You are on page 1of 2

JOB SAFETY ANALYSIS

Job/ Task Description: Erection and Page : 1 of JSA No. Date: New
Dismantling of Scaffolding 3 Revised

Equipment: JSA Performed by: Leebert Espiritu Work Responsible Person:

Job Location: Working Crew: EAT Reviewed and Acknowledge by:

Emergency Plan:
• Rescue Plan: KNOW THE PROPER PERSON TO BE CONTACTED IN CASE OF EMERGENCY, FIRST AIDER MUST BE PROPERLY ORIENTED TO THE
EMERGENCY, VISUAL STUDY THE PERSONS CONDITION, BRING THE PERSON TO THE NEAREST CLINIC FOR MEDICAL ATTENTIION, STAND BY EMERGENCY
VEHICLE MUST BE PRIVIDED AT ALL TIMES.
• Exact location for emergency Aid: MPPCL CLINIC,FIRST AID AVAILABLE ON SITE
• Emergency Response Team On Site: MPPCL ERT
• Emergency Contact Nos.: PAGING SYSTEM
• PPE Requirements: Hard Hat , Safety Glasses, Safety shoes

HAZARD CONTROLS ARE CONTROL


EXISTING POTENTIAL
JOB STEPS MEASURES
HAZARD HAZARD
ELIMINATION/ ENGINEERING ADMINISTRATIVE PPE IMPLEMENTED?
SUBTITUTION

•Hauling of Scaffold •Noise •Manual •Awareness •Used Hoist for •Orient workers on •Hard Hat YES
materials at work area •Coal Dust lifting that •Observe work lifting Materials proper positioning •Ear Plug
•Heat results Area •Observe the proper •Cotton
muscle strain lifting positon
Gloves
on lower back •Authorized and property
•Dust •Dust Mask
rigger with
Inhalation NC-II
•Contact with
sharp edges
•Installing and • Noise •Dust •Awareness •Usage of •Orient workers on •Hard Hat YES
Dismantling of Scaffold •Coal Dust Inhalation •Observe work proper tools proper positioning •Ear Plug
•Heat •Contact with Area and equipment •Observe the proper •Cotton
sharp edges •Barricade/ use •Ensure that position
•Dust Mask
•Fall of caution tape in task to be •Authorized and qualify
•Body
Materials working area performed by rigger with NC-II Harness
during lifting qualified
•Fall from personnel only
heights
•Hand
pinch/caught
in between

•Working at heights •Fall •Fall of •Ensure the •All scaffolding materials •Personnel YES
Materials area is should inspected and must wear full
•Fall of barricaded to approved body
personnel prevent any •Inspection of all
harnesses
•Collapse of unauthorized scaffolding structure
while working
scaffolding personnel entry should be inspect by a
at heights
•Improper qualified scaffolding
access and inspector 100% tie off
egress. shall be
maintained
while working
at heights
•Housekeeping at work • Noise •Manual •Awareness •Usage of •Orient workers on •Ear Plug YES
area •Coal Dust lifting that •Observe work proper tools proper positioning •Cotton
•Proper segregation of •Heat results area and equipment •Observe the proper Gloves
garbage muscle strain lifting position •Dust Mask
on lower back •Secure disposal permits
•Dust •Googles
from environmental
inhalation management
•Contact with
sharp edges
•COVID - 19 •Virus •Cover your •Stay in your •Keep 2-3 meters •Wear face YES
nose and mouth assigned work distance between shield and
when sneezing station; use yourself and others facemask at
and coughing digital tools •Wash hands thoroughly all times
whenever and frequently
possible •Clean as you go – this
includes wiping down
surfaces after meals, and
disinfect your hands
before and after handling
high – touch surfaces

You might also like