P.W.DIVISION,
* NAME OF WORK *
PATCH WORK OF BT ROAD AT ....... FROM .......
TO........
ESTIMATE
Division :- P.W.DIVISION,
Sub-Division :-
Fund Head :-
Miner Head :-
Major Head :-
Service Head :-
Departmental Head :-
Estimate framed in the Office of the Executive Engineer, Public Works Division, ------
of the probable expenses that will be incurred in
NAME OF WORK:-
PATCH WORK OF BT ROAD AT ....... FROM ....... TO........
Call or Authority
NAME OF WORK:- PATCH WORK OF BT ROAD AT ....... FROM ....... TO........
GENERAL REPORT.
NAME OF WORK:- PATCH WORK OF BT ROAD AT ....... FROM ....... TO........
GENERAL ABSTRACT
ABSTRACT
SR.
QUANTITY DESCRIPTION OF ITEM RATE UNIT
NO.
MORTH 513
SSR OF 2022-23 ITEM NO. 4.01 & PAGE NO.35
2090.000 RATE ANALYSIS 83.38 Sq.M.
TOTAL(A) Rs.
TOTAL(B) Rs.
TOTAL(A+B) Rs.
TOTAL
AMOUNT
709785.00
174264.00
884049.00
0.00
0.00
TOTAL
AMOUNT
0.00
884049.00
Deputy Engineer
NAME OF WORK:- PATCH WORK OF BT ROAD AT ....... FROM ....... TO........
MEASUREMENT SHEET.
SR.
DESCRIPTION OF ITEM NO. L B D QUANTITY
NO.
RATE ANALYSIS.
SR. NET LEAD
DESCRIPTION OF ITEM QTY. RATE
NO. CHARGES
DIFF.COST OF MATERIAL
SR. RATE AS PER SSR MARKET
MATERIAL EXCESS LESS REMARKS/ EFFECTIVE DATE
NO. 2017-18 RATE
NAME OF WORK:- PATCH WORK OF BT ROAD AT ....... FROM ....... TO........
LEAD CHART
TYPE OF LOCATION OF LEAD IN NET LEAD
SR.NO. MATERIAL
MATERIAL QUARRY KM. CHARGES.
QUARRY CHART
KM 00/000
AT SITE
CERTIFICATE
Certified that I have visited the quarry sites & distance
shown as lead is corrects & sufficient quantity will be
available from quarry.
1 2 3 4 5 6 7 8 9 10 11
Providing and constructing 75 mm.
thick Modified Penetration
Macadam (MPM) road surface
1 including all materials, preparing the 2090.000 0.09000 188.100 0.01800 37.620 0.00230 4.807
existing road surface, spreading 40 mm.
stone metal layers 100% crusher
broken metal with concical crusher
SSR OF 2022-23 ITEM NO. 3.36(b) & PAGE NO.32
plant heating and spraying the bitumen
Providing bituminous Type A liquid
of specied grade @ 2 Kg/sqm,
seal coat on bituminous surface
spreading 12 mm.size chips compacting
including supplying all materials &
2 with three wheel static roller having
bitumen of VG-30 grade preparing 2090.000 0.00098 2.048 0.00900 18.810
weight 8 to 10 MT. to achive the desired
existing road surface, heating and
degree of compaction as per Technical
applying bitumen @ 0.98 KgSqm. by
Specification Clause 506 etc. complete.
mechanical means, spreading chips and
including
SSR applying
OF 2022-23 tack4.01
ITEM NO. coat of VG
& PAGE 10
NO.35
rolling, by static roller having weight 8
grade bitumen at the rate of 0.30 Kg
to 10 MT. etc. complete.
Sqm. on existing bitumen surface. TOTAL: 188.100 37.620 6.855 18.810
(VG-30 bulk rates are considered to
arrive at rates)
FREQUNCY CHART
ROYALTY STATEMENT
NATURAL SAND OTHER MINERALS
Sr
Item Of Work Quantity UNIT
No.
Factor Qty. Factor
1 2 3 4 5 6 7
2090.000
Total Qty. in Cubic Metre: 0.000
Rate INR. 237.370
Total Amount INR. 0.000
Grand Total Amount INR.
Notes:
1] Royalty charges for Natural Sand. Rate inclusive of surcharges of 2% + Mineral Foundation 10% [211.94 + 4.24 + 21.19 = 237.37]
2] Royalty charges for Other Minerals. Rate inclusive of surcharges of 2% = [211.94 + 4.24 = 216.18]
Qty.
0.000
216.180
0.000
0.000
9 = 237.37]
gineer
MATERIAL SUMMARY
TOTAL QUANTITY OF
SR.NO. MATERIAL REMARKS
QUANTITY ROYALTY
PLAN
प्रमाणपत्र
प्रमाणित करण्यांत येते की, वरील नकाशात दर्शविलेल्या ठिकाणी/ रस्त्यावर इतर कोणत्याही योजनेतून काम करण्यांत आलेले नाही व प्रस्तावित के लेले नाही. तसेच सदर
ठिकाणच्या / रस्त्याची नोंद ही ग्राम पंचायतीला घेण्यांत आलेली आहे व मंजुर वस्तीच्या हद्यी मध्येच काम करणे व देखभाल दुरुस्तीची हामी ग्राम पंचायत घेत आहे.