You are on page 1of 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTE
A 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE A
NOTED AND COORDINATES ARE IN MILLIMETERS UNLESS
OTHERWISE NOTED.
2. FINISHED GROUND LEVEL (FGL) = EL.+4,500mm
FINISHED GROUND FLOOR LEVEL(FGFL) = EL.+4,800mm
3. CONCRETE STRENGTH
DWG.LIMIT N 6,883.000
1) f'c=30.0MPa : OILY & WASTE WATER DRAINAGE
2) f'c=13.8MPa : LEAN CONCRETE
f'c=CYLINDER COMPRESSIVE STRENGTH AT 28 DAY
4. REINFORCING BAR STRENGTH
COAL WASH DOWN
1) DEFORMED BAR
COLLECTION #8
GRADE SD390, fy=400MPa
C19
PN
TN

B 5. CEMENT B
3000Lx2000Wx2500D
E 3,668.786 TYPE OF CEMENT WILL BE TYPE 1 PORTLAND CEMENT FOR GENERAL
APPLICATIONS AND FOR SEAWATER APPLICATIONS PORTLAND BLAST
N 6,861.224
FURNACE CEMENT OR EQUIVALENT ALONG WITH WATERPROOFING
E.3674.034 COMPOUND SHALL BE USED.
E.3668.786 N.6867.472 6. CONCRETE COVER (CAST-IN-PLACE CONCRTE)
N.6862.224 D200, IL.3,560
E.3667.286
D200, IL.3,560 CAST-IN-PLACE CONCRTE(NON PRESTRESSED)
N.6861.224
E.3659.745 D300, IL.3,350 COLUMN WALL
CONDITION OF EXPOSURE FOUNDATION BEAM SLAB
N.6860.378
D300, IL.3,500 E.3674.034 CONCRETE NOT
- 40 20
N.6858.476 EXPOSED TO WATER
D200, IL.3,560 CONCRETE EXPOSED TO
C C
EARTH OR WEATHER 75 40 40
COAL JUNCTION (GROUND WATER (75) (75) (75)
TOWER-08 OR SEA WATER)
E.3678.200
N.6847.378 CONCRETE CAST AGAINST
D200, IL.3,950 E.3681.352 E.3682.175 AND PERMANENTLY 75 75 75
E.3668.286 E.3668.286 EXPOSED TO EARTH
N.6859.248 N.6859.248 E.3678.629 N.6847.906 N.6848.430
E.3675.558
D200, EL.4,800 D200, IL.3,560 N.6847.378 D200, IL.3,560 D200, IL.3,560 7. CHAMFERED CORNERS OF CONCRETE
N.6848.430
D200, IL.3,560 ALL EXPOSED CORNERS (ANGLE OF 90° OR LESS) OF REINFORCE
D200, IL.3,560 E.3682.604 E.3681.781 CONCRETE SHOULD BE CHAMFERED. (25mmX25mm)
E.3675.034 N.6848.430 N.6847.906
8. ALL STEEL MATERIALS SHALL BE HOT-DIP GALVANIZED OR PAINTING.
N.6847.906 D200, IL.3,950 D200, IL.3,950
E.3674.534 D200, IL.3,560 9. PIPE MATERIAL : -
D N.6847.378 REGULAR WASTE WATER : HDPE D
D200, IL.3,560 E.3700.878
E.3684.104 IRREGULAR WASTE WATER : HDPE
N.6847.378 OILY WASTE WATER : HDPE
E.3674.034 N.6846.850
D200, IL.3,560 BLOW DOWN : GRE (DESIGNED & SUPPLIED BY PIPING ENG.)
N.6846.850 D200, IL.3,560
E.3700.350 SEAWASTE WATER : HDPE
D200, IL.3,560 E.3684.104
N.6846.850 10. ALL INSIDE SURFACE OF CHEMICAL WASTE WATER SUMP PUMP PIT & CHEMICAL
N.6845.740
D200, IL.3,560 SUMP PIT SHOULD BE PAINTED WITH CHEMICAL RESISTANT PAINT AND
D200, IL.3,560
ALL INSIDE SURFACE OF OILY WASTE WATER SUMP PUMP PIT & OILY SUMP PIT
E.3676.021 E.3676.450 SHOULD BE PAINTED WITH OILY RESISTANT PAINT.
N.6847.378 N.6847.378 E.3684.104
D200, IL.3,560 D200, IL.3,950 E.3682.604 N.6845.350 LEGEND
N.6845.350 D200, IL.3,950
E D200, IL.3,950 CHEMICAL WASTE WATER E
E.3676.450 E.3676.450 E.3681.781
N.6841.950 OILY WASTE WATER
N.6843.802 N.6843.802 5FCR1
D200, IL.3,950 D200, EL.4,800 D200, IL.3,950 BLOW DOWN (SUPPLIED BY PIPING)
E.3681.781 CHS REUSE POND
AREA SEAWASTE WATER
N.6841.950
D200, IL.6,850 SEAWASTE WATER(NOT USED)
SWRO (SUPPLIED BY PIPING)
E.3678.200 E.3678.200 E.3681.781 E.3681.781
N.6843.802 N.6843.802 N.6841.150 N.6841.150 C = CHEMICAL WASTE WATER SUMP PUMP PIT
D200, IL.3,950 D200, EL.4,800 D200, EL.6,000 D200, IL.6,850
O = OILY WASTE WATER SUMP PUMP PIT
F C-S = CHEMICAL SUMP PIT F
O-S = OILY WASTE WATER SUMP PIT
IL = ELEVATION OF INVERT LEVEL
DWG.LIMIT E 3,570.000

