You are on page 1of 8

KETERANGAN

TABEL KONFIGURASI TIANG PANCANG - MUTU BETON


* Pondasi Pilecap & Tie Beam fc' = 30MPa KONVERSI ELEVASI
NO. POSISI KONFIGURASI TIANG PANCANG NOMOR
* Tiang Pancang 450x450 fc' = 50MPa
1. PARSIAL 1 9 + 9 = 18 meter TITIK 1 - 85 * Kolom, Balok, & Plat fc' = 30MPa ELEVASI BANGUNAN ELEVASI TOPOGRAFI
±0.000 = +79.350
2. PARSIAL 2 9 + 9 = 18 meter TITIK 86 - 170 - MUTU BAJA
3. PARSIAL 3 10 meter TITIK 171 - 215 * Diameter >/= D10mm (Ulir) fy = 400 MPa
* Diameter < ∅10mm fy = 240 MPa
4. PARSIAL 4 10 meter TITIK 216 - 248
* Tulangan Utama dan Spiral (BJTD) U-40
5. PARSIAL 5 10 meter TITIK 249 - 281
- ELEVASI THEATER = SFL.-3.250
6. PARSIAL 6 10 meter TITIK 282 - 326 - KEDALAMAN PANCANG 18 m (dari ±0.000 Bangunan)
P=120kN
- TOTAL TITIK PANCANG = 328 TITIK

PARSIAL 1
No. REVISI TGL DISETUJUI
NAMA PROYEK

01 02 06 07 10 11 15 16 PEMBANGUNAN
05 14 KAMPUS
F.A'
19 UNIVERSITAS ISLAM

3500
03 04 08 09 12 13 17 18
INTERNASIONAL
F.B1'
INDONESIA (TAHAP III)
PARSIAL 5 PARSIAL 6

5000
PUPR
20
34 33
F.B'
252 253 261 262 263 269 270 279 280 288 289 298 299 307 308 314 315 325 326
46 45 35 36 32 31 22 21

5000
SIGAP MEMBANGUN NEGRI
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
43 44 38 37 29 30 23 24 DIREKTORAT JENDRAL CIPTA KARYA
F.C'
251 254 259 260 264 265 271 272 277 278 281 282 286 287 290 291 296 297 300 301 306 309 310 316 317 323 324 327 BALAI PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
42 41 39 40 28 27 26 25 Jl. PAM Baru I No.1 Pejompongan, Jakrta Pusat (10210), Telp/Faks. +62-21-57930562/57974228

7500
KONSULTAN PERENCANA

PT. WISWAKHARMAN
F.D' Jl. BUKIT SARI RAYA NO. 10

250 255 258 266 267 273 276 283 284 285 292 293 295 302 303 311 312 318 319 322 328 SUMURBOTO,
BANYUMANIK, KOTA SEMARANG

4500
JAWA TENGAH 50265

47 48 51 52 55 56 59 61 62 -KSO-
F.E' PT. INDAH KARYA
256 257 268 274 275 294 304 305 313 320 321 60 Jl. JAGAKARSA, KAV 1 RT 009 RW
49 50 53 54 57 58 63 64 05
JAKARTA SELATAN 12620

7000
DIPERIKSA DAN DISETUJUI OLEH
MANAJEMEN KONSTRUKSI
85 84 80 79 74 73 72 71 66 65
F.F' PT. AMYTHAS
Profrssional Independent

81 General Accountable

83 82 78 77 76 75 70 69 68 67
Consultant

Golden Plaza Blok E 21-22, JL RS. Fatmawati, 15, Jakarta, 12420,

6000
RT.8/RW.6, South Gandaria, Cilandak, South Jakarta City, Jakarta 12420

-KSO-

F.T CIRIA
Ciria EXPERTINDO
Expertindo Consultant CONSULTANT

6000
Jl. Raya Cilandak KKO No.5 Ragunan, Pasar Minggu Jakarta 12550

86 87 91 92 95 96 99 100 103 104


F.F
90
PARSIAL 4 PARSIAL 3 88 89 93 94 97 98 101 102 105 106

7000
( Rizalhan, ST, MT )
122 121 118 117 114 113 108 107 TEAM LEADER
112
F.E
243 242 236 229 220 201 200 192 191 184 174 111 DIPERIKSA OLEH TGL PARAF
124 123 120 119 116 115 110 109

4500
ENGINEER

182 183
F.D DIAJUKAN OLEH
249 244 241 234 235 228 221 219 212 211 209 210 202 199 198 189 190 175 173 KONTRAKTOR

PERSERO

7500
PT. WASKITA KARYA
DIVISI - I
WASKITA
125 126 131 132 137 138 143 144 GEDUNG DAN FASILITAS INDUSTRI
KANTOR DIVISI : JL. M.T. HARYONO KAV. NO. 10 CAWANG
181 180 JAKARTA 13340 INDONESIA

F.C
248 245 240 239 232 233 226 227 222 223 217 218 214 213 207 208 203 204 197 196 193 187 188 176 177 172 127 128 133 134 139 140 145 146

5000
129 130 135 136 141 142 147 148
F.B
247 246 238 237 231 230 225 224 216 215 206 205 195 194 186 185 179 178 171
149 150 ( Agus Ruliyanto, ST, MT )

5000
PROJECT MANAGER
151 F.B1 DIPERIKSA OLEH TGL PARAF

3500
170 169 163 162 159 158 154 153 ENGINEER Achmad Syauqi

F.A DIGAMBAR OLEH TGL PARAF


166 157 152
168 167 165 164 161 160 156 155 DRAFTER Andang

PARSIAL 2
SHOP DRAWING
JUDUL GAMBAR

DENAH TITIK TIANG


5000 5000 4250 4250 5000 5000 6500 7000 9550 9550 7000 6500 5000 5000 4250 4250 5000 5000 5000 10500 7500 10500
PANCANG

F.1 F.2 F.3 F.4 F.5 F.6 F.7 F.8 F.9 F.10 F.11 F.12 F.13 F.14 F.15 F.16 F.17 F.18 F.19 F.20 F.21 F.22 F.23 SKALA GEDUNG NO. GAMBAR HAL

1 : 450 STR-TP-FK-01

-
DENAH TITIK TIANG PANCANG TANGGAL
FAKULTAS B
REFERENSI REV.

