You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

SOOTBL OWERS NO. COORD- REVISIONS REVD. CHKD. APPD.


INATE
3L 4L 5L

A A

25-SA-3-205-B.02

25-SA-3-205-B.02

25-SA-3-205-B.02
3/SA-V-117

3/SA-V-116

3/SA-V-115
3/SA-V-142

125-FD-3-109-B.02

B B

40-SA-3-204-B.02
1L 2L 6L

25-SA-3-205-B.02

25-SA-3-205-B.02

25-SA-3-205-B.02
3/SA-V-114

3/SA-V-113

3/SA-V-112
3/SA-V-141

125-FD-3-109-B.02

C C
TO FLAME DETECTOR, BURNERS

40-SA-204-B.01

50-SA-3-201-B.02
7L
THERMO-

200-FD-3-103-B.02
AND INSPECTION WINDOW
KUO-159-475 M-12

PROBE

25-SA-3-205-B.02

3/SA-V-111
50-SA-3-209-B.02
50-FD-3-107-B.02

3/SA-V-140

PI PI
825
D 25-SA-3-207-B.02
40-SA-3-208-B.02
65-FD-3-108-B.02
833
D
3/SA-V-126
3/SA-V-143 25-SA-3-207-B.02 NOTES
THE "NOTES" SHALL INCLUDE THE FOLLOWINGS AT LEAST.
(1) THIS DIAGRAM IS PREPARED ACCORDING TO "PREPARATION PROCEDURES
TO FLAME DETECTOR FOR FLOW DIAGRAM " REF, NO. 001W - XLG
BURNERS AND INSPECTION (2) FOR EXPLANATION OF SYMBOLS, REFER TO "PIPING AND

3/SA-V-144
PI PI

25-SA-3-206
PI PI WINDOW

25-SA-3-206
832 835 INSTRUMENT SYMBOLS" REF, NO. 001W - XLG - 001
827 824 KUO-159-475 M-12

65-FD-3-112-B.02
25-SA-3-202-B.02

E 25-SA-3-202 25-SA-3-202 TO BURNERS BURNER DISTANCE


PIECE AND INSPECTION E

3/SA-V-118A
WINDOW 25-SA-3-202
KUO-159-475 M-12
REFERENCES
65-FD-3-105-B.02

3/SA-V-118B
1. KUO - 150 - 633 FLOW DIAGRAM OF AIR AND GAS

50-SA-3-201-B.02
65-FD-3-105-B.02 2. KUO - 155 - 248 GENERAL ASSEMBLY DWG OF AIR HEATER

50-SA-3-201-B.02
PI PI 65-FD-3-106-B.02
125-FD-3-105-B.02

823 3. KUO - 159 - 475 FLOW DIAGRAM OF UNIT HEAVY FUEL OIL SYSTEM
826
PI PI 4. KU3 - 456 - 013 INTERLOCK BLOCK DIAGRAM OF BOILER AUXILIARIES

25-SA-3-202-B.02
3/SA-CV-121A
25-SA-3-202

831 834 5. KU3 - 459 - 189 INSTRUMENT LIST OF BOILER (LOCAL)

F 6. KU4 - 781 - 235 MANUFACTURING SPECIFICATION OF LJUNGSTROM


F

25-SA-3-202
3/SA-CV-121B
7. A - 69 - 00783 CONSTRUCTION DRAWING OF SOOTBLOWER
3/SA-V-122A 8. 001Q - XLG - 037 PLANT OVERALL FLOW DIAGRAM FOR SERVICE AND
INSTRUMENT AIR SYSTEM

450-FD-3-102-B.12
65-FD-3-105-B.02 PI 25-SA-3-202

3/SA-V-122B
822
65-FD-3-105-B.02
25-SA-3-202
FV FV 65-FD-3-113-B.02

25-SA-3-202
820 828 PI
AH AIR AH AIR
3/SA-V-123A

MOTOR (A) MOTOR (B) 830


S

S
LOGIC LOGIC

KU3-456-044 KU3-456-045

G 50-SA-3-201-B.02 DESIGN CONDITION G


50-SA-3-201-B.02

125-FD-3-104-B.02
SERVICE AIR LINE : 910 kPa(g), 50
50-SA-3-201-B.02
SEALING AIR LINE : 8.73 kPa(g), 41

3/SA-V-124B
3/SA-V-124A

AIR MOTOR
AIR MOTOR
500-FD-3-101-B.02 3/SA-V-125B
25-SA-3-203-B.02

PI PI PI
PSL PAL AIR PREHEATER AIR PREHEATER
H 1997 1997
821 836 829 THIS DRAWING IS THE PROPERTY OF HITACHI LTD. DELIVERY HEREOF IS MADE UPON THE
H

3/SA-V-120
UNDERSTANGDING THAT IT WILL NOT BE COPIED IN WHOLE OR IN PART. THAT IT WILL BE
PAL 3-GAH-A 3/SA-V-125A 3-GAH-B RETURNED UPON REQUEST AND THAT THE INFROMATION AND DATA THEREIN CONT
1998 AINED WILL BE KEPT CONFIDENTIAL AND NOT DISCLOSED TO ANY OUTSIDERS.

125-FD-3-111-B.02

150-FD-3-115-B.02
FROM INSTRUMENT AIR
AH SOOT
150-FD-3-115-B.02

BLOWER AH SOOT BLOWER


PSL FURNACE ITV
1998 AIR AIR
3/SA-V-119

3/FD-V-50
3/SA-V-110
65-FD-3-114-B.02
3/SA-V-102

BABCOCK-HITACHI K.K.

I S.A.H S.A.H
28 NOV 1983
KURE WORKS I
FOR SIMULATOR
3/SA-V-101

3/SA-V-103

DRAIN
INSTRUMENT AIR PIPING
FOR FIANL DRAWING STEP - 2
T

001Q-XLG-037

J B
UNIT
NO. 1~6
PROJ.
DWG.NO. HTC 020 MEC DW 70058 A
J
SERVICE AIR SYSTEM DETAIL OF SOOT BLOWER LINE DETAIL OF INSPECTION DOOR LINE MARUBENI CONSORTIUM
F.D.F. F.D.F.
PI NATIONAL ELECTRIC POWER AUTHORITY
ASPIRATING PIPE 25A
NIGERIA
LAGOS THERMAL STATION - EGBIN

K MAIN LINE
CONSULTING ENGINEERS - SHAWMONT LTD. K
DWN. T.MATSUMOTO 25 DEC '81 THIRD TITLE
50A

SCAVENGING PIPE SEALING PIPE FLOW DIAGRAM OF


K.TANAKA 25 DEC '81 ANG. PROJ.
CHKD. SEALING AND ASPIRATING
65A K.SONE 25 DEC '81 SCALE
25A ASPIRATING PIPE AIR SYSTEM
APPD Y.YONEDA 25 DEC '81
50A BSAAD
SEALING PIPE
REVD
65A BABCOCK-HITACHI K.K. KURE WORKS DWG. NO.
A

Tokyo Japan KU1-277-104


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16