DWG.LIMIT E 3,750.000
S-P = SOAKAWAY PIT

REFERENCE DOCUMENTS/DRAWINGS
DOC/DWG NO. TITLE

NS2-UC07-P0ZEN-110002 PLOT PLAN


NS2-XB02-P0UZT-165804 OILY & WASTE WATER DRAINAGE OVERALL LAYOUT DRAWING

G NS2-XB02-P0UZT-165807 OILY & WASTE WATER TRANSFER SUMP PLAN & SECTION DRAWING G
NS2-VK02-P0UZT-165808 OILY & WASTE WATER DRAINAGE STRUCTURE DETAIL DRAWING
NS2-XG02-P0GM-110001~3 P&I DIAGRAM / WASTE WATER TRANSFER SYSTEM(CHEMICAL)
NS2-XG02-P0GM-110004 P&I DIAGRAM / WASTE WATER TRANSFER SYSTEM(SEAWATER)
NS2-XG02-P0GM-110005~6 P&I DIAGRAM / WASTE WATER TRANSFER SYSTEM(OILY)
NS2-YD00-P0GM-120001 LAYOUT DRAWING OF WASTE WATER TRANSFER SYSTEM(VERTICAL)
NS2-YD00-P0GM-120002 LAYOUT DRAWING OF WASTE WATER TRANSFER SYSTEM(SUBMERSIBLE)

E.3700.350 E.3700.878 E.3739.000


N.6787.066 N.6787.566 N.6787.566 FOR CONSTRUCTION
D200, IL.3,560 D200, IL.3,560 D200, IL.3,560
THIS DRAWING IS THE PROPERTY OF DOOSAN HEAVY INDUSTRIES VIETNAM.
H H
IT IS NOT TO BE COPIED OR USED IN ANY WAY DETRIMENTAL TO THE COMPANY.

E.3738.516 5FCR1 12.08.2022 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE


N.6787.066
D200, IL.3,560 5INT4 06.07.2022 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE

5INT3 15.04.2022 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE

5INT2 03.03.2022 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE

5INT1 12.08.2021 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE

5 25.03.2021 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE


J J
REV. DATE DESCRIPTION DRAWN CHKD. APPD.
NO.