1 : 450 10-09-2021 UIII-FK1-STR


R.1
(SB-1-02)
KETERANGAN
- MUTU BETON
* Pondasi Pilecap & Tie Beam fc' = 30MPa KONVERSI ELEVASI
F.18 F.19 F.20 F.21 F.22 F.23 * Tiang Pancang 450x450 fc' = 50MPa
5000 5000 10500 7500 10500 * Kolom, Balok, & Plat fc' = 30MPa ELEVASI BANGUNAN ELEVASI TOPOGRAFI

X= 705846.0825 ±0.000 = +79.350


- MUTU BAJA
X= 705846.4868 Y= 9293516.3426 * Diameter >/= D10mm (Ulir) fy = 400 MPa
Y= 9293505.8504 * Diameter < ∅10mm fy = 240 MPa
X= 705846.5445 X= 705846.1403 X= 705845.8516 X= 705845.7938 X= 705845.4473 X= 705845.3896 * Tulangan Utama dan Spiral (BJTD) U-40
Y= 9293504.3515 Y= 9293514.8437 Y= 9293522.3381 Y= 9293523.8370 Y= 9293532.8303 Y= 9293534.3292
X= 705847.1803 X= 705846.3526 - ELEVASI THEATER = SFL.-3.250
Y= 9293508.6291 Y= 9293530.1132 - KEDALAMAN PANCANG 18 m (dari ±0.000 Bangunan)
P=120kN
- TOTAL TITIK PANCANG = 328 TITIK
01 02 06 07 10 11 15 16
F.A'
05 14 X= 705845.8295 19
Y= 9293539.2748
X= 705848.1434 03 04 X= 705848.0856 X= 705847.7391 08 09 X= 705847.4504 12 13 X= 705847.0461 17 18 No. REVISI TGL DISETUJUI

3500
Y= 9293504.4131 Y= 9293505.9120 Y= 9293514.9053 Y= 9293522.3997 Y= 9293532.8919 X= 705846.9884 NAMA PROYEK
X= 705847.3926
Y= 9293523.8986 Y= 9293534.3908 PEMBANGUNAN
X= 705847.6814 KAMPUS
Y= 9293516.4042 F.B1' UNIVERSITAS ISLAM
INTERNASIONAL
INDONESIA (TAHAP III)

X= 705854.5110 X= 705854.4494 X= 705851.0706 20


PUPR

5000
Y= 9293515.1161 Y= 9293516.7150 Y= 9293539.4768
X= 705856.1938 X= 705856.0013 SIGAP MEMBANGUN NEGRI
Y= 9293495.4664 Y= 9293500.4627 KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
X= 705857.6448 DIREKTORAT JENDRAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
Y= 9293522.7425 SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
34 33 Jl. PAM Baru I No.1 Pejompongan, Jakrta Pusat (10210), Telp/Faks. +62-21-57930562/57974228
F.B'
KONSULTAN PERENCANA
325 326 X= 705858.3378 X= 705858.2762 X= 705857.9336 X= 705857.8720 X= 705857.5832 X= 705857.2406 X= 705857.1790
Y= 9293504.7558 Y= 9293506.3546 Y= 9293515.2480 Y= 9293516.8468 Y= 9293524.3413 Y= 9293533.2347 Y= 9293534.8335 PT. WISWAKHARMAN
X= 705861.1593 Jl. BUKIT SARI RAYA NO. 10
SUMURBOTO,
BANYUMANIK, KOTA SEMARANG
Y= 9293496.4583 X= 705859.5727 JAWA TENGAH 50265
-KSO-

5000
Y= 9293516.8623
X= 705861.2209 X= 705860.9976 46 45 35 36 32 31 22 21 PT. INDAH KARYA
Jl. JAGAKARSA, KAV 1 RT 009 RW
Y= 9293494.8595 Y= 9293500.6552 05
JAKARTA SELATAN 12620

DIPERIKSA DAN DISETUJUI OLEH


MANAJEMEN KONSTRUKSI
X= 705860.0346 43 44 X= 705859.9769 X= 705859.6304 38 37 X= 705859.3417 29 30 X= 705859.2839 X= 705858.9374 23 24 X= 705858.8797
Y= 9293504.8712 Y= 9293506.3701 Y= 9293515.3634 Y= 9293522.8579 Y= 9293524.3568 Y= 9293533.3501 Y= 9293534.8490 F.C' PT. AMYTHAS
323 324 327 General
Consultant
Profrssional Independent
Accountable

Golden Plaza Blok E 21-22, JL RS. Fatmawati, 15, Jakarta, 12420,


X= 705861.6335 42 41 X= 705861.5757 X= 705861.2292 39 40 X= 705860.9405 28 27 X= 705860.8827 X= 705860.5362 26 25 X= 705860.4785 RT.8/RW.6, South Gandaria, Cilandak, South Jakarta City, Jakarta 12420

Y= 9293506.4317 Y= 9293524.4184 Y= 9293534.9106 -KSO-


Y= 9293504.9328 Y= 9293515.4250 Y= 9293522.9195 Y= 9293533.4117
CIRIA
X= 705861.1715 Ciria EXPERTINDO
Expertindo Consultant CONSULTANT
Y= 9293516.9239 Jl. Raya Cilandak KKO No.5 Ragunan, Pasar Minggu Jakarta 12550
KONFIGURASI TIANG PANCANG FAKULTAS

7500
= TIANG PANCANG 9m + 9m = 170 TITIK

X= 705868.6845 X= 705868.4920
( Rizalhan, ST, MT )
Y= 9293495.9476 Y= 9293500.9439
= TIANG PANCANG 10m = 158 TITIK TEAM LEADER

DIPERIKSA OLEH TGL PARAF

F.D' ENGINEER

322 328 X= 705871.2749 DIAJUKAN OLEH


Y= 9293524.8187 KONTRAKTOR
X= 705871.8683
PERSERO
X= 705872.0256 X= 705871.9679 X= 705871.6214 X= 705871.5636 X= 705871.3326 Y= 9293530.1956 X= 705870.9284 X= 705870.8707 PT. WASKITA KARYA
Y= 9293505.3332 Y= 9293506.8321 Y= 9293515.8254 Y= 9293517.3243 Y= 9293523.3199 Y= 9293533.8121 Y= 9293535.3110

4500
DIVISI - I
WASKITA
X= 705873.1812 X= 705871.9299 GEDUNG DAN FASILITAS INDUSTRI
KANTOR DIVISI : JL. M.T. HARYONO KAV. NO. 10 CAWANG
JAKARTA 13340 INDONESIA
Y= 9293496.1209 Y= 9293528.5968
X= 705872.9315
Y= 9293523.3814
47 48 51 52 55 56 61 62
F.E'
321 59 60
( Agus Ruliyanto, ST, MT )
X= 705873.6244 49 50 X= 705873.5667 X= 705873.2202 53 54 X= 705873.1625 57 58 X= 705872.8737 63 64 X= 705872.4695 PROJECT MANAGER
Y= 9293506.8937 Y= 9293517.3859 Y= 9293524.8803 X= 705872.5272 Y= 9293535.3726
Y= 9293505.3948 Y= 9293515.8870 DIPERIKSA OLEH TGL PARAF
Y= 9293533.8737
ENGINEER Achmad Syauqi

