In accordance with the specification provided in the plans, the contractor shall
furnish all materials, labor, tools, equipment and other incidentals, and shall
undertake the complete Construction of MULTI - PURPOSE HALL PHASE 4 AT
AGUS 5 HEP, Brgy. Ditucalan, Iligan City.
TS-02 SCOPE
Shade is mounted inside the window frame, either to the top of the frame of to
the sides and outside the window frame. Mounting screws provided are suitable
for most mounting surfaces. Use an appropriate drill bit and appropriate anchors
before fastening the screws. Pre - drills holes before fastening the screws.
1. Mounting the tab Brackets. Fit the tab bracket onto the end of
shade with the clutch and chain. Hold the shade with the bracket,
fabric rolled up from back of the shade, to where you want to mount
it and make mark for the bracker.
1
2. Using the pencil mark as a guide, mount the bracket with 2 or more
screws.
3. Mount the pin bracket. Hold the shade in the mounted bracket and
fit the pin bracket onto the other end of the shade with round pin.
Press in about 1/8" for necessary tension. Position the pin brcket so
that the fabric hangs straight and make mark for the bracket.
4. Fitting the shade in to the brackets, First slide the end with pin
into the pin bracket. Hold the roller againts the pin bracket so the
end pin is depressed while fitting the locating hook of the sidewinder
into the tab bracket. Allow the locating hook to drop downward so
that it locks into place in the bracket.
After easy installation and settings, you can use your Phone (IOS 6.0 or Android
system for Samsung 4.3 version or above) to control.
2
APP controlled - Bluetooth controlled! No settings or network management
required. Doesn't need a base station or internet connection. app available for
iPhone, iPad, iWatch, Android and tablets.
Application: Smart and new design LED light strip, ideal for Smart home
decoration, wedding, shopping mall, LCD, advertising displays, festival decoration.
A. Basic Preparation:
B. Basic Preparation:
1. a) Paint the ceiling first
b) Next, paint the cornices
c) The paint the walls
d) Then the woodwork around doors and windows
e) The skirting comes last
2. Edges abd corners are some of the hardest areas to paint so begin
with them using a brush. Use only a third of the end of a brush in
making long and continous storkes to form straight lines.
3
3. Use a roller or a wide brush for painting the walls. A roller is quicker
to use than a wide brush and it also give the best and down strokes,
overlapping as you move from one area to another.
C. Kind of paint:
1. All paint necessary materials incorporated in/or forming a part
thereof shall be subject to the prior appoval and selection for color,
tint, finish or shade by the end-user or his authorized representative.
TS-03 WORKMANSHIP
The contractor shall perform all activities necessary for the satisfaction,
completion of the project including but not limited to following.
3.01 Mobilization
The contractor shall bring to the site all necessary tools, equipment and other
incidentals necessary for the proper execution of all activities. He shall
construct a bunkhouse for the workmen and for the storage of construction
materials.
The contractor, before moving out must restore the orderly state of
morksite by clearing all temporary structures. Remove all
excess/waste materials and store in designated areas. Backfill all
trenches and keep the surrounding in order.
3.03 Demobilization
4
L.G. NANGCAS C. V. L. ALAMAG E. H. C. MADRIO N. T. BENIGRA
Maint. Foreman, Agus 4/5 HEPC Div. Manager, PTSD Agus 4/5 HEPC Div. Manager, O/M, Agus 5 HEP Plant Manager, Agus 4/5 HEPC