Professional Documents
Culture Documents
Injection Solutions For Underground Construction
Injection Solutions For Underground Construction
Water Stopping
Foaming, water-sensitive polyurethanes are
ideally suited to combat water ingress quickly
and effectively. For particularly difficult cases
the solution is a combination of drainage and
the injection of a fast-reacting foaming resin.
Injection
4 from Master Builders Solutions
Microcement
Excavation face
Injection drillhole
Tunnel invert Injection
lance
Fine fissure
0.02 mm
Colloidal Silica, MasterRoc MasterRoc MasterRoc Ordinary Portland Cement
MasterRoc MP 320 MP 900 MP 800 MP 650 CEM I 52.5
0.015 µm 9 µm 12 µm 15 µm 40 µm
Illustration of the difference in D95 values of MasterRoc MP microcements compared to ordinary Portland Cement
Polyurethane and
Polyurea Silicates
Ground consolidation with MasterRoc MP 368 Cavity filling with MasterRoc MP 367 Foam
MasterRoc MP 350
For permanent structural crack sealing of
concrete and masonry structures
Reaction time: 30 to 100 seconds
Foam factor: up to 8
1-component pump
Injection
8 from Master Builders Solutions
Acrylic Resins
Goal of injection:
to section and create barriers,
subsequently removing water.
MasterRoc MP 307 CE
Rubber-like and very flexible with good adhesion
to wet rock and concrete, balances ground
movement, for “living cracks”
Reaction time: 4 to 17 minutes
Viscosity: 7 mPa·s
1- or 2-component pump
Injection
10 from Master Builders Solutions
Colloidal Silica
Let the numbers do the talking: We have portrayed some of our most eco-efficient product
solutions for concrete and precast production, construction, civil engineering, and flooring.
sustainability.master-builders-solutions.com
Master Builders Solutions Master Builders Solutions Master Builders Solutions MB Solutions Singapore Master Builders Solutions
Deutschland GmbH Admixture Systems US, LLC Brasil Indústria e Comércio Pte. Ltd. Construction Chemicals LLC
Salzachstr. 17 23700 Chagrin Blvd de Químicos para 1 Harbourfront Avenue #07-07/08 Head Office: Dubai Investments
68199 Mannheim, Germany Beachwood, OH 44122, USA Construção Ltda. Keppel Bay Tower Park,
ugc@mbcc-group.com P +1-216-839-7500 Rua Costa Barros, 3089, Sitio Singapore, 098632 PO Box 37127
admixtures@mbcc-group.com Pinheirinho, P +65 6232 4888 Dubai
Vila Prudente United Arab Emirates
03210-001, Sao Paulo, Brazil P +971 4 8090800
P +55 (11) 3164-4277 ugc@mbcc-group.com
sac.eb@mail.mbcc-group.com
The data contained in this publication are based on our current knowledge and experience. They do not constitute the agreed contractual quality of the product and, in view of the many factors
that may affect processing and application of our products, do not relieve processors from carrying out their own investigations and tests. The agreed contractual quality of the product at the time
of transfer of risk is based solely on the data in the specification data sheet. Any descriptions, drawings, photographs, data, proportions, weights, etc. given in this publication may change without
prior information. It is the responsibility of the recipient of our product to ensure that any proprietary rights and existing laws and legislation are observed (01/2021).