X= 705878.2697 X= 705878.0657
DIGAMBAR OLEH TGL PARAF
Y= 9293525.0882 Y= 9293530.3843

7000
X= 705878.9628 DRAFTER Andang
X= 705879.0206 Y= 9293507.1016 X= 705878.6163 X= 705878.5586 X= 705878.3275 X= 705878.1234 X= 705877.9232 X= 705877.8655
Y= 9293505.6027 Y= 9293516.0949 Y= 9293517.5938 Y= 9293523.5893 Y= 9293528.8854 Y= 9293534.0816 Y= 9293535.5804
X= 705879.5908 SHOP DRAWING
Y= 9293511.5791 JUDUL GAMBAR

85 84 80 79 74 73 72 71 66 65 DENAH TITIK TIANG


KEYPLAN F.F'
81 PANCANG PARSIAL - 01

X= 705880.6194 83 82 X= 705880.5616 X= 705880.2151 78 77 X= 705879.9263 76 75 70 69 68 67 X= 705879.4643


Y= 9293505.6643 Y= 9293507.1632 Y= 9293516.1565 Y= 9293523.6509 Y= 9293535.6420 SKALA GEDUNG NO. GAMBAR HAL

X= 705879.7222 1 : 150 STR-TP-FK-02


Y= 9293528.9470 X= 705879.6645
X= 705880.1574 X= 705879.8685 X= 705879.5220 FAKULTAS B

-
DENAH TITIK TIANG PANCANG PARSIAL - 01 Y= 9293517.6554 Y= 9293525.1498
Y= 9293530.4459
Y= 9293534.1432
TANGGAL REFERENSI

UIII-FK1-STR
REV.

10-09-2021 R.1
1 : 150 (SB-1-02)
KETERANGAN
- MUTU BETON
F.18 F.19 F.20 F.21 F.22 F.23 * Pondasi Pilecap & Tie Beam fc' = 30MPa KONVERSI ELEVASI
5000 5000 10500 7500 10500 * Tiang Pancang 450x450 fc' = 50MPa
* Kolom, Balok, & Plat fc' = 30MPa ELEVASI BANGUNAN ELEVASI TOPOGRAFI
X= 705890.2608 X= 705890.0568 X= 705889.9143 ±0.000 = +79.350
Y= 9293525.5502 Y= 9293530.8463 Y= 9293534.5436 - MUTU BAJA
* Diameter >/= D10mm (Ulir) fy = 400 MPa
* Diameter < ∅10mm fy = 240 MPa
X= 705891.0115 X= 705890.9538 X= 705890.6073 X= 705890.5496 X= 705890.3186 X= 705890.1145 X= 705891.5131 X= 705889.8566 * Tulangan Utama dan Spiral (BJTD) U-40
Y= 9293506.0647 Y= 9293507.5636 Y= 9293516.5569 Y= 9293518.0558 Y= 9293524.0513 Y= 9293529.3474 Y= 9293534.6052 Y= 9293536.0424
- ELEVASI THEATER = SFL.-3.250
X= 705891.4554 - P=120kN
KEDALAMAN PANCANG 18 m (dari ±0.000 Bangunan)
Y= 9293536.1040 - TOTAL TITIK PANCANG = 328 TITIK
86 87 91 92 95 96 99 100 103 104
F.F
X= 705891.5819 90
Y= 9293512.0411
X= 705892.6104 88 89 X= 705892.2061 93 94 X= 705891.9174 97 98 101 102 105 106 No. REVISI TGL DISETUJUI
Y= 9293506.1263 Y= 9293516.6185 Y= 9293524.1129 X= 705891.8596 X= 705891.6537 NAMA PROYEK

X= 705892.5526 Y= 9293525.6118 Y= 9293530.9579 X= 705896.9095 PEMBANGUNAN


Y= 9293507.6252 X= 705897.5448 X= 705892.1484 Y= 9293534.8131 KAMPUS
X= 705891.7133 X= 705897.9107
Y= 9293518.3253 Y= 9293518.1174 UNIVERSITAS ISLAM

7000
Y= 9293529.4090 Y= 9293529.5977
INTERNASIONAL
X= 705898.0068 X= 705897.9490 X= 705897.6025 X= 705897.3138 X= 705896.8518
X= 705897.2560 INDONESIA (TAHAP III)
Y= 9293506.3342 Y= 9293507.8331 Y= 9293516.8264 Y= 9293524.3208 Y= 9293536.3120
X= 705899.1619 Y= 9293525.8197 X= 705897.8491
Y= 9293497.1218

122 121 118 117 114 113


Y= 9293531.1966

108 107
F.E
SIGAP MEMBANGUN NEGRI
PUPR
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
174 112 111 DIREKTORAT JENDRAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
X= 705899.6056 124 123 X= 705899.5478 X= 705899.2013 120 119 X= 705898.9126 116 115 X= 705898.8549 X= 705898.5084 110 109 X= 705898.4506 Jl. PAM Baru I No.1 Pejompongan, Jakrta Pusat (10210), Telp/Faks. +62-21-57930562/57974228

Y= 9293506.3958 Y= 9293507.8947 Y= 9293516.8880 Y= 9293524.3824 Y= 9293525.8813 Y= 9293534.8747 Y= 9293536.3735 KONSULTAN PERENCANA

4500
X= 705903.6585 X= 705903.4661 PT. WISWAKHARMAN
X= 705899.1436
Y= 9293497.2951 Y= 9293502.2914 Jl. BUKIT SARI RAYA NO. 10
Y= 9293518.3869 SUMURBOTO,
BANYUMANIK, KOTA SEMARANG
JAWA TENGAH 50265
KONFIGURASI TIANG PANCANG FAKULTAS -KSO-
F.D PT. INDAH KARYA
175 173 = TIANG PANCANG 9m + 9m = 170 TITIK
Jl. JAGAKARSA, KAV 1 RT 009 RW
05
JAKARTA SELATAN 12620

DIPERIKSA DAN DISETUJUI OLEH


MANAJEMEN KONSTRUKSI

= TIANG PANCANG 10m = 158 TITIK PT. AMYTHAS


X= 705909.3045 General
Profrssional Independent
Accountable
Consultant
Y= 9293524.7832 Golden Plaza Blok E 21-22, JL RS. Fatmawati, 15, Jakarta, 12420,
RT.8/RW.6, South Gandaria, Cilandak, South Jakarta City, Jakarta 12420

7500
-KSO-
X= 705911.1222 CIRIA
Y= 9293498.3832 X= 705909.9975 X= 705909.9398 X= 705909.5932 X= 705909.5355 X= 705909.2467 X= 705908.9002 X= 705908.8425 Ciria EXPERTINDO
CONSULTANT
Y= 9293506.7962 Y= 9293508.2951 Y= 9293517.2884 Y= 9293518.7873 Y= 9293526.2821 Y= 9293535.2750 Y= 9293536.7739 Expertindo Consultant
Jl. Raya Cilandak KKO No.5 Ragunan, Pasar Minggu Jakarta 12550
X= 705911.1838 X= 705910.9605
Y= 9293496.7844 Y= 9293502.5801
X= 705911.1343
Y= 9293518.8489
125 126 131 132 137 138 143 144
F.C
( Rizalhan, ST, MT )
176 177 172
TEAM LEADER

