Name of work:

(Revasa Village Construction


of
4-lane
km 818 00 of NH-2) 2s NH-29
a
Bypass Connecting NH-29 (near Sandaha Village km f 70 of NH- 23) with NH-2
Package-2) from Design chainago km 30.600 to
NAA km 57.320=26.720km (Total part of
Bypass to Varanasi (Phase.
Length 27 270km including interchange ioop at NH2) in the State of Uttar Pradesh under
NHDP Phaso.VA on EPC mode
GAMMON
GMN-0104-QAC-F100-00
CLIENT NATIONAL HIGHWAY AUTHORITY OF INDIA

AUTHORITY ENGINEER L.N. MALVIYA INFRA PVT. LTD


PRIVATE LIMITED
EPC CONTRACTOR GAMMON ENGINEERS ANDCONTRACTORS
REQUEST FORINSEPECTION

Date of inspection: |922


Date of Submission:
3/8/22
Time of Inspection : 2S N
RFI NO: (h¬ CPL|VNS ]Hw28s34

ITEM:

Chainagel
Location:
33+ s12 to 33+ 630 ( LHS)

Work
Geo ip ym
Description:
fiving o
Cncw)

Previous layer/ lift approved at above chainage: Yes / No

Enclosures 1Level Sheet


Reyested By
2 Field Density Test

4 For the EPCContractor


Inspected and recommended for:

Approval Not Approval Stretch Not Ready

Do the Remedial works as stated below but no further approval required.

Remedial works required as below re-inspection and Apprival required.

Comments if any:
Checeoo ound oK
Date: AUTHORITY ENGINEER's