You are on page 1of 1

NGHI SON 2 BOT THERMAL POWER PLANT PROJECT

Issued Date: 11-Apr-2020 NOTIFICATION OF INSPECTION NOI Format Rev. 1 2

Project Inspection Inspection WSP NS2PC Doosan VINA contact


Location Discipline Activity Number Rev. NOI Number Desciption Document/Drawing No. Time Remark Works proposed after approval
Nam Date type assignment assignment (name and phone) Subcon
name

Mr. THUAN
NS2 045 ME OT A Pour sika grounting inspection for rail at Stacker/Reclaimer unit 2 NS2-XB01-P0EAF-650001 -Rev 0 17-Mar-2020 3:00 PM W Rail Installation Lilama
0985264428

NS2

NS2

NS2

NS2

NS2

NS2

NS2

NS2

NS2

NS2

NS2

NS2

NS2

NS2

NS2

NS2

Comments of owner/ Consultant:

EPC Contractor Consultant Owner


Doosan VINA WSP NS2PC

Position QA/QC Engineer

Name/Signature

Nguyen Van Huu

This NOI sheet for next whole day's inspection works on site shall be sent before 4:00 PM

Inspection type: H ( hold point), W ( witness) , R (Review), S (Surveillance)

Discipline: C (Civil), A (Architecture), M (Mechanical), E (Electrical), I (Instrument), P (Piping),

Page 1 of 1