Linear Chart of 30" Dia Pipe along With MB Service Road

Distance
Excavation Granular Pipe Laying Hydro Test / Half Dia Back Filling REMARKS
From To Length (m) No of Pipes Bedding Smoke Test Granular

Total = 244.2
MH-9-1 MH-9-2 54 22.2
MH-9-2 MH-9-3 34.2 14.1
MH-9-3 MH-9-4 47.6 19.6
MH-9-4 MH-9-5 52.2 21.5
MH-9-5 MH-9-6 25.4 10.5
MH-9-6 MH-9-7 10 4.1
MH-9-7 MH-9-8 26.9 11.1
MH-9-8 MH-9-9 36.3 14.9
MH-9-9 MH-9-10 46.8 19.3
MH-9-10 MH-9-11 38.4 15.8
MH-9-11 MH-9-12 28.1 11.6
MH-9-12 MH-9-13 44.1 18.1
MH-9-13 MH-9-14 46.4 19.1
MH-9-14 MH-9-15 45.9 18.9
MH-9-15 MH-9-16 21.8 9.0
MH-9-16 MH-9-17 22.6 9.3
MB-01 SR (MH-9-17)
MH-9-17 MH-OF-1 12.8 5.3
Connect to PC-02 ( MH-OF-1)
Linear Chart of 18" Dia Pipe along With Road 1

Distance
Granular Hydro Test / Half Dia
Excavation Pipe Laying Back Filling REMARKS
Bedding Smoke Test Granular
From To Length (m) No of Pipes
Total = 116.34
MH-1-1 MH-1-2 46 18.93
MH-1-2 MH-1-3 51.7 21.28
MH-1-3 MH-1-4 47.3 19.47
MH-1-4 MH-1-5 48.5 19.96
MH-1-5 MH-1-6 44.8 18.44
MH-1-6 MH-1-7 34.7 14.28
MH-1-7 MH-1-8 9.7 3.99

Total= 139.18
MH-8-01 MH-8-02 33.5 13.79
MH-8-02 MH-8-03 34.8 14.32
MH-8-03 MH-8-04 28 11.52
MH-8-04 MH-8-05 20.3 8.35
MH-8-05 MH-8-06 50.6 20.82
MH-8-06 MH-8-07 42.3 17.41
MH-8-07 MH-8-08 20.6 8.48
Road 1 (MH-8-08)
MH-8-08 MH-8-09 52 21.40
Connect to Road 2 (MH-8-09) Left Side
Road 1 (MH-8-09)
MH-8-09 MH-8-10 16.3 6.71
Connect to Street-01 Left Side
Road 1 (MH-8-10)
MH-8-10 MH-8-11 39.8 16.38
Connect to St-01 (MH-8-11) Right Side
Linear Chart of 30" Dia Pipe along With Road 2

Distance
Granular Hydro Test / Half Dia
Excavation Pipe Laying Back Filling REMARKS
From To Length (m) No of Pipes Bedding Smoke Test Granular
Left Side Total = 207.41
MH-8-11 MH-8-12 45.4 18.68
MH-8-12 MH-8-13 11.2 4.61
MH-8-13 MH-8-14 15.1 6.21
St -03 (MH-4-5)
MH-8-14 MH-8-15 29.1 11.98
Drop in Road 2 (MH-8-15)

Road 02 (MH-8-15)
MH-8-15 MH-8-16 23.7 9.75
Connect to Road-03 (MH-8-15) Left Side

MH-8-16 MH-8-17 45.8 18.85 Connect MH-8-16 to Road-03 Right Side


MH-8-17 MH-8-18 44.4 18.27
MH-8-18 MH-8-19 44.1 18.15
MH-8-19 MH-8-20 39 16.05
MH-8-20 MH-8-21 44.5 18.31
MH-8-21 MH-8-22 44.1 18.15
MH-8-22 MH-8-23 46.5 19.14
MH-8-23 MH-8-24 35.1 14.44
MH-8-24 MH-8-25 17.3 7.12
MH-8-25 MH-9-9 18.7 7.70 Connect MH-8-25 to MB SR-01

