You are on page 1of 9

Security Level:

4G | MRO Implementation ESD


W25
JABO

This study source was downloaded by 100000854365614 from CourseHero.com on 10-09-2022 07:05:10 GMT -05:00
Summary Result | 4G MRO Implementation ESD W25
Back Ground: KPI Remark
After MRO implementation, need setting properly Intra e-NB HO Success Ratio (%) Maintain
threshold with value for dense urban / urban area to Intra e-NB HO Denom Slightly Increase ~ 0.72%
avoid bad user experience with increasing Too many E-RAB Drop Ratio (%) Maintain
PingPongHO an Tooearly number. E-RAB Drop Denom Maintain
L.HHO.Ncell.PingPongHo Decrease ~ 49.06%
Impact Network:
Reducing number of PingPongHO, Tooearly while L.HHO.NCell.HoTooearly Decrease ~ 36.61%
Toolate will be increase. L.HHO.NCell.HoToWrgCell Decrease ~ 28.94%
L.HHO.NCell.HoToolate Increase ~ 0.34%
Parameter: SE DL Maintain
MOD DL Resource Block Utilization (%) Maintain
MRO:OPTPERIOD=720,NCELLOPTTHD=99,STATNUMT
HD=1000,INTERFREQMEASTOOLATEHOTHD=2,INTER 64 QAM Ratio Maintain
FREQA2ROLLBACKTHD=1,INTRARATTOOEARLYHORA QPSK Ratio Maintain
TIOTHD=70,INTRARATTOOLATEHORATIOTHD=70,INT RACH Success(%) Maintain
RARATABNORMALRATIOTHD=10,INTERFREQA2ROLL
RACH Denom & Failure Maintain
BACKPERIOD=1;{NE Name}
MOD RRC Setup Success Ratio (%) Maintain
EUTRANINTRAFREQNCELL:LOCALCELLID=XX,MCC=" E-RAB Setup Success Ratio (%) Maintain
510",MNC="89",ENODEBID=XX,CELLID=XX,CELLINDIVI User DL Average Throughput (%) Maintain
DUALOFFSET=dB0;{NE Name}
Traffic User Avg Maintain
Date Execution: Traffic (GB) Maintain
18-Jun-2019 5 PM at 20 Sites (ESD) Availability (%) Maintain

Count Count of
CR ID Region of Cell Sites
CR-20190618-00188 JABO 88 20

2
This study source was downloaded by 100000854365614 from CourseHero.com on 10-09-2022 07:05:10 GMT -05:00
4G | MRO Implementation ESD W25
Back Ground: Average of MS_Intra-eNB Handover Success Ratio(%) Intra-eNB HOSR Denom vs Failure Intra-eNB HOSR Num • Intra eNB HOSR (%)
After MRO implementation, need 100.2
80000 350 maintain
setting properly threshold with value • Intra eNB HOSR
100
for dense urban / urban area to 70000 300 Denom more Increase
avoid bad user experience with 99.8 ~0.72% than Failure
60000

Failure Intra-eNB HOSR


increasing Too many PingPongHO 250 • E-RAB Drop Ratio (%)
99.6
an Tooearly number. 50000 maintain
200 • E-RAB Drop Ratio
99.4
40000
Impact Network: num maintain
150
Reducing number of PingPongHO, 99.2
30000
Tooearly while Toolate will be 100
99
increase. 20000

98.8 50
10000
Parameter:
98.6
MOD 0 0
MRO:OPTPERIOD=720,NCELLOPTTH
D=99,STATNUMTHD=1000,INTERFRE
QMEASTOOLATEHOTHD=2,INTERFR Average of MS_E-RAB Drop Ratio(%) Sum of MS_E-RAB Drop(number)
EQA2ROLLBACKTHD=1,INTRARATTO 0.25 450000
OEARLYHORATIOTHD=70,INTRARAT
TOOLATEHORATIOTHD=70,INTRARA 400000
TABNORMALRATIOTHD=10,INTERFR 0.2
350000
EQA2ROLLBACKPERIOD=1;{NE
Name} 300000
MOD 0.15
EUTRANINTRAFREQNCELL:LOCALC 250000
ELLID=XX,MCC="510",MNC="89",ENO
0.1
DEBID=XX,CELLID=XX,CELLINDIVIDU 200000
ALOFFSET=dB0;{NE Name}
150000
0.05
Date Execution: 100000
18-Jun-2019 5 PM at 20 Sites
(ESD) 0 50000

