TOILET AND BATH FLOW CHAR T

START HERE
1 2 3

Specify Materials Remove Bathroom Install Bathtub faucet,


and Finishes Tile Bathtub GFCI Outlet, and
Molding

6 5 4

Install shower Install bathtub and Install pipes G.I/


enclosures and replace switch plates P.V.C./ C.I. lines and
bathroom fan traps

7 8 9

Testing of water lines


Install granite
and external and Install tile floor, and
internal drainage countertops, and
wall tile
lines by smoke test mortar bed
etc.

12 11 10

Final Checking of Painting walls, and paint Install recessed lighting,


plumbing, sanitary, and molding bathroom cabinet.
C.P. fitting.

FINISH
ACTIVITY -ON-ARROW NETWORK DIAGRAM

4 4 7 7 20 22 24 28

2 3 8 9

0 0

1 4 7 12
7 10 18 18

35 35

5 6 10 11

12 12 13 16 29 31 33 34
Gwr

PRECEDENCE DIAGRAM
ES EF
0 A 4 4 B 7 3 C 7

0 4 4 4 3 7 7 3 10

LS LF

3 F 16 0 E 12 3 D 10

18 0 18 13 3 16 12 0 12

0 G 20 12 H 20 2 I 29

20 2 22 24 4 28 29 2 31

0 L 33 1 K 35 2 J 33

35 0 35 35 0 35 33 1 34

\ GGWG