Professional Documents
Culture Documents
A A
25-SA-3-205-B.02
25-SA-3-205-B.02
25-SA-3-205-B.02
3/SA-V-117
3/SA-V-116
3/SA-V-115
3/SA-V-142
125-FD-3-109-B.02
B B
40-SA-3-204-B.02
1L 2L 6L
25-SA-3-205-B.02
25-SA-3-205-B.02
25-SA-3-205-B.02
3/SA-V-114
3/SA-V-113
3/SA-V-112
3/SA-V-141
125-FD-3-109-B.02
C C
TO FLAME DETECTOR, BURNERS
40-SA-204-B.01
50-SA-3-201-B.02
7L
THERMO-
200-FD-3-103-B.02
AND INSPECTION WINDOW
KUO-159-475 M-12
PROBE
25-SA-3-205-B.02
3/SA-V-111
50-SA-3-209-B.02
50-FD-3-107-B.02
3/SA-V-140
PI PI
825
D 25-SA-3-207-B.02
40-SA-3-208-B.02
65-FD-3-108-B.02
833
D
3/SA-V-126
3/SA-V-143 25-SA-3-207-B.02 NOTES
THE "NOTES" SHALL INCLUDE THE FOLLOWINGS AT LEAST.
(1) THIS DIAGRAM IS PREPARED ACCORDING TO "PREPARATION PROCEDURES
TO FLAME DETECTOR FOR FLOW DIAGRAM " REF, NO. 001W - XLG
BURNERS AND INSPECTION (2) FOR EXPLANATION OF SYMBOLS, REFER TO "PIPING AND
3/SA-V-144
PI PI
25-SA-3-206
PI PI WINDOW
25-SA-3-206
832 835 INSTRUMENT SYMBOLS" REF, NO. 001W - XLG - 001
827 824 KUO-159-475 M-12
65-FD-3-112-B.02
25-SA-3-202-B.02
3/SA-V-118A
WINDOW 25-SA-3-202
KUO-159-475 M-12
REFERENCES
65-FD-3-105-B.02
3/SA-V-118B
1. KUO - 150 - 633 FLOW DIAGRAM OF AIR AND GAS
50-SA-3-201-B.02
65-FD-3-105-B.02 2. KUO - 155 - 248 GENERAL ASSEMBLY DWG OF AIR HEATER
50-SA-3-201-B.02
PI PI 65-FD-3-106-B.02
125-FD-3-105-B.02
823 3. KUO - 159 - 475 FLOW DIAGRAM OF UNIT HEAVY FUEL OIL SYSTEM
826
PI PI 4. KU3 - 456 - 013 INTERLOCK BLOCK DIAGRAM OF BOILER AUXILIARIES
25-SA-3-202-B.02
3/SA-CV-121A
25-SA-3-202
25-SA-3-202
3/SA-CV-121B
7. A - 69 - 00783 CONSTRUCTION DRAWING OF SOOTBLOWER
3/SA-V-122A 8. 001Q - XLG - 037 PLANT OVERALL FLOW DIAGRAM FOR SERVICE AND
INSTRUMENT AIR SYSTEM
450-FD-3-102-B.12
65-FD-3-105-B.02 PI 25-SA-3-202
3/SA-V-122B
822
65-FD-3-105-B.02
25-SA-3-202
FV FV 65-FD-3-113-B.02
25-SA-3-202
820 828 PI
AH AIR AH AIR
3/SA-V-123A
S
LOGIC LOGIC
KU3-456-044 KU3-456-045
125-FD-3-104-B.02
SERVICE AIR LINE : 910 kPa(g), 50
50-SA-3-201-B.02
SEALING AIR LINE : 8.73 kPa(g), 41
3/SA-V-124B
3/SA-V-124A
AIR MOTOR
AIR MOTOR
500-FD-3-101-B.02 3/SA-V-125B
25-SA-3-203-B.02
PI PI PI
PSL PAL AIR PREHEATER AIR PREHEATER
H 1997 1997
821 836 829 THIS DRAWING IS THE PROPERTY OF HITACHI LTD. DELIVERY HEREOF IS MADE UPON THE
H
3/SA-V-120
UNDERSTANGDING THAT IT WILL NOT BE COPIED IN WHOLE OR IN PART. THAT IT WILL BE
PAL 3-GAH-A 3/SA-V-125A 3-GAH-B RETURNED UPON REQUEST AND THAT THE INFROMATION AND DATA THEREIN CONT
1998 AINED WILL BE KEPT CONFIDENTIAL AND NOT DISCLOSED TO ANY OUTSIDERS.
125-FD-3-111-B.02
150-FD-3-115-B.02
FROM INSTRUMENT AIR
AH SOOT
150-FD-3-115-B.02
3/FD-V-50
3/SA-V-110
65-FD-3-114-B.02
3/SA-V-102
BABCOCK-HITACHI K.K.
I S.A.H S.A.H
28 NOV 1983
KURE WORKS I
FOR SIMULATOR
3/SA-V-101
3/SA-V-103
DRAIN
INSTRUMENT AIR PIPING
FOR FIANL DRAWING STEP - 2
T
001Q-XLG-037
J B
UNIT
NO. 1~6
PROJ.
DWG.NO. HTC 020 MEC DW 70058 A
J
SERVICE AIR SYSTEM DETAIL OF SOOT BLOWER LINE DETAIL OF INSPECTION DOOR LINE MARUBENI CONSORTIUM
F.D.F. F.D.F.
PI NATIONAL ELECTRIC POWER AUTHORITY
ASPIRATING PIPE 25A
NIGERIA
LAGOS THERMAL STATION - EGBIN
K MAIN LINE
CONSULTING ENGINEERS - SHAWMONT LTD. K
DWN. T.MATSUMOTO 25 DEC '81 THIRD TITLE
50A