3
This study source was downloaded by 100000854365614 from CourseHero.com on 10-09-2022 07:05:10 GMT -05:00
4G | MRO Implementation ESD W25
Back Ground: Sum of L.HHO.HoToWrgCell Sum of L.HHO.PingPongHo • HoToWrgCell number
After MRO implementation, need 3000 35000 decrease ~28.94%
setting properly threshold with value • PingPongHo number
for dense urban / urban area to 30000 decrease ~49.06%
2500
avoid bad user experience with • HoTooearly number
increasing Too many PingPongHO 25000 decrease ~36.61%
2000
an Tooearly number. • HoToolate number
20000
increase ~0.34%
1500
Impact Network:
15000
Reducing number of PingPongHO,
Tooearly while Toolate will be 1000
10000
increase.
500 5000
Parameter:
MOD 0 0
MRO:OPTPERIOD=720,NCELLOPTTH
D=99,STATNUMTHD=1000,INTERFRE
QMEASTOOLATEHOTHD=2,INTERFR Sum of L.HHO.HoTooearly Sum of L.HHO.HoToolate
EQA2ROLLBACKTHD=1,INTRARATTO 14000 12000
OEARLYHORATIOTHD=70,INTRARAT
TOOLATEHORATIOTHD=70,INTRARA 12000 10000
TABNORMALRATIOTHD=10,INTERFR
EQA2ROLLBACKPERIOD=1;{NE 10000
Name} 8000
MOD 8000
EUTRANINTRAFREQNCELL:LOCALC 6000
ELLID=XX,MCC="510",MNC="89",ENO 6000
DEBID=XX,CELLID=XX,CELLINDIVIDU
4000
ALOFFSET=dB0;{NE Name} 4000

Date Execution: 2000


2000
18-Jun-2019 5 PM at 20 Sites
(ESD) 0 0

4
This study source was downloaded by 100000854365614 from CourseHero.com on 10-09-2022 07:05:10 GMT -05:00
4G | MRO Implementation ESD W25
Back Ground: Average of MS_SE DL Average of MS_DL Resource Block Utilizing Rate(%) • SE DL maintain
After MRO implementation, need 1.7 70
• DL Resource Block
setting properly threshold with value Utilization maintain
1.6 • 64QAM Ratio
for dense urban / urban area to 60
avoid bad user experience with 1.5 maintain
increasing Too many PingPongHO 50 • QPSK Ratio maintain
1.4
an Tooearly number.
1.3 40

Impact Network: 1.2 30


Reducing number of PingPongHO,
1.1
Tooearly while Toolate will be 20
increase. 1
10
0.9
Parameter:
MOD 0.8 0
MRO:OPTPERIOD=720,NCELLOPTTH
D=99,STATNUMTHD=1000,INTERFRE
QMEASTOOLATEHOTHD=2,INTERFR Average of MS_64QAM Ratio(%) Average of MS_QPSK Ratio
EQA2ROLLBACKTHD=1,INTRARATTO 50 45
OEARLYHORATIOTHD=70,INTRARAT
45 40
TOOLATEHORATIOTHD=70,INTRARA
TABNORMALRATIOTHD=10,INTERFR 40 35
EQA2ROLLBACKPERIOD=1;{NE 35
Name} 30
MOD 30
25
EUTRANINTRAFREQNCELL:LOCALC 25
ELLID=XX,MCC="510",MNC="89",ENO 20
20
DEBID=XX,CELLID=XX,CELLINDIVIDU
15
ALOFFSET=dB0;{NE Name} 15

10 10
Date Execution:
5 5
18-Jun-2019 5 PM at 20 Sites
(ESD) 0 0

5
This study source was downloaded by 100000854365614 from CourseHero.com on 10-09-2022 07:05:10 GMT -05:00
4G | MRO Implementation ESD W25
Back Ground: Average of RACH Success(%) RACH SR Denom vs Failure RACH SR Num • RACH Success (%)
After MRO implementation, need 75 2000000 1200000 maintain
setting properly threshold with value 1800000
• RACH Denom &
70
for dense urban / urban area to 1600000
1000000 Failure RACH