X= 705911.5963 127 128 X= 705911.5386 X= 705911.1920 133 134 X= 705910.9033 139 140 X= 705910.8455 X= 705910.4990 145 146 X= 705910.4413 DIPERIKSA OLEH TGL PARAF
Y= 9293506.8578 Y= 9293508.3567 Y= 9293517.3500 Y= 9293524.8448 Y= 9293526.3437 Y= 9293535.3366 Y= 9293536.8355 ENGINEER

5000
DIAJUKAN OLEH
X= 705916.1493 X= 705915.9568 X= 705913.2969 129 130 X= 705913.2353 X= 705912.8927 135 136 X= 705912.6040 141 142 X= 705912.5424 X= 705912.1997 147 148 X= 705912.1381 KONTRAKTOR

Y= 9293497.7763 Y= 9293502.7726 Y= 9293506.8733 Y= 9293508.4721 Y= 9293517.3655 Y= 9293524.8599 Y= 9293526.4587 Y= 9293535.3521 Y= 9293536.9509 PERSERO

PT. WASKITA KARYA


DIVISI - I
WASKITA
X= 705912.8311 GEDUNG DAN FASILITAS INDUSTRI
KANTOR DIVISI : JL. M.T. HARYONO KAV. NO. 10 CAWANG

Y= 9293518.9643 F.B JAKARTA 13340 INDONESIA

178 171

X= 705916.3152 149 150 X= 705916.2536 X= 705917.9010


Y= 9293517.4973 Y= 9293519.0961 Y= 9293542.0516

5000
( Agus Ruliyanto, ST, MT )
PROJECT MANAGER

DIPERIKSA OLEH
X= 705922.7945 TGL PARAF

Y= 9293525.3029 151 ENGINEER Achmad Syauqi


X= 705923.4297 X= 705922.3325
Y= 9293508.8148 Y= 9293537.2937 DIGAMBAR OLEH TGL PARAF
F.B1
DRAFTER Andang
X= 705923.4875 X= 705923.0832 X= 705923.0255 X= 705922.7367 X= 705922.3902
Y= 9293507.3159 Y= 9293517.8081 Y= 9293519.3070 Y= 9293526.8018 Y= 9293535.7948
X= 705924.1232 X= 705923.2955 X= 705923.1121 SHOP DRAWING

3500
Y= 9293511.5936 Y= 9293533.0776 Y= 9293542.2524 JUDUL GAMBAR

170 169 163 162 159 158 154 153


F.A DENAH TITIK TIANG
KEYPLAN PANCANG PARSIAL - 02
166 157
152
X= 705925.0863 168 167 X= 705925.0285 X= 705924.6820 165 164 X= 705924.6243 161 160 X= 705924.3355 X= 705923.9890 156 155 X= 705923.9313
Y= 9293507.3775 Y= 9293508.8764 Y= 9293517.8697 Y= 9293519.3686 Y= 9293526.8634 Y= 9293535.8564 Y= 9293537.3553 SKALA GEDUNG NO. GAMBAR HAL

1 : 150 STR-TP-FK-03
X= 705924.3933 FAKULTAS B

-
DENAH TITIK TIANG PANCANG PARSIAL - 02 Y= 9293525.3645 TANGGAL REFERENSI

UIII-FK1-STR
REV.

10-09-2021 R.1
1 : 150 (SB-1-02)
KETERANGAN
KONFIGURASI TIANG PANCANG FAKULTAS - MUTU BETON
* Pondasi Pilecap & Tie Beam fc' = 30MPa KONVERSI ELEVASI
* Tiang Pancang 450x450 fc' = 50MPa
= TIANG PANCANG 9m + 9m = 170 TITIK * Kolom, Balok, & Plat fc' = 30MPa ELEVASI BANGUNAN ELEVASI TOPOGRAFI
±0.000 = +79.350
- MUTU BAJA
* Diameter >/= D10mm (Ulir) fy = 400 MPa
= TIANG PANCANG 10m = 158 TITIK * Diameter < ∅10mm fy = 240 MPa
* Tulangan Utama dan Spiral (BJTD) U-40

- ELEVASI THEATER = SFL.-3.250


- KEDALAMAN PANCANG 18 m (dari ±0.000 Bangunan)
P=120kN
- TOTAL TITIK PANCANG = 328 TITIK
KEYPLAN

No. REVISI TGL DISETUJUI


NAMA PROYEK

PEMBANGUNAN
KAMPUS
UNIVERSITAS ISLAM
INTERNASIONAL
INDONESIA (TAHAP III)
X= 705900.3169 X= 705900.0666 X= 705899.8741 X= 705899.6816 X= 705899.3544

F.E
Y= 9293467.1441 Y= 9293473.6393 Y= 9293478.6355 Y= 9293483.6318 Y= 9293492.1255

SIGAP MEMBANGUN NEGRI


PUPR
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
201 200 192 191 184 DIREKTORAT JENDRAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
X= 705905.0522 X= 705904.5325 X= 705903.8202 SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
Jl. PAM Baru I No.1 Pejompongan, Jakrta Pusat (10210), Telp/Faks. +62-21-57930562/57974228
Y= 9293461.1219 Y= 9293474.6119 Y= 9293493.0982
KONSULTAN PERENCANA
4500

X= 705905.4816 X= 705905.4199 X= 705905.1138 X= 705904.8135 X= 705904.5941 X= 705904.2091 X= 705904.1475 X= 705903.8818 PT. WISWAKHARMAN
Y= 9293449.9802 Y= 9293451.5790 Y= 9293459.5231 Y= 9293467.3173 Y= 9293473.0131 Y= 9293483.0057 Y= 9293484.6045 Y= 9293491.4994 Jl. BUKIT SARI RAYA NO. 10
SUMURBOTO,
BANYUMANIK, KOTA SEMARANG
JAWA TENGAH 50265
-KSO-
F.D PT. INDAH KARYA
212 211 209 210 202 199 198 189 190 182 183 Jl. JAGAKARSA, KAV 1 RT 009 RW
05
JAKARTA SELATAN 12620

