Professional Documents
Culture Documents
PROJECT: NORTH-SOUTH COMMUTER RAILWAY EXTENSION (NSCREX) SUBCONTRACTOR INVOLVE IN THE WORK : HCC
REF. DOCUMENT: CPN-05HCC-T-D-POSCO-002- METHOD STATEMENT FOR ERECTION OF TOWER CRANE PLACE OF CONSTRUCTION/INSPECTION: DEPOT
1.0 Documentation
Ready Mix Concrete - Trial Mix / Raw materials sampling, testing &
Witness trial mix at batching plant As per TS 405 Prior to start of concrete pouring HP WP trial mixed test results, concrete design
review of TR / Plant Calibration.
Testing of concrete specimen 1 pair per 25 cubic meter or part thereof As per TS 206 Visual during concrete pouring HP WP compressive test results, design mixed
2.0 Earthworks
Material Prior to start work As per TS 103.2 witness thru 3rd party laboratory testing Laboratory test report, IR
backfilling every 200mm per layer As per TS 103.2, Method statement 95% compaction, thru FDT Laboratory test report, IR
Rebar works each location Visual, direct counting and measurement, HP HP approved cuttting lists, IR, method statement
and spacing and splice length, concrete
As per approved cutting list, FCD, TS and spacer and bar diameter as per approved
setting out plans Shop drawing
Formworks each location As per approved TS and FCD and shop Visual & measurement HP HP Approved Method Statement
drawings
Stripping of forms As per Technical Specs 4 days old for vertical and 7 days old for HP WP Approved Method Statement
each location soffit
TYPES OF INSPECTION
(R) : REVIEW (RI) : RANDOM INSPECTION (HP) : HOLD POINT (WP) : WITNESS POINT (NA) : NOT APPLICABLE
REVIEW (R) = Documents to be reviewed, no signature required on the Inspection Request or its accompanying documentation
HOLD POINT (H) = Attendance at the site is mandatory and signature is required on the check sheet of Inspection Request at the time of the inpsction to release the following work.
WITNESS POINT (WP) = Attendance at the site is expected, the signature is required on the check sheet of inspection
RANDOM INSPECTION (RI) = Random inspection at site, no signature request on the inspection request (IR) or its accompanying documentation
INSPECTION AND TEST PLAN FOR CPNO5 CONCRETING WORKS FOR ALL REV. 0
BUILDING DATE 7-Jul-21
PROJECT: NORTH-SOUTH COMMUTER RAILWAY EXTENSION (NSCREX) SUBCONTRACTOR INVOLVE IN THE WORK : HILLMARCS CONSTRUCTION CORPORATION
REF. DOCUMENT:1 METHOD STATEMENT FOR CONCRETE WORKS FOR ALL BUILDINGS PLACE OF CONSTRUCTION/INSPECTION: DEPOT
1.1 Permit to work Prior to start of work Approved permits Valid permits HP HP HP R R Valid permit
1.3 Ensure approved method statement Prior to start of work Approved Method Statement Approved method of statement HP HP HP R R Approved Method Statement
3rd Party Inspection Certificates & Eligibility 3rd Party Inspection Certificates, Eligibility
1.4 Lifting equipment inspection & operators eligibility Prior to start of work Approved Method Statement HP HP HP R R
Certificates for operators Certificates
4.0 REINFORCEMENT
Fabrication according to the approved bar
W
bending schedule list and bar bending
o
diagram by the Engineer.
r
TS 207.4, Approved bar bending k
schedule (BBS) and Material Test Reinforcement shall be free from dirt, loose
4.1 Fabrication of Reinforcing Bars Each fabrication HP HP WP RI RI Inspection Report Checklist I
Frequency NSCR-PSC-N05-MAB- rust or scale, mortar, grease, oil
DPT-PLN-QA-000010 n
The numbers, grade, sizes, forms, position s
and splicing of bars shall be as per p
approved shop drawing & BBS. e
c
t
All reinforcement shall be rigidly fixed in i
position and the concrete cover is o
maintained as per approved shop drawing. n
As per approved plan the
concrete cover to reinforcement shal be as R
follows: cast in- e
situ= 100mm q
FORM NO. CPN05-POSCO-QA-002 concrete
INSPECTION cast
AND TEST against
PLAN and permanently
FOR CONCRETING WORK FOR ALL BUILDINGS Page 2uof 5
exposed to earth=75mm e
s
p
e
INSPECTION CARRIED OUT c
FREQUENCY OF APPLICABLE REFERENCE t
ITEM DESCRIPTION OF INSPECTION/TESTING
INSPECTION AND/OR DOCUMENTS, SPECIFICATION & ACCEPTANCE
All reinforcement shall CRITERIA
be rigidly fixed in SUBCONTRACTOR POSCO E&C VALIDATING REPORT/DOCUMENTS i
NO. ACTIVITIES
TESTING CLAUSE position and the concrete cover is ENGINEER o