Right Side Total = 243.21 Connect MH-1-8 to Road 2 Right Side


MH-1-8 MH-1-9 38.3 15.76
MH-1-9 MH-1-10 45.8 18.85
MH-1-10 MH-1-11 54.3 22.35
MH-1-11 MH-1-12 50.1 20.62
MH-1-12 MH-1-13 39.7 16.34
MH-1-13 MH-1-14 51.2 21.07
MH-1-14 MH-1-15 56 23.05
MH-1-15 MH-1-16 43.6 17.94
MH-1-16 MH-1-17 45.7 18.81
MH-1-17 MH-1-18 45.4 18.68
MH-1-18 MH-1-19 45.9 18.89
MH-1-19 MH-1-20 46.7 19.22
MH-1-20 MH-9-7 28.3 11.65 Connect MH-1-20 to MB SR-01
Linear Chart of 18" Dia Pipe along With Road 3

Distance
Granular Hydro Test / Half Dia
Excavation Pipe Laying Back Filling REMARKS
Bedding Smoke Test Granular
From To Length (m) No of Pipes
Left Side Total =107
MH-6-01 MH-6-02 42 17.28
MH-6-02 MH-6-03 34.9 14.36
MH-6-03 MH-6-04 36.5 15.02
MH-6-04 MH-6-05 24.2 9.96
MH-6-05 MH-6-06 13.3 5.47 Connect MH-6-05 to Street-02
MH-6-06 MH-6-07 12.6 5.19
MH-6-07 MH-6-08 17.6 7.24
MH-6-08 MH-6-09 18.9 7.78
MH-6-09 MH-6-10 18.2 7.49
MH-6-10 MH-6-11 19.3 7.94
MH-6-11 MH-8-15 22.5 9.26 Connect MH-6-11 to Road 2 Left Side

Right Side Total= 107.08


MH-7-01 MH-7-02 42.1 17.33 Excluding MH-7-01 RCC Manholes
MH-7-02 MH-7-03 35.7 14.69
MH-7-03 MH-7-04 37.8 15.56
MH-7-04 MH-7-05 22.5 9.26
MH-7-05 MH-7-06 44.2 18.19
MH-7-06 MH-7-07 42.7 17.57
MH-7-07 MH-7-08
MH-7-07 MH-8-16 35.2 14.49 Connect MH-7-07 to Road 2 Left Side
Linear Chart of 18" Dia Pipe along With Street 1

Distance
Granular Hydro Test / Half Dia
Excavation Pipe Laying Back Filling REMARKS
Bedding Smoke Test Granular
From To Length (m) No of Pipes

Left Side Total = 36.83

MH-2-01 MH-2-02 29 11.93

MH-2-02 MH-2-03 49.6 20.41

MH-2-03 MH-8-9 10.9 4.49 Connect MH-2-03 to Road 2 Left Side

Right Side Total= 26.62

MH-3-01 MH-3-02 33.2 9.68

MH-3-02 MH-3-03 44.6 13.00

MH-3-03 MH-8-10 13.5 3.94 Connect MH-2-03 to Road 2 Left Side


Linear Chart of 18" Dia Pipe along With Street 2

Distance
Granular Hydro Test / Half Dia
Excavation Pipe Laying Back Filling REMARKS
From To Length (m) No of Pipes Bedding Smoke Test Granular

Total= 79.72

MH-5-01 MH-5-02 46 18.93 Start Point

MH-5-02 MH-5-03 47.5 19.55

MH-5-03 MH-5-04 46.8 19.26

MH-5-04 MH-5-05

MH-5-05 MH-6-5 53.4 21.98 Connect MH-6-05 to Road-02


Linear Chart of 18" Dia Pipe along With Street 3

Distance
Granular Hydro Test / Half Dia
Excavation Pipe Laying Back Filling REMARKS
Bedding Smoke Test Granular
From To Length (m) No of Pipes
Total = 39.59
MH-4-01 MH-4-02 18.9 7.78

MH-4-02 MH-4-03 17.5 7.20

MH-4-03 MH-4-04 18.9 7.78

MH-4-04 MH-4-05 17.6 7.24

MH-4-05 MH-4-06

MH-4-06 MH-8-14 23.3 9.59 Connect MH-4-05 to Road 2 Left Side