Project

NGHI SON 2 BOT THERMAL POWER PLANT PROJECT

E.3738.516 E.3739.000
N.6753.555 Owner
E.3624.095 E.3625.223 N.6753.555
N.6754.872 N.6754.872 D200, IL.3,560 D200, IL.3,560
D200, IL.3,560 D200, IL.3,560
K E.3624.095 E.3625.223 E.3738.516 E.3739.000 K
N.6754.472 N.6754.472 N.6753.094 N.6753.095
D200, IL.3,100 D200, IL.3,100 Owner's Engineer
D200, IL.3,160 D200, IL.3,160

E.3624.095
N.6743.630
E.3722.200 Contractor
8000

D200, IL.3,160

8440
N.6743.230
E.3624.095 D200, IL.3,560
N.6743.230 Doosan Heavy Industries Vietnam
E.3738.516 E.3739.000
D200, IL.3,560
N.6742.456 N.6742.456
L D200, IL.3,100 D200, IL.3,100 Sub-Supplier L
8000 8000
E.3738.516 E.3739.000
N.6741.996 N.6741.997
D200, IL.3,560 D200, IL.3,560

DRAWING TITLE
E.3624.623 E.3625.223 DWG.LIMIT N 6,738.000
N.6742.364 N.6742.364
D200, IL.3,560 D200, IL.3,160 OILY & WASTE WATER DRAINAGE
PLAN DRAWING
OILY & WASTE WATER DRAINAGE PLAN DRAWING-12
M SCALE : 1/300 M
SCALE DRAWING NUMBER SHEET NO. REV. NO.

1 : 300 NS2-XB02-P0UZT-165806 11 OF 21 5FCR1


A1 (841 x 594)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTE
5FCR1 2500
A 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE A
NOTED AND COORDINATES ARE IN MILLIMETERS UNLESS
75CL. 100 2000 100 75CL.
OTHERWISE NOTED.
75CL. 75CL. 25

50CL.
2. FINISHED GROUND LEVEL (FGL) = EL.+4,500mm
FINISHED GROUND FLOOR LEVEL(FGFL) = EL.+4,800mm
3. CONCRETE STRENGTH

1275
1) f'c=30.0MPa : OILY & WASTE WATER DRAINAGE
2) f'c=13.8MPa : LEAN CONCRETE
f'c=CYLINDER COMPRESSIVE STRENGTH AT 28 DAY

7@200=1400
2550
4. REINFORCING BAR STRENGTH
1) DEFORMED BAR

1800
GRADE SD390, fy=400MPa
PN
TN

B 5. CEMENT B

1275
DWG.LIMIT N 6,178.000 TYPE OF CEMENT WILL BE TYPE 1 PORTLAND CEMENT FOR GENERAL

125
APPLICATIONS AND FOR SEAWATER APPLICATIONS PORTLAND BLAST

150
FURNACE CEMENT OR EQUIVALENT ALONG WITH WATERPROOFING
COMPOUND SHALL BE USED.
6. CONCRETE COVER (CAST-IN-PLACE CONCRTE)

75CL.
CAST-IN-PLACE CONCRTE(NON PRESTRESSED)
1275 1275
75CL. 175 6@200=1800 COLUMN WALL
CONDITION OF EXPOSURE FOUNDATION BEAM SLAB
2550
100
2500 CONCRETE NOT
EXPOSED TO WATER - 40 20

CONCRETE EXPOSED TO
C C
DETAIL OF COVER TYP REBAR DETAIL OF SUMP 1 DETAIL EARTH OR WEATHER
(GROUND WATER
75
(75)
40
(75)
40
(75)
(SH. 15 OF 21) SCALE : 1/40 (SH. 15 OF 21) SCALE : 1/40 15 OF 21 SCALE : NONE OR SEA WATER)
CONCRETE CAST AGAINST
AND PERMANENTLY 75 75 75
DWG.LIMIT N 6,088.000 EXPOSED TO EARTH

7. CHAMFERED CORNERS OF CONCRETE


ALL EXPOSED CORNERS (ANGLE OF 90° OR LESS) OF REINFORCE
CONCRETE SHOULD BE CHAMFERED. (25mmX25mm)
8. ALL STEEL MATERIALS SHALL BE HOT-DIP GALVANIZED OR PAINTING.
COAL JUNCTION 9. PIPE MATERIAL : -
E.3623.000 38°
D N.6080.679 TOWER-04 REGULAR WASTE WATER : HDPE D
D450, IL.3,700 IRREGULAR WASTE WATER : HDPE