DIPERIKSA DAN DISETUJUI OLEH


MANAJEMEN KONSTRUKSI

PT. AMYTHAS
Profrssional Independent
General Accountable
Consultant

Golden Plaza Blok E 21-22, JL RS. Fatmawati, 15, Jakarta, 12420,


RT.8/RW.6, South Gandaria, Cilandak, South Jakarta City, Jakarta 12420
7500

-KSO-
X= 705912.5467 X= 705912.2772 X= 705912.0269 X= 705911.3147 CIRIA
Y= 9293461.4107 Y= 9293468.4055 Y= 9293474.9007 Y= 9293493.3869 Ciria EXPERTINDO
Expertindo Consultant CONSULTANT
Jl. Raya Cilandak KKO No.5 Ragunan, Pasar Minggu Jakarta 12550
X= 705912.9759 X= 705912.9143 X= 705912.6083 X= 705912.3388 X= 705912.0885 X= 705911.8652 X= 705911.7035 X= 705911.6419 X= 705911.3763
Y= 9293450.2689 Y= 9293451.8677 Y= 9293459.8118 Y= 9293466.8067 Y= 9293473.3018 Y= 9293479.0975 Y= 9293483.2944 Y= 9293484.8932 Y= 9293491.7881

F.C
( Rizalhan, ST, MT )
214 213 207 208 203 204 197 196 193 187 188 181 180
TEAM LEADER

DIPERIKSA OLEH TGL PARAF

ENGINEER
5000

DIAJUKAN OLEH
X= 705917.9414 X= 705917.5738 X= 705917.3043 X= 705917.0540 X= 705916.8615 X= 705916.6690 X= 705916.5054 X= 705916.3418 KONTRAKTOR

Y= 9293451.2608 Y= 9293460.8038 Y= 9293467.7986 Y= 9293474.2937 Y= 9293479.2900 Y= 9293484.2863 Y= 9293488.5332 Y= 9293492.7800 PERSERO

PT. WASKITA KARYA


DIVISI - I
WASKITA
GEDUNG DAN FASILITAS INDUSTRI
KANTOR DIVISI : JL. M.T. HARYONO KAV. NO. 10 CAWANG

F.B JAKARTA 13340 INDONESIA

215 206 205 195 194 186 185 179

( Agus Ruliyanto, ST, MT )


9550 7000 6500 5000 5000 4250 4250 PROJECT MANAGER

DIPERIKSA OLEH TGL PARAF


F.10 F.11 F.12 F.13 F.14 F.15 F.16 F.17
ENGINEER Achmad Syauqi

DIGAMBAR OLEH TGL PARAF

-
DENAH TITIK TIANG PANCANG PARSIAL - 03 DRAFTER Andang
1 : 150
SHOP DRAWING
JUDUL GAMBAR

DENAH TITIK TIANG


PANCANG PARSIAL - 03

SKALA GEDUNG NO. GAMBAR HAL

1 : 150 STR-TP-FK-04
FAKULTAS B
TANGGAL REFERENSI REV.

10-09-2021 UIII-FK1-STR
R.1
(SB-1-02)
KETERANGAN
KONFIGURASI TIANG PANCANG FAKULTAS - MUTU BETON
* Pondasi Pilecap & Tie Beam fc' = 30MPa KONVERSI ELEVASI
* Tiang Pancang 450x450 fc' = 50MPa
= TIANG PANCANG 9m + 9m = 170 TITIK * Kolom, Balok, & Plat fc' = 30MPa ELEVASI BANGUNAN ELEVASI TOPOGRAFI
±0.000 = +79.350
- MUTU BAJA
* Diameter >/= D10mm (Ulir) fy = 400 MPa
= TIANG PANCANG 10m = 158 TITIK * Diameter < ∅10mm fy = 240 MPa
* Tulangan Utama dan Spiral (BJTD) U-40

- ELEVASI THEATER = SFL.-3.250


- KEDALAMAN PANCANG 18 m (dari ±0.000 Bangunan)
P=120kN
- TOTAL TITIK PANCANG = 328 TITIK
KEYPLAN

No. REVISI TGL DISETUJUI


NAMA PROYEK

PEMBANGUNAN
KAMPUS
UNIVERSITAS ISLAM
X= 705902.7462 X= 705902.5537 X= 705902.2264 X= 705901.8414 X= 705901.5912 INTERNASIONAL
Y= 9293404.0909 Y= 9293409.0871 Y= 9293417.5808 Y= 9293427.5734 Y= 9293434.0686 INDONESIA (TAHAP III)

F.E
243 242
X= 705906.6923
236 229 220
SIGAP MEMBANGUN NEGRI
PUPR
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Y= 9293418.5535 DIREKTORAT JENDRAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
4500

SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN


X= 705907.4353 X= 705907.2428 X= 705907.0503 X= 705906.7539 X= 705906.3383 X= 705906.0878 X= 705905.8184 Jl. PAM Baru I No.1 Pejompongan, Jakrta Pusat (10210), Telp/Faks. +62-21-57930562/57974228

Y= 9293399.2678 Y= 9293404.2641 Y= 9293409.2604 Y= 9293416.9547 Y= 9293427.7467 Y= 9293434.2419 Y= 9293441.2367 KONSULTAN PERENCANA

PT. WISWAKHARMAN
Jl. BUKIT SARI RAYA NO. 10

F.D SUMURBOTO,
BANYUMANIK, KOTA SEMARANG
JAWA TENGAH 50265
249 244 241 234 235 228 221 219 -KSO-
PT. INDAH KARYA
Jl. JAGAKARSA, KAV 1 RT 009 RW
05
JAKARTA SELATAN 12620

DIPERIKSA DAN DISETUJUI OLEH


MANAJEMEN KONSTRUKSI

PT. AMYTHAS
7500

Profrssional Independent
General Accountable

X= 705914.1867 X= 705913.8017 X= 705913.5515 X= 705913.2820 Consultant

Golden Plaza Blok E 21-22, JL RS. Fatmawati, 15, Jakarta, 12420,


Y= 9293418.8422 Y= 9293428.8348 Y= 9293435.3300 Y= 9293442.3248 RT.8/RW.6, South Gandaria, Cilandak, South Jakarta City, Jakarta 12420

-KSO-
X= 705914.9298 X= 705914.7373 X= 705914.5756 X= 705914.5140 X= 705914.2483 X= 705913.8633 X= 705913.6131 X= 705913.3436 CIRIA
Y= 9293399.5566 Y= 9293404.5528 Y= 9293408.7497 Y= 9293410.3485 Y= 9293417.2434 Y= 9293427.2360 Y= 9293433.7312 Y= 9293440.7260 Ciria EXPERTINDO
Expertindo Consultant CONSULTANT
Jl. Raya Cilandak KKO No.5 Ragunan, Pasar Minggu Jakarta 12550