maintained as per approved shop drawing. CONSTR QC CONSTR QC n
As per approved plan the
concrete cover to reinforcement shal be as R
follows: cast in- e
situ= 100mm q
concrete cast against and permanently u
exposed to earth=75mm e
TS 207.6, Approved drawings and cocnrete exposed to earth or s
Quality Control Plan for Concrete weather dia.20mmm to 36mm=70mm, t
4.2 Inspection of Installed Reinforcing Bars After Installation HP HP HP WP RI Inspection Checklist
Works NSCR-PSC-N05-MABDPT- concrete not exposed to weather
PLN-QA-000008 or in contact with ground. slabs and walls (
dia. 42mm and 48mm, W
dia.36mm and smaller=40mm I
beams and columns=40mm R
shells, folded plate )
members=30mm . Bars /
shall be tied at all intersections around the
perimeter of each mat and at not less than I
600 mm centers or at every intersection, n
whichever is greater s
p
e
5.0 EMBEDDED ITEMS c
t
Approved Drawings for Electrical/Mechanical/ i
5.1 Installation of embedded items (tower mast) Each structure TS 404.1.1 (4), TS 404.2.1 As per manufacturer drawings HP HP HP WP RI o
Plumbing Penetrations
n
R
e
5.2 Installation of Grounding (if any) Each structure TS 206.9 As per manufacturer drawings HP HP HP WP RI Survey report p
o
r
t
6.0 FORMWORKS C
h
e
c
The structural design of formwork shall k
conform to the ACI Standard 347, Guide to l
Fabrication / Installation Formworks / False works Formwork for Concrete or some other i
TS 203.4, TS 203.3.4, TS 404 and Work Inspection Request (WIR)/ Inspection
6.1 Level / Position / Alignment of formworks Each Area generally accepted and permitted standard / HP HP HP HP RI s
Approved drawings Report Checklist / Survey Report
Approved drawing and shall be mortar tight, t
true to the dimension, shape, surface
smoothness,
Checking of Concrete Grade as per Approved Mix Approved Concrete Mix Design by Approved Drawings, required concrete
7.1 Each Structure compressive strength for each structure
HP HP HP WP RI Delivery Receipt / Concrete pouring record
Design and Quantity the Engineer
7d = 3 cylinders;
28d = 3 cylinders;
TS 206.7.5, Approved Drawings and Spare = 3 cylinders
Material Test Frequency NSCR-
7.3 Sampling of Freshly Mix Concrete Every 25 cu. M HP HP HP WP RI Laboratory Test Reports
PSC-N05-MAB-DPT-PLN-QA-
000010
FORM NO. CPN05-POSCO-QA-002 INSPECTION AND TEST PLAN FOR CONCRETING WORK FOR ALL BUILDINGS Page 3 of 5
INSPECTION CARRIED OUT
FREQUENCY OF APPLICABLE REFERENCE
ITEM DESCRIPTION OF INSPECTION/TESTING
INSPECTION AND/OR DOCUMENTS, SPECIFICATION & ACCEPTANCE CRITERIA SUBCONTRACTOR POSCO E&C VALIDATING REPORT/DOCUMENTS
NO. ACTIVITIES
TESTING CLAUSEDrawings and
TS 206.7.5, Approved ENGINEER
Material Test Frequency NSCR- CONSTR QC CONSTR QC
7.3 Sampling of Freshly Mix Concrete Every 25 cu. M HP HP HP WP RI Laboratory Test Reports
PSC-N05-MAB-DPT-PLN-QA-
000010 Compressive Strength of Concrete varries
on concrete structure member required on
the approved drawings & specifications
Every Concrete
9.1 Identify Type of Exposed Surface Defect TS 206.14 Concrete shall be free from every defects HP HP HP WP RI Visual Inspection
Structure Member
FORM NO. CPN05-POSCO-QA-002 INSPECTION AND TEST PLAN FOR CONCRETING WORK FOR ALL BUILDINGS Page 4 of 5
INSPECTION CARRIED OUT
FREQUENCY OF APPLICABLE REFERENCE
ITEM DESCRIPTION OF INSPECTION/TESTING
INSPECTION AND/OR DOCUMENTS, SPECIFICATION & ACCEPTANCE CRITERIA SUBCONTRACTOR POSCO E&C VALIDATING REPORT/DOCUMENTS
NO. ACTIVITIES
TESTING CLAUSE ENGINEER
CONSTR QC CONSTR QC
TYPE OF INSPECTION
(R) : REVIEW (RI) : RANDOM INSPECTION (HP) : HOLD POINT (WP) : WITNESS POINT (NA) : NOT APPLICABLE
REVIEW (R) = documents to be reviewed, no signature required on the Inspection Request or its accompanying documentation. WITNESS POINT (WP) = attendance at the site is expected, the signature is required on check sheet of Inspection
HOLD POINT (H) = attendance at the site is mandatory and signature is required on the check sheet of Inspection Request at the time of the inspection to release the RANDOM INSPECTION (RI) = random attendance at site, no signature required on the Inspection Request ( IR ) or its
following work. accompanying documentation
FORM NO. CPN05-POSCO-QA-002 INSPECTION AND TEST PLAN FOR CONCRETING WORK FOR ALL BUILDINGS Page 5 of 5