6 EW-YH-344 A RD-02 Inspect, Survey & FDT of Embankment 7th layer C- 3:20 PM
0+240.00 0+360.00
Zone
Consultant ESAC:_____________________
Designation-Name:_________
Contractor YHB:_____________________ Date/Time:__________
Designation-Name:_________________ Page 1 of 2
Date/Time:____________________
SUMMERY OF CHECK REQUESTS
Infrastructure Development Of (Education & Medical City) SEC-Y (M/S YHB)
DHA MULTAN
Structure Work
Chainage Previous Status by ESAC
Inspection Remarks
Ser Request No Road Side Line Length (M) Decription Status of
Time by ESAC
From To request Performed by SE SVY SLT
1 SW-YH-525 C RD-03 MH-7-2 MH-7-12 Supervise The Neck Pouring of Manholes 9:40 AM
2 SW-YH-529 RD-03 MH-6-1 MH-6-12 Supervise The Neck Pouring of Manholes 10:20 AM
RD-01 Check the Reinforcement and water stopper at Bed
3 SW-YH-526 A (Drain-2A)
0+039.21 0+064.21
and walls
11:00 AM
RD-01
4 SW-YH-527 A (Drain-2A)
0+039.21 0+064.21 Check the formwork of Drain bed 11:40 AM
RD-01
5 SW-YH-528 A (Drain-2A)
0+039.21 0+064.21 Supervise the concrete poring of drain bed 2:20 PM
Consultant ESAC:_____________________
Designation-Name:_________
Contractor YHB:_____________________ Date/Time:__________
Designation-Name:___________ Page 2 of 2