F.C
248 245 240 239 232 233 226 227 222 223 217 218

( Rizalhan, ST, MT )
TEAM LEADER
5000

DIPERIKSA OLEH TGL PARAF


X= 705919.9261 X= 705919.7336 X= 705919.5411 X= 705919.3774 X= 705919.2138 X= 705919.0213 X= 705918.8288 X= 705918.5786 X= 705918.3091 ENGINEER
Y= 9293399.7490 Y= 9293404.7453 Y= 9293409.7416 Y= 9293413.9885 Y= 9293418.2353 Y= 9293423.2316 Y= 9293428.2279 Y= 9293434.7231 Y= 9293441.7179
DIAJUKAN OLEH
KONTRAKTOR

PERSERO
F.B PT. WASKITA KARYA
247 246 238 237 231 230 225 224 216 WASKITA DIVISI - I
GEDUNG DAN FASILITAS INDUSTRI
KANTOR DIVISI : JL. M.T. HARYONO KAV. NO. 10 CAWANG
JAKARTA 13340 INDONESIA

5000 5000 4250 4250 5000 5000 6500 7000

F.1 F.2 F.3 F.4 F.5 F.6 F.7 F.8 F.9 ( Agus Ruliyanto, ST, MT )
PROJECT MANAGER

DIPERIKSA OLEH TGL PARAF

-
DENAH TITIK TIANG PANCANG PARSIAL - 04 ENGINEER Achmad Syauqi

1 : 150 DIGAMBAR OLEH TGL PARAF

DRAFTER Andang

SHOP DRAWING
JUDUL GAMBAR

DENAH TITIK TIANG


PANCANG PARSIAL - 04

SKALA GEDUNG NO. GAMBAR HAL

1 : 150 STR-TP-FK-05
FAKULTAS B
TANGGAL REFERENSI REV.

10-09-2021 UIII-FK1-STR
R.1
(SB-1-02)
KETERANGAN
KONFIGURASI TIANG PANCANG FAKULTAS - MUTU BETON
* Pondasi Pilecap & Tie Beam fc' = 30MPa KONVERSI ELEVASI
* Tiang Pancang 450x450 fc' = 50MPa
= TIANG PANCANG 9m + 9m = 170 TITIK * Kolom, Balok, & Plat fc' = 30MPa ELEVASI BANGUNAN ELEVASI TOPOGRAFI
±0.000 = +79.350
- MUTU BAJA
* Diameter >/= D10mm (Ulir) fy = 400 MPa
= TIANG PANCANG 10m = 158 TITIK * Diameter < ∅10mm fy = 240 MPa
* Tulangan Utama dan Spiral (BJTD) U-40

- ELEVASI THEATER = SFL.-3.250


- KEDALAMAN PANCANG 18 m (dari ±0.000 Bangunan)
P=120kN
- TOTAL TITIK PANCANG = 328 TITIK
KEYPLAN

No. REVISI TGL DISETUJUI


NAMA PROYEK

PEMBANGUNAN
KAMPUS
UNIVERSITAS ISLAM
INTERNASIONAL
INDONESIA (TAHAP III)

X= 705859.9705
Y= 9293397.4391
X= 705859.7780
Y= 9293402.4354
X= 705859.5855
Y= 9293407.4317
X= 705859.4219
Y= 9293411.6785
X= 705859.2583
Y= 9293415.9254
X= 705859.0658
Y= 9293420.9217
X= 705858.8733
Y= 9293425.9180
X= 705858.6231
Y= 9293432.4131
X= 705858.3536
Y= 9293439.4080
SIGAP MEMBANGUN NEGRI
PUPR
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
F.B' DIREKTORAT JENDRAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
252 253 261 262 263 269 270 279 280 SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
Jl. PAM Baru I No.1 Pejompongan, Jakrta Pusat (10210), Telp/Faks. +62-21-57930562/57974228

X= 705864.2238 X= 705863.8388 X= 705863.5886 KONSULTAN PERENCANA

Y= 9293416.9173 Y= 9293426.9099 Y= 9293433.4050 PT. WISWAKHARMAN


5000

Jl. BUKIT SARI RAYA NO. 10


SUMURBOTO,
X= 705864.9668 X= 705864.7743 X= 705864.6126 X= 705864.5510 X= 705864.2854 X= 705863.9004 X= 705863.6502 X= 705863.3807 X= 705863.3191 BANYUMANIK, KOTA SEMARANG
JAWA TENGAH 50265
Y= 9293397.6316 Y= 9293402.6279 Y= 9293406.8248 Y= 9293408.4236 Y= 9293415.3185 Y= 9293425.3111 Y= 9293431.8062 Y= 9293438.8010 Y= 9293440.3999 -KSO-
PT. INDAH KARYA
Jl. JAGAKARSA, KAV 1 RT 009 RW
05
F.C' JAKARTA SELATAN 12620

DIPERIKSA DAN DISETUJUI OLEH


251 254 259 260 264 265 271 272 277 278 281 282 MANAJEMEN KONSTRUKSI

PT. AMYTHAS
Profrssional Independent
General Accountable
Consultant

Golden Plaza Blok E 21-22, JL RS. Fatmawati, 15, Jakarta, 12420,


RT.8/RW.6, South Gandaria, Cilandak, South Jakarta City, Jakarta 12420

-KSO-
CIRIA
Ciria
7500

EXPERTINDO
X= 705871.7182 Expertindo Consultant CONSULTANT
Y= 9293417.2060 Jl. Raya Cilandak KKO No.5 Ragunan, Pasar Minggu Jakarta 12550

X= 705872.4613 X= 705872.2688 X= 705872.0763 X= 705871.7798 X= 705871.3640 X= 705871.1138 X= 705870.8443


Y= 9293397.9203 Y= 9293402.9166 Y= 9293407.9129 Y= 9293415.6072 Y= 9293426.3992 Y= 9293432.8944 Y= 9293439.8892

( Rizalhan, ST, MT )
TEAM LEADER
F.D'
250 255 258 266 267 273 276 283 DIPERIKSA OLEH TGL PARAF

ENGINEER

DIAJUKAN OLEH
KONTRAKTOR
4500

X= 705876.7654 X= 705876.5729 X= 705876.2457 X= 705875.8607 X= 705875.6105 PERSERO


Y= 9293403.0899 Y= 9293408.0862 Y= 9293416.5799 Y= 9293426.5725 Y= 9293433.0676 PT. WASKITA KARYA
DIVISI - I
WASKITA
GEDUNG DAN FASILITAS INDUSTRI
KANTOR DIVISI : JL. M.T. HARYONO KAV. NO. 10 CAWANG
JAKARTA 13340 INDONESIA

F.E'
256 257 268 274 275

( Agus Ruliyanto, ST, MT )


PROJECT MANAGER

DIPERIKSA OLEH TGL PARAF


F.1 F.2 F.3 F.4 F.5 F.6 F.7 F.8 F.9
ENGINEER Achmad Syauqi

DIGAMBAR OLEH TGL PARAF

1
DENAH TITIK TIANG PANCANG PARSIAL - 05 DRAFTER Andang

1 : 150
SHOP DRAWING
JUDUL GAMBAR

DENAH TITIK TIANG


PANCANG PARSIAL - 05

SKALA GEDUNG NO. GAMBAR HAL

1 : 150 STR-TP-FK-06
FAKULTAS B
TANGGAL REFERENSI REV.

