit, and the project consultants by
consanguinity or affinity up to the third civil degree;
7. [Name of Bidder] complies with existing labor laws and standards; and
Page 183
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
IN WITNESS WHEREOF, I have hereunto set my hand this __ day of ___, 20__
at ____________, Philippines.
Page 184
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex IX
(BIDDER’S COMPANY LETTERHEAD)
CA = PHP
Less: -
CL =
Sub-Total 1 PHP
x15
Sub-Total 2 PHP
Less: -
C Value of all outstanding or uncompleted portions of the PHP
projects under on-going contracts, including awarded
=
contracts yet to be started coinciding with the contract for
this Project
NFCC PHP
Notes:
1. The value of all outstanding or uncompleted contracts refers to those listed in Annex
I.
2. The detailed computation must be shown using the required formula provided above.
3. The NFCC computation must at least be equal to the ABC of the project.
CERTIFIED CORRECT:
_____________________________________________
Name of Company (in print)
_____________________________________________
Signature of Company Authorized Representative
_____________________________________________
Designation (in print)
_____________________________________________
Date
Page 185
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex X
(Sample)
Page 186
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
INSTRUCTION TO THE BIDDER: Indicate cost per line item. DO NOT LEAVE ANY BLANK. INDICATE “0” IF
ITEM IS BEING OFFERED FOR FREE. “NO” ENTRY WILL NOT BE ACCEPTED. FAILURE TO CONFORM
WILL RESULT IN A RATING OF “FAILED”
Bidder’s
Description ABC
Proposal
Construction of One (1) Unit Transient Officer’s
1,954,215.00
Quarters
Construction of (One) Unit Married Officer’s
19,585,578.02
Quarters
Construction of One (1) Three Storey EP
21,246,345.86
Quarters
TOTAL ABC (PhP) 42,786,138.88
Total Bid Price (Amount in Words):
Notes:
The Financial Bid includes taxes, labor cost and other cost relative to the construction of the project.
The bidder shall shoulder all transportation costs, delivery charges and shall assume all risks until
the goods have been delivered and installed at the project site and accepted by PA.
The bid offer must be within the sum indicated in the Bill of Quantities per Section VIII and must not
exceed the total ABC per line item.
BIDDER’S UNDERTAKING
I/We, the undersigned bidder, have examined the Bidding Documents including Bid Bulletins, as
applicable, hereby OFFER to (supply/deliver/perform) the above-described items.
I/We undertake, if our bid is accepted, to deliver the items in accordance with the terms and conditions
contained in the bid documents, including the posting of the required performance security within ten
(10) calendar days from receipt of Notice of Award.
Until a formal contract/order confirmation is prepared and signed, this Bid is binding on us.
_____________________________________________
Name of Company (in print)
____________________________________
Signature of Company Authorized Representative
____________________________________
Designation (in print)
____________________________________
Date
Page 187
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Annex XI-B
BID FORM
Date : __________________
_________________
To: [name and address of Procuring Entity]
b. We offer to execute the Works for this Contract in accordance with the
PBDs;
c. The total price of our Bid in words and figures, excluding any discounts
offered below is: [insert information];
d. The discounts offered and the methodology for their application are:
[insert information];
e. The total bid price includes the cost of all taxes, such as, but not limited
to: [specify the applicable taxes, e.g. (i) value added tax (VAT), (ii) income tax,
(iii) local taxes, and (iv) other fiscal levies and duties], which are itemized
herein and reflected in the detailed estimates,
f. Our Bid shall be valid within the period stated in the PBDs, and it shall
remain binding upon us at any time before the expiration of that period;
21
currently based on GPPB Resolution No. 09-2020
Page 188
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
contract between us, until a formal Contract is prepared and executed; and
j. We understand that you are not bound to accept the Lowest Calculated
Bid or any other Bid that you may receive.
l. We acknowledge that failure to sign each and every page of this Bid
Form, including the Bill of Quantities, shall be a ground for the rejection of our
bid.
Name: _____________________________________________________________
Legal Capacity: ______________________________________________________
Signature: __________________________________________________________
Duly authorized to sign the Bid for and behalf of: ____________________________
Date: ________________________________________________________________
Page 189
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)
PHILIPPINE ARMY BIDS AND AWARDS COMMITTEE 3 ENG’G PABAC3 008-22 (3rd Rebid)
Page 190
Construction of Operational Support Facilities for 103IBde, 1ID, PA at Kampo Ranao, Marawi City (1-Lot)