06
OILY WASTE WATER : HDPE

80
BLOW DOWN : GRE (DESIGNED & SUPPLIED BY PIPING ENG.)
SEAWASTE WATER : HDPE
50°
10. ALL INSIDE SURFACE OF CHEMICAL WASTE WATER SUMP PUMP PIT & CHEMICAL
SUMP PIT SHOULD BE PAINTED WITH CHEMICAL RESISTANT PAINT AND
ALL INSIDE SURFACE OF OILY WASTE WATER SUMP PUMP PIT & OILY SUMP PIT
SHOULD BE PAINTED WITH OILY RESISTANT PAINT.
E.3664.651
N.6083.813
D300, IL.3,400 LEGEND
E CHEMICAL WASTE WATER E
E.3658.197
N.6075.573 OILY WASTE WATER
D300, IL.3,300
BLOW DOWN (SUPPLIED BY PIPING)
SEAWASTE WATER
SEAWASTE WATER(NOT USED)
SWRO (SUPPLIED BY PIPING)
C = CHEMICAL WASTE WATER SUMP PUMP PIT

DWG.LIMIT E 3,820.000
O = OILY WASTE WATER SUMP PUMP PIT
DWG.LIMIT E 3,735.000

F C-S = CHEMICAL SUMP PIT F


E.3739.000
N.6103.873 O-S = OILY WASTE WATER SUMP PIT
D200, IL.3,560 IL = ELEVATION OF INVERT LEVEL
E.3739.566 S-P = SOAKAWAY PIT
N.6103.873
D200, IL.3,560
E.3749.411 E.3750.620 REFERENCE DOCUMENTS/DRAWINGS
N.6103.873 N.6103.873
DOC/DWG NO. TITLE
E.3740.776 D200, IL.2,350 D200, IL.3,560
NS2-UC07-P0ZEN-110002 PLOT PLAN
N.6103.873
NS2-XB02-P0UZT-165804 OILY & WASTE WATER DRAINAGE OVERALL LAYOUT DRAWING
D200, IL.2,350
G NS2-XB02-P0UZT-165807 OILY & WASTE WATER TRANSFER SUMP PLAN & SECTION DRAWING G
E.3762.680 DWG.LIMIT E 3,623.000 NS2-VK02-P0UZT-165808 OILY & WASTE WATER DRAINAGE STRUCTURE DETAIL DRAWING

DWG.LIMIT E 3,735.000
N.6103.873
8000 NS2-XG02-P0GM-110001~3 P&I DIAGRAM / WASTE WATER TRANSFER SYSTEM(CHEMICAL)
D200, IL.3,560
NS2-XG02-P0GM-110004 P&I DIAGRAM / WASTE WATER TRANSFER SYSTEM(SEAWATER)
E.3735.000 NS2-XG02-P0GM-110005~6 P&I DIAGRAM / WASTE WATER TRANSFER SYSTEM(OILY)
E.3762.180 N.6028.877 NS2-YD00-P0GM-120001 LAYOUT DRAWING OF WASTE WATER TRANSFER SYSTEM(VERTICAL)
N.6103.373 D200, IL.3,305
E.3749.410 NS2-YD00-P0GM-120002 LAYOUT DRAWING OF WASTE WATER TRANSFER SYSTEM(SUBMERSIBLE)
E.3750.620
D200, IL.3,560
N.6103.373 N.6103.373
D200, IL.2,350 D200, IL.3,560

5FCR1
FOR CONSTRUCTION
E.3738.516 E.3740.777
N.6103.373 N.6103.373 THIS DRAWING IS THE PROPERTY OF DOOSAN HEAVY INDUSTRIES VIETNAM.
H D200, IL.3,560 D200, IL.2,350 H
E.3715.069 E.3715.069 IT IS NOT TO BE COPIED OR USED IN ANY WAY DETRIMENTAL TO THE COMPANY.