10-09-2021 UIII-FK1-STR
R.1
(SB-1-02)
KETERANGAN
KONFIGURASI TIANG PANCANG FAKULTAS - MUTU BETON
* Pondasi Pilecap & Tie Beam fc' = 30MPa KONVERSI ELEVASI
* Tiang Pancang 450x450 fc' = 50MPa
= TIANG PANCANG 9m + 9m = 170 TITIK * Kolom, Balok, & Plat fc' = 30MPa ELEVASI BANGUNAN ELEVASI TOPOGRAFI
±0.000 = +79.350
- MUTU BAJA
* Diameter >/= D10mm (Ulir) fy = 400 MPa
= TIANG PANCANG 10m = 158 TITIK * Diameter < ∅10mm fy = 240 MPa
* Tulangan Utama dan Spiral (BJTD) U-40

- ELEVASI THEATER = SFL.-3.250


- KEDALAMAN PANCANG 18 m (dari ±0.000 Bangunan)
P=120kN
- TOTAL TITIK PANCANG = 328 TITIK
KEYPLAN

No. REVISI TGL DISETUJUI


NAMA PROYEK

PEMBANGUNAN
KAMPUS
UNIVERSITAS ISLAM
INTERNASIONAL
X= 705857.9859 X= 705857.6182 X= 705857.3487 X= 705857.0985 X= 705856.9060 X= 705856.7135 X= 705856.5499 X= 705856.3863 INDONESIA (TAHAP III)
Y= 9293448.9509 Y= 9293458.4938 Y= 9293465.4886 Y= 9293471.9838 Y= 9293476.9801 Y= 9293481.9764 Y= 9293486.2232 Y= 9293490.4701

F.B'
288 289 298 299 307 308 314 315 SIGAP MEMBANGUN NEGRI
PUPR
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDRAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
X= 705862.9514 X= 705862.5837 X= 705862.3142 X= 705862.0640 X= 705861.3518 SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
Y= 9293449.9428 Y= 9293459.4857 Y= 9293466.4805 Y= 9293472.9757 Y= 9293491.4620 Jl. PAM Baru I No.1 Pejompongan, Jakrta Pusat (10210), Telp/Faks. +62-21-57930562/57974228
5000

KONSULTAN PERENCANA

X= 705863.0130 X= 705862.6453 X= 705862.3758 X= 705862.1256 X= 705861.9023 X= 705861.7406 X= 705861.6790 X= 705861.4134 PT. WISWAKHARMAN
Y= 9293448.3440 Y= 9293457.8869 Y= 9293464.8817 Y= 9293471.3769 Y= 9293477.1726 Y= 9293481.3695 Y= 9293482.9683 Y= 9293489.8632 Jl. BUKIT SARI RAYA NO. 10
SUMURBOTO,
BANYUMANIK, KOTA SEMARANG
JAWA TENGAH 50265
-KSO-
F.C' PT. INDAH KARYA
286 287 290 291 296 297 300 301 306 309 310 316 317 Jl. JAGAKARSA, KAV 1 RT 009 RW
05
JAKARTA SELATAN 12620

DIPERIKSA DAN DISETUJUI OLEH


MANAJEMEN KONSTRUKSI

PT. AMYTHAS
Profrssional Independent
General Accountable
Consultant

Golden Plaza Blok E 21-22, JL RS. Fatmawati, 15, Jakarta, 12420,


RT.8/RW.6, South Gandaria, Cilandak, South Jakarta City, Jakarta 12420
7500

-KSO-
X= 705870.0782 X= 705869.5584 X= 705868.8462
Y= 9293459.7744 Y= 9293473.2644 Y= 9293491.7507 CIRIA
Ciria EXPERTINDO
Expertindo Consultant CONSULTANT
X= 705870.5074 X= 705870.4458 X= 705870.1398 X= 705869.8395 X= 705869.6200 X= 705869.2350 X= 705869.1734 X= 705868.9078 Jl. Raya Cilandak KKO No.5 Ragunan, Pasar Minggu Jakarta 12550

Y= 9293448.6327 Y= 9293450.2315 Y= 9293458.1756 Y= 9293465.9698 Y= 9293471.6656 Y= 9293481.6582 Y= 9293483.2570 Y= 9293490.1519

F.D'
284 285 292 293 295 302 303 311 312 318 319 ( Rizalhan, ST, MT )
TEAM LEADER

DIPERIKSA OLEH TGL PARAF


4500

ENGINEER
X= 705874.3361 X= 705874.0859 X= 705873.8934 X= 705873.7009 X= 705873.3737
DIAJUKAN OLEH
Y= 9293466.1431 Y= 9293472.6383 Y= 9293477.6346 Y= 9293482.6309 Y= 9293491.1246 KONTRAKTOR

PERSERO

PT. WASKITA KARYA


F.E' WASKITA DIVISI - I
GEDUNG DAN FASILITAS INDUSTRI
KANTOR DIVISI : JL. M.T. HARYONO KAV. NO. 10 CAWANG
294 304 305 313 320 JAKARTA 13340 INDONESIA

F.10 F.11 F.12 F.13 F.14 F.15 F.16 F.17 ( Agus Ruliyanto, ST, MT )
PROJECT MANAGER

-
DENAH TITIK TIANG PANCANG PARSIAL - 06 DIPERIKSA OLEH TGL PARAF

1 : 150 ENGINEER Achmad Syauqi

DIGAMBAR OLEH TGL PARAF

DRAFTER Andang

SHOP DRAWING
JUDUL GAMBAR

DENAH TITIK TIANG


PANCANG PARSIAL - 06

SKALA GEDUNG NO. GAMBAR HAL

1 : 150 STR-TP-FK-07
FAKULTAS B
TANGGAL REFERENSI REV.