Failure RACH SR Num


avoid bad user experience with 65 1400000
maintain
800000 • RRC Setup SR (%)
increasing Too many PingPongHO 1200000
60
an Tooearly number. maintain
1000000 600000
55 • E-RAB Setup SR (%)
800000
Impact Network: 50 400000 maintain
600000
Reducing number of PingPongHO,
45 400000
Tooearly while Toolate will be 200000
200000
increase. 40
0 0
35 Sum of Failure RACH SR Num
Parameter:
Sum of MS_RACH SR DENOM(number)
MOD 30
MRO:OPTPERIOD=720,NCELLOPTTH
D=99,STATNUMTHD=1000,INTERFRE
QMEASTOOLATEHOTHD=2,INTERFR Average of MS_RRC Setup Success Ratio(%) Average of MS_E-RAB Setup Success Ratio(%)
EQA2ROLLBACKTHD=1,INTRARATTO 100.1 100
OEARLYHORATIOTHD=70,INTRARAT 100 99.95
TOOLATEHORATIOTHD=70,INTRARA
99.9
TABNORMALRATIOTHD=10,INTERFR 99.9
EQA2ROLLBACKPERIOD=1;{NE 99.8
99.85
Name} 99.7
MOD 99.8
99.6
EUTRANINTRAFREQNCELL:LOCALC 99.75
ELLID=XX,MCC="510",MNC="89",ENO 99.5
99.7
DEBID=XX,CELLID=XX,CELLINDIVIDU 99.4
ALOFFSET=dB0;{NE Name} 99.3
99.65

99.2 99.6
Date Execution:
99.1 99.55
18-Jun-2019 5 PM at 20 Sites
(ESD) 99 99.5

6
This study source was downloaded by 100000854365614 from CourseHero.com on 10-09-2022 07:05:10 GMT -05:00
4G | MRO Implementation ESD W25
Back Ground: Average of MS_User DL Average Throughput(MB/s) Sum of MS_PI_L.Traffic.User.Avg(SUM)(number) • DL Average
After MRO implementation, need 16 4500 Throughput (MB/s)
setting properly threshold with value maintain
4000 • Traffic User Avg
for dense urban / urban area to 14
avoid bad user experience with 12
3500 maintain
increasing Too many PingPongHO • Traffic (GB) maintain
3000
an Tooearly number. 10 • Availability maintain
2500
8
Impact Network: 2000
Reducing number of PingPongHO, 6
1500
Tooearly while Toolate will be
4
increase. 1000

2 500
Parameter:
MOD 0 0
MRO:OPTPERIOD=720,NCELLOPTTH
D=99,STATNUMTHD=1000,INTERFRE
QMEASTOOLATEHOTHD=2,INTERFR Sum of H3I_Total DL/UL Traffic(GB) Average of MS_Radio Network Availability Rate (LTE)(%)
EQA2ROLLBACKTHD=1,INTRARATTO 5800 101
OEARLYHORATIOTHD=70,INTRARAT
5700
TOOLATEHORATIOTHD=70,INTRARA 100
5600
TABNORMALRATIOTHD=10,INTERFR
EQA2ROLLBACKPERIOD=1;{NE 5500
99
Name} 5400
MOD 5300 98
EUTRANINTRAFREQNCELL:LOCALC 5200
ELLID=XX,MCC="510",MNC="89",ENO 5100 97
DEBID=XX,CELLID=XX,CELLINDIVIDU
5000
ALOFFSET=dB0;{NE Name} 96
4900
4800
Date Execution: 95
4700
18-Jun-2019 5 PM at 20 Sites
(ESD) 4600 94

7
This study source was downloaded by 100000854365614 from CourseHero.com on 10-09-2022 07:05:10 GMT -05:00
4G | MRO Implementation ESD W25
Overlapped Coverage Discovery
BEFORE AFTER

Spot 1 Spot 1

MRO Trial
MRO Trial

Spot 3 Spot 3

Spot 2 Spot 2

Back Ground:
After MRO implementation, need setting properly threshold with value for dense urban / urban area to avoid bad user experience with increasing Too many PingPongHO an Tooearly
number.

Impact Network:
From Disco overview, overlapped coverage at spot checking improve after adjust threshold MRO setting.
8
This study source was downloaded by 100000854365614 from CourseHero.com on 10-09-2022 07:05:10 GMT -05:00
Thank You.
Copyright©2018 Huawei Technologies Co., Ltd. All Rights Reserved.

This study source was downloaded by 100000854365614 from CourseHero.com on 10-09-2022 07:05:10 GMT -05:00
Powered by TCPDF (www.tcpdf.org)

You might also like