N.6008.946 N.6008.946
E.3739.082 D200, IL.4,900 D200, IL.3,305 5FCR1 12.08.2022 FOR CONSTRUCTION
E.3762.180 E.3762.680 H.S.LEE H.S.LEE I.B.WEE
N.6103.373
N.6078.442 N.6078.442
D200, IL.3,560 5INT4 06.07.2022 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE
D200, IL.3,560 D200, IL.3,560
E.3762.680 5INT3 15.04.2022 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE

N.6077.202 E.3763.180
E.3762.180 D200, IL.2,320 5INT2 03.03.2022 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE
N.6076.065
N.6077.202
D200, IL.3,560
D200, IL.2,320 5INT1 12.08.2021 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE

E.3763.180
N.6076.065 E.3712.304 5 25.03.2021 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE
J J
D200, IL.2,320 N.6006.043
° REV. DATE DESCRIPTION DRAWN CHKD. APPD.
89 D200, IL.4,900 NO.

Project
E.3762.180 E.3773.191
N.6065.466 N.6075.847
E.3762.680 E.3820.000
D200, IL.2,320 D200, IL.3,050 NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
N.6074.824
N.6065.467 E.3772.681
E.3762.180 D200, IL.3,050
D200, IL.2,320 N.6075.858
N.6064.227 E.3763.180 D200, IL.3,560
D200, IL.3,560 N.6065.466
Owner

D200, IL.2,320
E.3763.180
K E.3761.680 N.6064.227 K
N.6058.700 D200, IL.3,560
D200, IL.3,600 E.3762.680 50° Owner's Engineer

E.3760.595 N.6064.227
N.6058.700 D200, IL.3,560
D200, IL.3,900 E.3735.000
N.5987.075
D450, IL.3,700 Contractor

DWG.LIMIT N 6,056.000 Doosan Heavy Industries Vietnam

L L
OILY & WASTE WATER DRAINAGE PLAN DRAWING-18 Sub-Supplier

SCALE : 1/300
DWG.LIMIT N 5,978.000
DRAWING TITLE

OILY & WASTE WATER DRAINAGE


OILY & WASTE WATER DRAINAGE PLAN DRAWING-19
SCALE : 1/300 PLAN DRAWING
M M
SCALE DRAWING NUMBER SHEET NO. REV. NO.

1 : 300 NS2-XB02-P0UZT-165806 14 OF 21 5FCR1


A1 (841 x 594)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTE
E.3762.180 E.3762.180 E.3762.680 E.3762.680 E.3762.680
N.6054.200 N.6054.506 N.6054.749 N.6054.442 N.6054.091 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
A A
D200, IL.3,305 D200, IL.3,560 D200, IL.3,560 D200, IL.3,305 D200, IL.3,305 NOTED AND COORDINATES ARE IN MILLIMETERS UNLESS
COAL ELECTRICAL OTHERWISE NOTED.
BLDG
E.3762.180
N.6051.466
DWG.LIMIT N 6,056.000 2. FINISHED GROUND LEVEL (FGL) = EL.+4,500mm
D200, IL.3,305 FINISHED GROUND FLOOR LEVEL(FGFL) = EL.+4,800mm
3. CONCRETE STRENGTH

130
VALVE PIT E.3763.180 5FCR1 1) f'c=30.0MPa : OILY & WASTE WATER DRAINAGE

°
°
2000Lx2000Wx1500D N.6053.795 2) f'c=13.8MPa : LEAN CONCRETE

135
E 3,752.869 E.3753.869 D200, IL.3,560 f'c=CYLINDER COMPRESSIVE STRENGTH AT 28 DAY
11
N 6,044.059 N.6044.059 799
D200, IL.3,305 4. REINFORCING BAR STRENGTH
E.3751.869 1) DEFORMED BAR
N.6044.059 250 2000 250 GRADE SD390, fy=400MPa
PN
TN

B D200, IL.3,305 E.3773.399 B


E.3762.680 N.6045.092 1000 1000
2500 5. CEMENT
E.3750.182 N.6053.295 TYPE OF CEMENT WILL BE TYPE 1 PORTLAND CEMENT FOR GENERAL
D200, IL.3,305 250 2000 250

13200
N.6044.059 D200, IL.3,560 APPLICATIONS AND FOR SEAWATER APPLICATIONS PORTLAND BLAST
5FCR1 D200, IL.3,305 E.3773.660 FURNACE CEMENT OR EQUIVALENT ALONG WITH WATERPROOFING
E.3762.680 N.6044.872 COMPOUND SHALL BE USED.