10-09-2021 UIII-FK1-STR
R.1
(SB-1-02)
KETERANGAN

TABEL CUT OF TABEL CUT OF TABEL CUT OF TABEL CUT OF TABEL CUT OF TABEL CUT OF TABEL CUT OF TABEL CUT OF
PILE (COP) PILE (COP) PILE (COP) PILE (COP) PILE (COP) PILE (COP) PILE (COP) PILE (COP)
Nomor Elevasi Nomor Elevasi Nomor Elevasi Nomor Elevasi Nomor Elevasi Nomor Elevasi Nomor Elevasi Nomor Elevasi
Pancang COP Pancang COP Pancang COP Pancang COP Pancang COP Pancang COP Pancang COP Pancang COP

01 -1075 42 -975 83 -1075 124 -1075 165 -1075 206 -925 247 -925 288 -925
02 -1075 43 -975 84 -1075 125 -975 166 -825 207 -1075 248 -925 289 -925
03 -1075 44 -975 85 -1075 126 -975 167 -1075 208 -1075 249 -3925 290 -1075
No. REVISI TGL DISETUJUI
04 -1075 45 -975 86 -1075 127 -975 168 -1075 209 -1075 250 -925 291 -1075 NAMA PROYEK

PEMBANGUNAN
05 -825 46 -975 87 -1075 128 -975 169 -1075 210 -1075 251 -925 292 -1075 KAMPUS
06 -1075 47 -1075 88 -1075 129 -975 170 -1075 211 -1075 252 -925 293 -1075 UNIVERSITAS ISLAM
INTERNASIONAL
07 -1075 48 -1075 89 -1075 130 -975 171 -925 212 -1075 253 -925 294 -925 INDONESIA (TAHAP III)

PUPR
08 -1075 49 -1075 90 -925 131 -975 172 -825 213 -1075 254 -825 295 -725
09 -1075 50 -1075 91 -1075 132 -975 173 -925 214 -1075 255 -925 296 -975
SIGAP MEMBANGUN NEGRI
10 -1075 51 -975 92 -1075 133 -975 174 -925 215 -925 256 -925 297 -975 KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDRAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
11 -1075 52 -975 93 -1075 134 -975 175 -925 216 -925 257 -925 298 -925 SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN
Jl. PAM Baru I No.1 Pejompongan, Jakrta Pusat (10210), Telp/Faks. +62-21-57930562/57974228

12 -1075 53 -975 94 -1075 135 -975 176 -975 217 -1075 258 -925 299 -925 KONSULTAN PERENCANA

PT. WISWAKHARMAN
13 -1075 54 -975 95 -1075 136 -975 177 -975 218 -1075 259 -975 300 -975 Jl. BUKIT SARI RAYA NO. 10
SUMURBOTO,
BANYUMANIK, KOTA SEMARANG

14 -825 55 -975 96 -1075 137 -975 178 -925 219 -925 260 -975 301 -975 JAWA TENGAH 50265
-KSO-

15 -1075 56 -975 97 -1075 138 -975 179 -925 220 -925 261 -925 302 -875 PT. INDAH KARYA
Jl. JAGAKARSA, KAV 1 RT 009 RW
05

16 -1075 57 -975 98 -1075 139 -975 180 -975 221 -725 262 -925 303 -875
JAKARTA SELATAN 12620

DIPERIKSA DAN DISETUJUI OLEH


MANAJEMEN KONSTRUKSI

17 -1075 58 -975 99 -1075 140 -975 181 -975 222 -825 263 -925 304 -925 PT. AMYTHAS
Profrssional Independent
General

18 -1075 59 -875 100 -1075 141 -975 182 -1075 223 -825 264 -975 305 -925
Accountable
Consultant

Golden Plaza Blok E 21-22, JL RS. Fatmawati, 15, Jakarta, 12420,


RT.8/RW.6, South Gandaria, Cilandak, South Jakarta City, Jakarta 12420

19 -925 60 -875 101 -1075 142 -975 183 -1075 224 -925 265 -975 306 -825 -KSO-
CIRIA
20 -925 61 -1075 102 -1075 143 -1075 184 -925 225 -925 266 -875 307 -925 Ciria EXPERTINDO
Expertindo Consultant CONSULTANT
Jl. Raya Cilandak KKO No.5 Ragunan, Pasar Minggu Jakarta 12550

21 -1075 62 -1075 103 -1075 144 -1075 185 -925 226 -1875 267 -875 308 -925
22 -1075 63 -1075 104 -1075 145 -1075 186 -925 227 -1875 268 -925 309 -975
23 -1075 64 -1075 105 -1075 146 -1075 187 -975 228 -1725 269 -925 310 -975 ( Rizalhan, ST, MT )

24 -1075 65 -1075 106 -1075 147 -1075 188 -975 229 -1725 270 -925 311 -875 TEAM LEADER

DIPERIKSA OLEH TGL PARAF

25 -1075 66 -1075 107 -1075 148 -1075 189 -875 230 -925 271 -975 312 -875 ENGINEER

26 -1075 67 -1075 108 -1075 149 -1075 190 -875 231 -925 272 -975 313 -925 DIAJUKAN OLEH
KONTRAKTOR

27 -975 68 -1075 109 -1075 150 -1075 191 -925 232 -4075 273 -725 314 -925 PERSERO

PT. WASKITA KARYA


DIVISI - I

28 -975 69 -1075 110 -1075 151 -925 192 -925 233 -4075 274 -925 315 -925
WASKITA
GEDUNG DAN FASILITAS INDUSTRI
KANTOR DIVISI : JL. M.T. HARYONO KAV. NO. 10 CAWANG
JAKARTA 13340 INDONESIA

29 -975 70 -1075 111 -875 152 -950 193 -825 234 -4075 275 -925 316 -975
30 -975 71 -1075 112 -875 153 -1075 194 -925 235 -4075 276 -775 317 -975
31 -975 72 -1075 113 -975 154 -1075 195 -925 236 -3925 277 -975 318 -1075 ( Agus Ruliyanto, ST, MT )
PROJECT MANAGER
32 -975 73 -1075 114 -975 155 -1075 196 -975 237 -925 278 -975 319 -1075 DIPERIKSA OLEH TGL PARAF

33 -2575 74 -1075 115 -975 156 -1075 197 -975 238 -925 279 -925 320 -925 ENGINEER Achmad Syauqi

34 -2575 75 -1075 116 -975 157 -825 198 -875 239 -4075 280 -925 321 -925
DIGAMBAR OLEH TGL PARAF

DRAFTER Andang

35 -975 76 -1075 117 -975 158 -1075 199 -875 240 -4075 281 -1075 322 -925
SHOP DRAWING
36 -975 77 -1075 118 -975 159 -1075 200 -925 241 -3925 282 -1075 323 -975 JUDUL GAMBAR

37 -975 78 -1075 119 -975 160 -1075 201 -925 242 -3925 283 -925 324 -975
38 -975 79 -1075 120 -975 161 -1075 202 -725 243 -925 284 -1075 325 -925 TABEL CUT OF PILE (COP)

39 -975 80 -1075 121 -1075 162 -1075 203 -975 244 -3925 285 -1075 326 -925
40 -975 81 -925 122 -1075 163 -1075 204 -975 245 -3925 286 -1075 327 -825
SKALA GEDUNG NO. GAMBAR HAL

STR-TP-FK-08
41 -975 82 -1075 123 -1075 164 -1075 205 -925 246 -925 287 -1075 328 -925 TANGGAL
FAKULTAS B
REFERENSI REV.

10-09-2021 UIII-FK1-STR
R.1
(SB-1-02)