250
E.3741.716 E.3752.869 N.6052.854
N.6035.593 D200, IL.3,560 6. CONCRETE COVER (CAST-IN-PLACE CONCRTE)
N.6043.059 D200, IL.3,305

80
D200, IL.3,305

00
D200, IL.3,305 CAST-IN-PLACE CONCRTE(NON PRESTRESSED)
E.3741.292

200
E.3754.773

1000
COLUMN WALL
N.6035.169 E.3754.809 N.6044.059 CONDITION OF EXPOSURE FOUNDATION BEAM SLAB
D200, IL.3,905 N.6041.563 D200, IL.3,305 CONCRETE NOT
D200, IL.3,305 - 40 20
00 E.3752.869 EXPOSED TO WATER

2000
40
N.6041.563 E.3760.814 CONCRETE EXPOSED TO

1300
1800
C D200, IL.3,305 N.6035.558 E.3762.180 C
EARTH OR WEATHER 75 40 40
D200, IL.3,305 N.6034.192 (75) (75) (75)
(GROUND WATER

1000
D200, IL.3,610
E.3761.030 OR SEA WATER)

°
E.3762.180

140
N.6035.342

150
CONCRETE CAST AGAINST
D200, IL.3,610 N.6033.260 AND PERMANENTLY 75 75 75

300
E.3738.599 D200, IL.3,610 EXPOSED TO EARTH

250
E.3761.680 E.3762.180
N.6032.476
N.6026.894 N.6032.954 7. CHAMFERED CORNERS OF CONCRETE
D200, IL.3,905 ALL EXPOSED CORNERS (ANGLE OF 90° OR LESS) OF REINFORCE
D200, IL.3,325 D200, IL.3,305 100
E.3738.175 CONCRETE SHOULD BE CHAMFERED. (25mmX25mm)
N.6032.052 E.3762.680 8. ALL STEEL MATERIALS SHALL BE HOT-DIP GALVANIZED OR PAINTING.
D200, IL.3,305 E.3756.386
N.6020.554 N.6026.535
9. PIPE MATERIAL : -
D D200, IL.3,305 D200, IL.3,305 REGULAR WASTE WATER : HDPE D
E.3762.180 IRREGULAR WASTE WATER : HDPE
E.3756.750
N.6020.245
N.6026.717
D200, IL.3,305 A SECTION OILY WASTE WATER : HDPE
BLOW DOWN : GRE (DESIGNED & SUPPLIED BY PIPING ENG.)
D200, IL.3,305 DETAIL OF VALVE PIT - SCALE : 1/40 SEAWASTE WATER : HDPE
E.3757.133 SCALE : 1/40 10. ALL INSIDE SURFACE OF CHEMICAL WASTE WATER SUMP PUMP PIT & CHEMICAL
N.6019.924 2500 SUMP PIT SHOULD BE PAINTED WITH CHEMICAL RESISTANT PAINT AND
D200, IL.3,305 ALL INSIDE SURFACE OF OILY WASTE WATER SUMP PUMP PIT & OILY SUMP PIT
250 2000 250 SHOULD BE PAINTED WITH OILY RESISTANT PAINT.
DWG.LIMIT E 3,735.000

LEGEND
E CHEMICAL WASTE WATER E

200
OILY WASTE WATER
BLOW DOWN (SUPPLIED BY PIPING)
SEAWASTE WATER

1300
1800
SEAWASTE WATER(NOT USED)
SWRO (SUPPLIED BY PIPING)

DWG.LIMIT E 3,905.000
150
C = CHEMICAL WASTE WATER SUMP PUMP PIT
E.3735.000

300
O = OILY WASTE WATER SUMP PUMP PIT
N.5987.075
F D450, IL.3,700 COAL RUNOFF C-S = CHEMICAL SUMP PIT F
POND O-S = OILY WASTE WATER SUMP PIT
100

50° IL = ELEVATION OF INVERT LEVEL


S-P = SOAKAWAY PIT

REFERENCE DOCUMENTS/DRAWINGS
B SECTION DOC/DWG NO. TITLE

- SCALE : 1/40 NS2-UC07-P0ZEN-110002 PLOT PLAN


NS2-XB02-P0UZT-165804 OILY & WASTE WATER DRAINAGE OVERALL LAYOUT DRAWING

G NS2-XB02-P0UZT-165807 OILY & WASTE WATER TRANSFER SUMP PLAN & SECTION DRAWING G
NS2-VK02-P0UZT-165808 OILY & WASTE WATER DRAINAGE STRUCTURE DETAIL DRAWING
NS2-XG02-P0GM-110001~3 P&I DIAGRAM / WASTE WATER TRANSFER SYSTEM(CHEMICAL)
NS2-XG02-P0GM-110004 P&I DIAGRAM / WASTE WATER TRANSFER SYSTEM(SEAWATER)
NS2-XG02-P0GM-110005~6 P&I DIAGRAM / WASTE WATER TRANSFER SYSTEM(OILY)
NS2-YD00-P0GM-120001 LAYOUT DRAWING OF WASTE WATER TRANSFER SYSTEM(VERTICAL)
NS2-YD00-P0GM-120002 LAYOUT DRAWING OF WASTE WATER TRANSFER SYSTEM(SUBMERSIBLE)
25
00

E.3873.711 FOR CONSTRUCTION


N.5960.873

00
25
D200, IL.3,560
THIS DRAWING IS THE PROPERTY OF DOOSAN HEAVY INDUSTRIES VIETNAM.
H H
IT IS NOT TO BE COPIED OR USED IN ANY WAY DETRIMENTAL TO THE COMPANY.
E.3870.137
N.5956.615
5FCR1 12.08.2022 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE
D200, IL.3,560
E.3869.925 5INT4 06.07.2022 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE
N.5956.363
D200, IL.3,890 5INT3 15.04.2022 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE

E.3868.323 5INT2 03.03.2022 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE


N.5954.456
D200, IL.3,890 5INT1 12.08.2021 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE

E.3852.007
N.5935.024 E.3868.111 5 25.03.2021 FOR CONSTRUCTION H.S.LEE H.S.LEE I.B.WEE
J E.3852.007 N.5954.203 J
D450, EL.4,800 REV.
E.3808.655 N.5935.024 D200, IL.3,560 NO.
DATE DESCRIPTION DRAWN CHKD. APPD.

N.5925.518 D450, IL.3,700 40°


Project
D450, IL.4,900 E.3853.225
E.3851.010
N.5936.473
N.5933.835
E.3810.189 E.3810.189 D200, IL.3,560 NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
D450, IL.3,699
N.5927.352 N.5927.352 40° E.3853.225
D450, IL.4,900 D450, IL.3,700 E.3849.325 N.5936.473
N.5931.866 D200, EL.4,800 Owner
D450, IL.3,700
E.3851.997
E.3808.655 N.5933.011
K N.5925.518 D450, IL.3,839 K
D450, IL.3,700 97°
Owner's Engineer
E.3850.336
N.5931.022
D450, IL.3,839

Contractor

97° E.3833.042 Doosan Heavy Industries Vietnam


N.5912.361
L D450, IL.3,700 L
Sub-Supplier

DWG.LIMIT N 5,908.000 DRAWING TITLE

OILY & WASTE WATER DRAINAGE


OILY & WASTE WATER DRAINAGE PLAN DRAWING-20 PLAN DRAWING
M SCALE : 1/300 M
SCALE DRAWING NUMBER SHEET NO. REV. NO.

1 : 300 NS2-XB02-P0UZT-165806 15 OF 21 5FCR1